SEP 1V 1S82 I
0/pckek Noe.
50-528/50-529 and 50-530-Ilr. E.
E. Van Brunt, Jr.
Vice President Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036
Dear Mr. Van Brunt:
Subject:
Accuracy of Calibration Standards - Palo Verde Nuclear Generating Station As a result of the staff's further review of Section 17.2.12 of the Palo Verde FSAR, we have determined that the commitment regarding the accuracy of calibration standards, as stated on page 17.2-56 of Amendment No. 9, is not acceptable.
To be acceptable, justification should be provided or the 2nd and 3rd paragraphs on page 17.2-56 should be revised as follows:
"Calibrations of permanent plant equipment, M&TE and Calibration Standards shall be performed with the item used to calibrate having inaccuracy better than the item being calibrated."
"In addition, there shall be four,> to one ratio of inaccuracies between either:
(1)
An item of M&TE used to calibrate permanent plant equipment and the calibration standard used to calibrate that item of M&TE (e.g., if M&TE inaccuracy is + 15, the calibration standard inaccuracy must be + 0.25$ or less).
OR (2)
An item of permanent plant equipment and the M&TE used to calibrate that item of permanent plant equipment (e.g., if permanent plant equipment inaccuracy is + 1Ã,
M&YE inaccuracy must be + 0.25%or, less)."
OFFICE P
~ ~ 4 ~ or or or pro
~ ~ ~ ~ 4 ~ 3 ~ ~ ~ ~
~ ~ ~ ror or ~ ~ ~ or or pro ~ oo ~ ~ ~
CI 8210i80308 8209i7
~
oATE
~ PDR ADOCK 05000528 A
~NRR FQRM 313 RP.RPF NROM 3343
~ 3 ~ ~ ~ ~ ~ 3 ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
oo
~ ~ ~ ~ ~ ~ ~ 4
~
~ ~
OFFICIAL R EGO R 0 COPY USQ PO: 199 I~OF.950
.sr.
si eon:+
k
~ J..
1 I I, 6
~ -,%.0
.4I,D ~
', N.:
~
'HIS)l
~ '
V
~
~
~
D5% ~ )
"* 5: ~ ~ = ~ 'I
0 Mr. E.
E.
Van Brunt SEP 17 1982 Therefore, we request that you amend the Palo Verde FSAR accordingly.
Within two weeks of receipt of this letter, provide us the date by which you plan to respond to this request.
If you have any questions, regarding this request, contact E. A. Licitra, the Project Manager at 301/492-7200.
Sincerely, cc:
See next page Frank J. Miraglia, Chief Licensing Branch No.
3 Division of Licensing Distribution; Document Control 50-528/529/530 NRC PDR L PDR PRC System LB¹3 Fj'le TNovak FMiraglia MLicitra JLee
OFFICE/
SURNAME/
OATE$
DL:LB¹ MLicitra.ph 9'/-'f-i 'B2""
~ ~ ~ ~ ooogo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
DL:LB¹3
~
~ ~ ~ ~I
~
~ 00 ~ 0 ~ 0 ~
~ ~
~ ~ ~ ~ ~ ~ 0 ~ ~ 0 ~ ~ ~ ~
a
~ ~
0 0 0)BIPI
~
~ ~ ~ ~ ~ ~ 0 ~ 0 ~ 0 ~ ~i~ ~ ~ ~ ~ ~ ~ ~ ~
NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~i960
0 v -.
sl
'I st
(
ffl