Docket Nos.:
50-528, 50-529'dd 50-530 HEHORANDUH FOR:
FROM:
SUBJECT:
Janis D. Kerrigan, Acting Chief, Licensing Branch No. 3, DL E. A. Licitra, Project Hanager, Licensing Branch No. 3, DL
~
FORTHCOMING'SITE AUDIT OF IÃSYSTEHS AT PALO VERDE PLANT DATE Fc TIt<E:
LOCATION:
PURPOSE:
PARTICIPANTS:
November 3 ~ 4, 1982 9:00 am Administrati'o'n Building Palo Verde Site Haricopa Cou'nty, Arizona To conduct a"site audit of various I8C systems.
(See attached agenda)
NRC StaffI" ".,"
J.
Rosenthal:,"
G. Gunes, J. Eckhardt, J. Burdoin, E. Licitra APS E. Sterling~'J.
Rowland, T. Juan Bechtel I,K. sotetopou1os;
.L.Delaoey,.
~
CE P. Ilolf a
/s
'A'ttachment
'~
As stated cc:
See next page E. A. Licitra, Project Hanager Licensing Branch No.
3 Division of Licensing DL: LBlII3 EALicitra y OFFICE/
SURNAME/
.10+//82 DL:L
\\
~ ~ ~ ~
~
~ ~ ~ 0 i gan
~ ~ ~ 0 ~ 0 ~ ~ ~ t/ ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ ~
10/g//82 NR 8211080455 821021 PDR
- DOCV, 05000528 A.
PDR OFFICIAL RECORD COPY USG PO1 1981~~960
t+~
h I
I I
t 9I
Palo Verde Hr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 cc:
Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007
.Regional Adminstrator-Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, Ca 1 ifornia 94596 Charles R. Kocher, Esq., Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P.
0.
Box 800
- Rosemead, California 91770 J
V>. margaret Walker Deputy l3irector of Energy Programs Economic Planning and Development Office 1700 Wes t-Washing ton Phoenix, Arizona 85C".7 Hr.
Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U. S. Nuclear Regulatory Commission P.
0.
Box 21324 Phoenix, Arizona 85001 Hs. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona Lynne A. Bernabei, Esq.
Harmon 5 Weiss
'725 I Street, N.
W.
Suite 506 Washington, D.
C.
20006
PALO VERDE SITE VISIT AGENDA '0 INSTRUMENTATION AND CONTROL SYSTEMS BRANCH 1.
Preliminar Discussion a.
Plan for touring plant including a general discussion of the plant layout b.
Special interest areas 2.
Control Room a.
Review general layout b.
Examine CPC/CEAC configuration and interface with plant computer c.
Examine ICC display d.
Examine Bypass and Inoperable Status Indication e.
Exarhine controls 1.
Manual trip Z.
Emergency Feedwater 3.
Atmospheric Steam Dump 4.
HPSI 5.
Charging/Letdown f.
Examine process instrument,
Review rod position indication h.
Review PPS manual initiation and status panels 3.
'Shutdown from Outside the Control Room a.
Location of remote shutdown panels b.
General layout/identification c.
Examine physical separation and electrical isolation of redundant equipment d.
Examination of transfer switches
y rL'e ~ bv
~ '.
Cable Runs and Cable S readin Area a.
General layout b.
Implementation of separation criteria 5.
Reactor Tri S stem a.
Examine motor generator sets b.
Examine switchgear c.
Examine supplementary protection system 6.
Vital Instrumentation and Control Power Su lies a.
General layout b.
Inverters c.
Batteries 7.
Circuit Traces from Sensors to Final Actuation Devices (During these walkdowns particular attention is afforded to physical separation of redundant
- channels, terminations, associated cabling, isolation from non-lE circui try) a)
From pressurizer tap root valve, through RPS to switchgear b)
From steam generator root valve through ESFAS to auxiliary feedwater pump c)
From radiation monitor through CREVICS to control room ventilation damper d)
From load sequencer/load shed cabinets to standby service water pump e)
From control room through remote shutdown transfer switches to atmospheric dump valves f)
From RHR letdown isolation valve limit switches to control room indication g)
From pressurizer relief valve position sensors to control room indication h)
From radiation monitor through FBEVAS to fuel building ventilation damper i)
General tour plant computer, A/D input, field multiplexing
r
Document Control
(
- 528/529/530)
NRC PDR L PDR TERA NSIC LB83 Reading Lee
. Kerrigan Project Manager EALicitra E.
Case D. Eisenhut/R.
Purple T.
Novak J.
Youngblood A. Schwencer J. Kerrigan E.
Adensam C.
Thomas G. Lainas W. Russell D. Crutchfield T. Ippolito J.
P. Knight W. Johnston i..cruller T. Speis R. ttouston
- i. '~ubenstein F. Schroeder M. Ernst
- l. Kramer ri a 'a".v'"s i>ey y OELD Jol dOll Regional Adminstrator, Region ACRS (16)
OSD (7)
J.
M. Taylor PARTICIPANTS NRC):
MEETING NOTICE
>)CT
-'Rosenthal GGunes
'JCkhardt JBurdoin ELicitra
0
~,