Text
0
~
MAY 9
)983 DISTRIBUTION
}Document Control 58-528 NRC PDR L PDR NSIC PRC System
~~
Docket No.:
50-528 Hr. E. E. Van Brunt,. Jr.
Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036 LBIIII3 Reading JLee EALicitra
- Attorney, OELD
- Jordan, IE
TMNovak
Dear Hr. Van Brunt:
Subject:
Schedule for Resolution of Remaining Issues on Palo Verde Unit 1
At the present time, there are a number of issues ralating to the review of the Palo Verde FSAR which will require resolution prior to a decision on an operating license for Palo Verde Unit 1.
Some of these issues concern matters which are currently under staff review.
For the remainder of the issues, the staff is waiting for your submittal of additional information w'hich >re have previously identified to you.
In order for the staff to complete its review of those issues, so as not to impact your fuel load date for the Palo Verde Unit 1, we will need your submittals on those matters in a timely manner.
Enclosure 1 provides a listing of the issues which require resolution for Palo
.Verde Unit 1.
Those issues which are currently under staff review are noted accordingly.
For the remainder, we request that you provide a firm date for submittal of the required inforc>ation to permit the staff to complete its review.
In addition to providing the dates requested
- above, we ask that you advise us of any changes you plan to make to your OL application, including dates for submittal, which will require staff review and approval.
As an example, we understand that you may, be considering a revision to your currently approved security plan.
You should also provide the dates for submitting the information which addresses the additional CESSAR interface requirements (e.g., certification of fuel system analyses and the plant specific information concerning statistical combination of uncertainties) which are identified in Supplement No.
8305240038 830509 PDR ADQCK 05000528.
A PDP OFFICE/
SURNAME/
DATE$
NRG FORM 318 (10.80) NRCM 0240
~ 0 ~ ~\\ ~ 0 ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0
~ ~
~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ 0 ~ 0 ~ ~ ~
~ ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ ~ 0 ~ ~ 00 ~ 0 ~ 00 ~
~ 0 ~ ~ ~ ~ 0 ~ ~ ~ 00 ~ 0 ~ ~ 0 ~ 0 ~ 00 ~ 0
~ 0
~
~
~ ~ ~ 0 ~ 0 ~ 0 ~ ~ ~
~ ~ 0 ~ 0 ~ ~ 0 ~ ~ 0 ~ ~ 0 ~ 00000'
~ 0 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ 00 ~ 0 ~ 0 ~ ~ 0 ~
OFFICIAL RECORD COPY uS0FD: SeSS~roeo
~ 0
Mr. E. E.
Van Brunt, Jr.
l(e ask that you respond to this request within two iveeks of receipt of this letter. If you have any questions regarding the letter, you should contact Manny Licitra, the Licensing Project Manager.
Also, advise us if you need any clarification regarding our outstanding requests for information.
Sincerely, 00ginal signed by:
Goofge W. Knighton George W. Knighton, Chief Licensing Branch No. 3 Division of Licenisng
Enclosure:
As stated cc:
See next page OFFICE/
SURNAME/
DATEf DL:LB¹ EALicitr y 5/g /83
~ ~ ~ ~sf o ~ oo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
8 i hton 5/
/83
~
~ ~ ~
~
~
NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~39.960
C
Palo Verde
~
~
~
Mr. Rand L. Greenfield Assistant Attorney General Bataan Hemorial Building Santa Fe, New Mexico 87503 Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company'.
0.
Box 21666
'hoeni x, Arizona 85036 cc:
Arthur C. Gehr, Esq.
Snell 5 Milmer
'100 Valley Center
- Phoenix, Arizona 85073 I
'harles S. Pierson
, Assis'tant Attorney. General
. 200 State. Capitol
~
1700 Mest Washington Phoenix,'Arizona 85007 I
I Charles R. Kocher, Esq
. Assistant Counsel
'ames A. Boeletto, Esq.
~ 'outhern Cali fornia Edison C'ompany'.
0.
Box 800
- Rosemead, California 91770
't V's. margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 R'egi'onal Adminstrator-Region V
U. S. Nuclear Regulatory Commission'.
1450 Maria Lane Suite 210 Walnut Creek,'alifornia 94596 Kenneth Berl in, Esq.
Wi'nston 5 Strawn Suite 500 2550 M Street, N.
W.
Washington, D.
C.
20037 C
Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, N.
M.
Washington, D.
C.
20009 Resident Inspector Palo Verde/NPS U. S. Nuclear Regulatory Commission P.
0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S.
26th Street Phoenix-, Arizona 85040
ENCLOSURE DIVISION OF SYSTEMS INTEGRATION Review Area SER Section Item Identification ICSB 7.6.2 7.7.2 7.7.2 Low Temperature Overpressure Alarm qualification of Control Systems Control System Failures (under staff review)
RSB 5.4.3 6.3.1 6.3.3 II.B.1 18.0(SSER81)
Test Program Modifications (accumulator)
NPSH for ECCS Pumps ECCS Sump Testing RCS Vent Procedures (guidelines)
Reliability of Shutdown Heat Removal System (PORV issue)
PSB 8.1 8.4.6 8.4.7 PSB Site Audit Issues Load Sequencer
()A (under staff review)
Undervoltage Protection ASB 9.2.5 9.5.1.6 3.5.1.1 3.5.1.2 (FSAR)
Spray Nozzle Missile Protection (under staff review)
Alternate Shutdown L
f Joy Fan Blade Missile
II
~
~
DIVISION OF SYSTEM INTEGRATION Review Area CPB SER Section 4.2.1 4.4.1 7.2.4 II.F.2 Item Identification Seismic and LOCA Loads (fuel assemblies)
Training Program for LPMS (under staff review)
CPC Software Modifications Information on ICC System AEB 6.4 6.5.2 15.4.8.2 III.D.3.4 LOCA Doses due to Sump pH LOCA Doses in Control Room
I 4
l
DIVISION OF ENGINEERING Review Area MEB SER Section 3.9.7 II.D.1 App. 3A App.
5A (FSAR)
Item Identification Categorization of Pressure Isolation Valves (under staff review)
Relief and Safety Valve Test Program (under staff review)
Leak Testing of Check Valves EQB 3.9.3.2 3.10 3.11 3.11 II.E.4.2 Pump 8 Valve Operability Audit Issues Seismic Qualification Site Audit Issues (under staff review)
Environmental Qualification Review Environmental Qualification Site Audit (to be scheduled)
Operability of Containment Power Access Isolation Valves (under staff review)
CMEB 9.5 Fire Protection Site Audit Issues
~
~
DIVISION OF HUMAN FACTORS SAFETY Review Area PTSB SER Section 15.3.9 I.C.1 Item Identification ATWS Procedures Procedures for Transients and Accidents (guidelines)
HFEB I.D.1 Control Room Design Review OTHER SCOPE EPLB QAB 13.3 17.5 (SSER84) 1.8 (FSAR)
Emergency Pl arming Quality Classification of Components Regulatory Guide 1.38
( receipt and storage regui rements)
,r