SUBJECT:
Notifies that util Hill provide plant specific info re depr essurization h
.DHR capabilities by 830731ginstead of pnevious schedule date of 830930
'I'STRIBUTION CODE:
B001S
.-COPIES RECEIVED: LTR
- ENCL, SIZE; TITLE: Licensing 'Submittal;.PSAR/FSAR Amdts 8 Related Correspondence
NOTES:Standardized;plant<
'Standardized
- plant, "Standardized plant ~
05000528 05000529 05000530 REGULATO NFORMATION DISTRIBUTION TEM.(RIDS)
AGC5S5ION NBR:8305310161 DOC ~ DATE: 83/05/20 NOTARIZED; NO DOCKET FACIL:STN-50 528 Palo Verde Nuclear Stationi Uni;t iq Arizona Publi 05000528
-ST@-50-529 Palo Verde Nuclear Stations Unit 2i Arizona Publi 05000529 STN-50 530 Palo Verde Nuclear Stationi Uni,t 3i Arizona Publi 05000530 AUTH ~ NAME
'UTHOR AF F ILIATION VAN BRUNTiE,E, Arizona ipublic Sei vice Co.
~REiCIP ~ NAME RECIPIENT AFFILIATION KNIGHTONgGe Licensing Branch 3
INTERN RECIPIENT ID CODE/NAME NRR/OL/ADL NRR LB3 LA AL: ELD/HDS3 IE/OEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB 1i NRR/OE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 2Q NRR/DE/SGEB
-30 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 B
22 F.B
.04 RM/ DDAMI/MI8 COPIES J.TTR ENCL 1
1 1
3 i
2 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAi E, 01 IE FILE IE/OEP E 8/I'R 8 3 5 NRR/DF/AEAB NRR/DF/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/HFEBCO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DS I/PSB 19 NRR/DSI/RSB 23 RGN5
'COPIES LTTR ENCL 1
1 1
1 2
1 2
1 1
1 1
1 1
1
'3 EXTFRNAL; ACRS 41 DMS/OSS (AMDTS) 03 NSIC 05 6
1 1
BNL(AMDTS.ONLY)
FEMA REP OIV 39 NRC.PDR 02 NTIS
'TOTAL NUMBER OF COPIES REQUIRFD:
LTTR 55 ENCL P8
~
'~.
'fig p
Ii I lf %~
I f K 1
I f I ffJ4: '
f ),
g, "fi I, fry I
ri
.k j fl'I
'p 1
ri g,
il lf+ 'l f I 1 ff I
-:l s
o o
1 t
4
~
N 1
14 ff,r ff 4
ff Ilr 1
).g
~
'l f ~
lf Ijfr'
'fi 1 l" f C t k'flr'f il I
If 4<<
yf g
'l, 'f-; f'I4
,y'I
~
ir
~ ~~~ em~~ rr3I~ gag
~ '%$
if rP )'+
I "$
Q 4 ),,ryr4 4II r t
<<t
)
f Iriiff l
1, II I, 4t y 1
y'4 h
~ IIff I,g g
%II 'f>
lr
~
N
~ fii l
5 41 II r
i' Ii S
fI gI J
11 11fr I'
'44 4',
<% I yrI r
41
\\
rr y
y I
f$
if rl, hi' lI Iii J44 If r
)
Arizona Public Service Company P.o. BOX 21666
~
PHOENIX, ARIZONA 65036 May 24, 1983 ANPP 23878-MFH/MJW Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U. S. Nuclear* Regulatory Commission Washington, DC 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 6 3 Docket Nos.
STN-50-528-529-530 File:, 83-056-026/G.1.01.10
Reference:
(A)
Letter from T. H. Novak, NRC to E. E. Van Brunt, Jr.
dated April 20,
- 1983, "CE Owners Group Study on Depressurization and Decay Heat Removal Capability of CE Plants Without PORV's" (B)
Letter from A. E. Scherer, Combustion Engineering, to D. G. Eisenhut, NRC, dated February 28, 1983 (C)
Letter from R.
W. Wells, Chairman CE Owners Group to D.
G. Eisenhut, NRC, dated October 28,
- 1982, "Response to NRC Questions on Depressurization and Decay Heat Removal Capabilities in Combustion Engineering Plants"
Dear Mr. Knighton:
Reference (A) discussed information required to evaluate depressurization and decay heat removal capabilities in CE plants without PORV's and stated that:
"As a result of the Commission's
- concern, we now intend to make our decision regarding the need for PORV's in the plants based on all information received by June 30, 1983.
- Thus, you should ensure that the necessary information has been submitted to the NRC staff by this date if you wish it to be consider'ed in the decision-making process."
I must express my concern with your position that the NRC's decision will be based only upon information submitted by June 30, 1983.
In October
- 1982, the NRC was informed by the CE Owners Group, Reference (C), that the first plant specific submittal would be submitted by June 30, 1983 with subsequent plant-specific reports to be provided at one and one-half to two-month intervals.
Again, in February,
- 1983, CE informed the staff, Reference (B),
that the generic portion of the questions would be answered in a report submitted by June 30, 1983 and that the remaining questions would be answered in individual plant specific submittals.
8305310f 61 830527
> oR oooo'oooooos poR
@0Io I I/O
A great deal of time and effort has been expended by CE, the CE Owners Group, ourselves and other utilities to support your evaluation.
We believe that all information to be provided is necessary for a proper evaluation of the need for PORV's.
At the same time, we do recognize the NRC's concern for an expeditious resolution of this issue.
Therefore, we have accelerated our schedule by two months to provide Palo Verde specific information by July 31, 1983 (earliest date possible) rather than the previously scheduled September 30, 1983 date.
Considering the amount of detailed material which will be submitted by the Owners Group and other utilities, and the necessity for a detailed review by the NRC staff, we believe this new submittal schedule is responsive to the staff's needs and need not delay the NRC's decision-making process.
ft is most likely that our plant specific results will be very similar and comparable to the San Onofre Units 2 and 3 (lead plants) results.
- However, we also strongly believe that our plant specific information should be the basis for any decisions regarding the need for PORV's in Palo Verde.
Very truly yours P.g. m~
E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/MJW/sb cc:
E. Licitra A. C. Gehr
C'>..3 s
~
.e H
I I'I