Requests Schedule for Submittal of Info Listed on Encl, Necessary to Enable NRC to Complete Review of SER Suppl 3 Open & Confirmatory Issues
ML17297B742
Person / Time
Site: Palo Verde  
Issue date: 09/29/1982
From: Kerrigan J
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8211010067
Download: ML17297B742 (12)


Text

~,

ggP 3g%N DISTRIBUTION

..-Document Controls

~PRC System L PDR NRC PDR NSIC Docket Nos. 50-528/529/530 Mr. E. E.

Van Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036

Dear Mr. Van Brunt:

LBk'3 Reading JKerrigan MLicitra JLee

OELD OI8(E ACRS(16}

Subject:

Schedule for Resolution of Remaining Issues on Palo Verde Nuclear Generating Station o

At the time the Palo Verde SER was issued in November 1981, there remained a number of open and confirmatory issues vihich required resolution.

Subsequently, you have provided additional information for many of those issues s>hich resulted in their resolution, as documented in Supplement Nos. 1.

2 and 3 to the SER.

Sections 1.9 and 1.10 of Supplement No. 3 sumarize the remaining out-standing and confirmatory issues which need to be resolved; Enclosure 1 to this letter lists those issues according to technical review area.

In order that we may establish a schedule for the issuing of the next supplement to the SER, we'.request that for each issue in Enclosure 1, you provide us with the date when you will submit the necessary information for the staff to complete its review.

,llhere you have already provided information, those issues are shown as being under staff review.

Please advise us within two (2) weeks of receipt of this letter as to when you plan to respond to this request.

Ifyou have any questions regarding this request, contact E. Licitra, the Project Manager.

on (301) 492-7200.

Sincerely.

/s 82iiOi0067 820929 PDR ADOCK 05000528 E

PDR E

1 nc osure:

As stated Janis D. Kerrigan, Acting Chief Licensing Branch 83 Division of Licensing OFFICE/

SURNAME/

cc:.See n xt page DL:LB&'3~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

ELicitra ". I DL:L 83

~ ~ ~ ~ ~ ~ ~

~ ~

~ o9 o ~ ~ ~

~ ~

~ ~ ~ ~ ~

~ ~ ~ ~ ~

DATE$

~ ooooosoooaooaaooosso

~ s ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oo ~ sao ~ ~ ~ o ~ oa 0948o62o

~ o ~ ~ ~

D2 NRG FOAM318 {10-80) NRCM 0240 OFFICIAL RECORD COPY VSGPO: 1881&3&9/0

I n

k

. Palo Verde Mr. E.

E.

Van Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company P. 0.

Box 21666

Phoenix, Arizona 85036 Regi ona1 Administrator -Regi on Y.

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 2l0 Walnut Creek, Cali forn'ia. 94596 CC:

Arthur C. Gehr, Esq.

Snell 8 Wilmer 3100 Valley Center

Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington
Phoenix, Arizona 85007 Charles R. Kocher, Esq., Assistant Counsel James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington
Phoenix, Arizona 85007 Mr.

Rand L. Greenfield Assistant Attorney General Bataan Memorial.Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U;S. Nuclear Regulatory Comnission P. 0.

Box 21324

Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street
Phoenix, Arizona Lynne A. Bernabei, Esq.

Harmon

& Weiss 1725 I Street, N.W.

Suite 506 Washington, DC 20006

y ~

ENCLOSURE DIVISION OF SYSTEMS INTEGRATION Review Area ICSB SER Section 7.1.3.5 7.4.2 7.6.2 7.7.2 7.7.2 Item Identification ISC Site Audit (to be scheduled)

Revised Drawings for alternate s.hutdown Low Temperature Overpressure Alarm gualificati.on of Control Systems.

Control System Failures.

CSB 6.2.1.1 6.2.4 6.2.5 6.2.6 TMI Instrumentati,on Data for Containment (under staff review)

Valve Modifications (CH-HV 255 5 524)

Hydrogen in RDT Room (under staff review)

Containment Leak Testing (under staff review)

RSB 5.4.3 5.4.3 5.4.3 6.3.1 6.3.3 18.0(SSER81)

II.B.1 Test Program Modifications (accumulator)

Valve Modificati.on (feedline from RWT)

'ower for Low Flow Alarm on LPI Pumps NPSH for ECCS Pumps ECCS Sump Testing Reliability of Shutdown Heat Removal

System (under staff review)

RCS Vent Procedures (guidelines)

PSB 8.1 8.4.3 8.4.6 8.4.7 PSB Site Audit (to be scheduled)

Design Modifications to Containment Electrical Penetrations Load Sequencer gA Undervoltage Protecti.on

I

Division of Systems Integration Review Area SER Section 9.2.5 9.5.1.6 II.E.1.1 Item Identification Spray Nozzle Missile Protection (under staff-review)

Alternate Shutdown Endurance Test Results.

CPB 4.2.1 4.4.1 7.2.4 II.F.2 Seismic and LOCA Loads.

(fuel assemblies)

Training Program for LPMS CPC Software Modifications Information on ICC System AEB 6.4 6.5.2 15.4.8.2 II.D.3.4 LOCA Doses.

due to Sump pH LOCA Doses in Control Room

~'t

DIVISION OF ENGINEERING Review.

Area NEB SER Secti.on 3.9.2 3.9.7 II.D.1 Item Identification Results of Piping Dynamic Testing Categorization of Pressure, Isolation Val ves Relief and Safety Valve Test Program SEB 3.7.1 Damping Values. for Cahle Tray-Design.

HGEB 2.4.2.1 PHF Overflow, on East Mash. Dike (under staff review)

HTEB

.5.2.4 5.2.4 5.3.2 5.3.3 6.6 6.6 Exceptions to PSI Program for RCPB (Units. 2

& 3)

ISI.'rogram for RCPB.

Pressure-Temperature Curves Pressurized Thermal Shock (Vni:ts 2

& 3)

Excepti:on to PSI Program for Class 2

& 3 (Units 2

& 3)

ISI Program for Class.

2

& 3 EgB 3.9.3.2 3.10 3.11 3.11 Pump

& Valve Operahili.ty (under staff review)

Seismic 'gualification Site Audit (scheduled for Jan.

1983 )-

Environmental guali.fication Review Environmental.gualificati on Site Audjt

('to be scheduled)

CNEB

~

9.5 Fire Protection Site Audit (to he scheduled)

JAB 17.5(SSER83)

Calibration Standards.

L'1 qT

~ M

~

DIVISION OF HVMAN FACTORS SAFETY Revi ew Area SER Section Item Identi.fication PTRB 15.3.9.

I.c. 1 ATWS, Procedures.

Procedures for Transients and Accidents (guidelines)

HFEB Control Room Design Review OTHER SCOPE EPLB 13.3 Emergency Planning (under staff revi:ew)

f