Revised Application to Amend CPPR-141,extending Const Completion Date to 841231
ML17298A552
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/07/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17298A551 List:
References
NUDOCS 8309150275
Download: ML17298A552 (6)


Text

+v UNITED STATES OF 'AMERICA NUCLEAR REGULATORY COMMISSXON In the Matter of )

)

ARIZONA PUBLIC SERVICE )

COMPANY, et al. ) Docket No. STN 50-528

)

(Palo Verde Nuclear Generating )

Station, Units 1, 2 and 3) )

)

REQUEST FOR EXTENSION OF THE LATEST COMPLETION DATE FOR CONSTRUCTION PERMIT NO. CPPR-141 On May 12, 1983, pursuant to 10 CFR 550.90, Arizona Public Service Company (APS), Salt River Project Agricultural Xmprovement and Power District (SRP), El Paso Electric Company (EPE Southern California Edison Company (SCE), Pub 1 ic Service p

Company of New Mexico (PNM), and Southern Cali fornia Public n

Power Authority (SCPPA) (hereinafter collectively referred to as "Joint Applicants" ) submitted its "Request for Extension of the Latest Completion Date for Construction Permit No. CPPR-141."

Such Request, pursuant to 10 CFR 550.55(b), sought an extension of the latest date for completion of construction of Unit 1 of the Palo Verde Nuclear Generating Station (PVNGS) from August 31, 1983, to December 31, 1983. Such Request is now pending before the Commission.

The Joint Applicants, on the basis of the regulations previously cited, herewith amend such Request and now seek an exten-8309150275 830909 PDR ADOCK 05000528

sion of the latest date for completion of Unit 1 of PVNGS from August 31, 19 83, to December 31, 19 84.

Zn support of this Request, APS states as follows:

X. Extension of Latest Da for Completion of Unit l.

l. On May 25, 1976, the Nuclear Regulatory Commission issued a permit to construct PVNGS Unit 1 {CPPR-141) . Paragraph 3A of such permit specified the latest date for completion to be November 1, 1982.
2. By an Order issued on November 4, 1982, the Com-mission extended the latest completion date for CPPR-141 from November 1, 1982, to August 31, 1983, as requested by APS in its letter da2hd October 12, 1982.
3. 'VNGS Unit 1 cannot be made ready for fuel load-ing by August 31, 1983, even though APS has made every effort to do so in a manner consistent with APS'edication to design and construct a safe and reliable unit which meets the commit-ments made in the'VNGS Final Safety Analysis Report (FSAR) and the requirements of the NRC. The delay in completion of PVNGS Unit 1 beyond August 31, 1983, is due to the following factors:

A. Late delivery of certain electrical instru-mentation and control equipment; B. Changes and additions to the PVNGS design required to meet NUREG-0737 requirements and other changes in regulatory requirements necessary for an operating license have introduced complexities

0 ~

f

~

which have impacted and delayed preoperational testing and the transition from the construction phase to the startup phase.

C. Corrections of deficiencies discovered during and subsequent to the hot functional tests conducted for PVNGS Unit 1 cannot be com-pleted until sometime after December 31, 1983.

4. The extension of the latest completion date for the construction of PVNGS Unit 1 does not present. an unreviewed environmental impact. Pursuant to 10 CFR 551.5(d)(4), no environ-mental impact statement, negative declaration, or environmental impact appraisal need be prepared in connection with such extension.
5. The extension of the latest completion date for the construction of PVNGS Unit 1 does not involve a significant hazards consideration and is not inimical to the common defense and secur-ity or to the health and safety of the public.

WHEREFORE, Joint Applicants request that Paragraph 3A of Construction Permit No. CPPR-141 be amended by order of the Nuclear Regulatory Commission to provide that the latest date for completion of PVNGS Unit 1 is December 31, 1984.

Respectfully submitted, ARIZONA PUBLIC SERVICE NPA By Edwin.n E. Van Brunt, Jr.

Vice President, Nuclear Projects On its own behalf and as agent for all other Joint Applicants Dated: September 7, 1983

~ ~

STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA)

Jr., represent that I am'ice President, Edwin E. Van Brunt, Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E. Van Brunt, Jr.

Sworn to before me thin~dot dey of l983.

N tary Pu lic,,

r My Commission Expires:

My Commlsslte Expires April 8, 1987 'ii~.ji'tl>~

L'

,(~'

-'g'o

  • A h l"

~ ate ~ p>gi.>