REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
I"4 AOCBSSION NBR:8206210452 DOC ~ DATE: 82/06/16 NOTARIZED: YES DOCKET ¹ FACIL:STN-50-528.Palo Verde Nuclear Stationi Unilt ii Arizona Publ i 05000528 STN"50"529 Palo Verde Nuclear Stations Uni~t 2i Ar izona Publi 05000529 STN",50-530 Palo Verde Nuclear Stationi Uni~t 3i Arizona Publi 05000530
'AUTH INANE AUTHOR AFFILIATION VAN BRUNTiE ~ ED Arizona Public Service Co.
RBC IP ~ NAME, RECIPIENT AFFILIATION TEDESCOiR,L, Assistant Director for Licensing
SUBJECT:
Requests clarification of items discussed status rept on control room design review Agreed verification of similarity between 8 control rooms 'necessary.
DISTRIBUTION CODE:
8001S COPIES RECEIVED:LTR EN TITLE: PSAR/FSAR AMDTS and Related Corr espondence NOTES:Standardized plant ~
Standardized plant ~
Standardized, plant ~
in,NRC 820511 per NUREG"07tlo+
plant simulator CL SIZE e,
/
05000528 05000529 05000530 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR '¹3 LA INTE'Rh'AL: ELD/HOS3 IE/OEP EPDS 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2A NRR/DHFS/HFEB40 NRR/DHFS/OLB 3g NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/OS I/PSB 19 NRR/n
/RSB 23 G FIL 04 EXTERhALe ACRS Pl FEMA~REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0
1 0
1 0
1 1
1 0
3 3
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
10 10 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR ¹3 'BC LICITRAi E ~
01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/OE/QAB 21 NRR/OE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DS I/ICS8 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN5 BNL(AMDTS ONLY)
LPOR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
1 1
1 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
'2 2
1 1
1 1
1 1
tTOTAL NUMBER OF COPIES REQUIRED:
L'TTR 57 ENCL
.52
'0
~
~
~ g V
h n
i'I I
a N
N tt el 1
)
e
'l C
f f
r+
M I
t jt I
, f
'1
ir t
~
ARIZONANUCLE POWER PROJECT Post Office Box 21666 Phoenix, Arizona 85036 Mr. R. L. Tedesco Assistant Director of Licensing Division of Licensing Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 June 16, 1982 ANPP<1205 -ECS/GAS
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
82-056-026'.1.10 Ref:
(1)
NRC Letter from Frank J. Miraglia, NRC to E.
E.
Van Brunt, Jr.,
May ll, 1982,
Subject:
Status Report on the Control Room Design Review of Palo Verde.
(2)
ANPP-19666, December 10, 1981
Dear Mr. Tedesco:
Reference (1) has been reviewed for reference (1) document will be used tion of approved corrective actions of reference (1) has indicated that accuracy with the understanding that the by your staff in auditing the implementa-on the agreed upon schedules.
Review the following items be clarified.
The Human Engineering Discrepancies (HED) and their proposed corrective actions on reference (1) are being presented by Arizona Public Service (APS) to your staff for their review and approval as the Detailed Control Room Design Review (DCRDR) required by NUREG-0660, May 1980 and 5UREG-0737, November 1980 and not as a Preliminary Design Assessment (PDA), as stated on reference (1).
The DCRDR performed by APS, using NUREG CR-1580 as a
guideline and reviewed against NUREG-0700, identifies all HEDs at the PVNGS simulator, which is of similar design to each of the plant's control rooms.
HEDs identified by the Human Factors Engineering Branch (HFEB) review team during their audit at PVNGS have also been factored
,into the APS DCRDR.
Except for the committed to actions to finish the current study, APS will not be performing another CRDR post-OL since the current study meets the requirements of NUREG-700.
Reference (1) under its discussion section fails to mention that the NRC audit team verified the design similarity between the plant's simulator and the plant's control rooms as stated in the SER.
Agreed verification of this similarity between the plant's simulator and plant's control rooms is necessary since the APS DCRDR is based on the fact that the plant's simulator is of similar design to the plant's control rooms.
82~h210452'820ggg';J.
',PDR ADOCK'.. 0>000528',
'.. PBR' pol
U. S.
/CLEAR PgGULATORY COMMISS OS 0
KETING & SERVICE BRANC 0
CE OF THE SECRETAR OF HE COMMISSIO Docv ent St stlcs Postmark Date Copies Receive Add'I Copl eproduce Special trlbutlon
Appendix F of reference (1) needs to be clarified as follows, Presently Appendix F states that APS will,,review items B-4.0.1 and B&.0.2 as part of the DCRDR (NUREG-0700) and provide the results of its evaluation to your staff.
As stated in a previous paragraph of this letter, APS has performed its DCRDR, and submitted its results to your staff, therefore items B-4.0.1 and B-4.0.2 need to be listed under Appendix B of reference (1).
Under Appendix B these two items will be reviewed further using guidance provided. in NUREG-0700.
Proposed solutions and implementation schedules for these items will be submitted to your staff for approval 120 days prior to issuance of an operating license.
Clarification needs to be made with respect to the following items in Appendix B of reference (1):
B-4.0.1 B-5.0.2 B-5.0.3 B-5.0.4 B-5.0.5 B-5.0.6 B-5.0.7 B-5.0.8 B-5.0.15 B-6.0.1(a)
B-6.0.1(b)
B-7.0.1 B-7.0.2 B-7.0.4 B-7.0.7 B-7.0.8 B-7.0.9 B-8.0.1 The listed items will not be further reviewed using the guidance provided in NUREG-0700 as presently stated.
The listed items will be reviewed per reference (2) attachment, Item 17, "The following items will be reviewed and the results of this review, proposed solutions and an implementation schedule will be provided to the NRC for their review and approval 120 days prior to licensing."
If you have any questions, please contact Guillermo Sanchez at (602) 271-3566.
Very truly yours, E. E.
Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GAS/br cc:
E. Licitra (NRC)
L. Bernabei, Esq.
A. C. Gehr
(i
~
I V
~ +
~
~ I a
~
~
~ "~
STATE OF ARIZONA
)
)
ss.
COUNTY OF MARICOPA)
I, A. Carter Rogers, represent that I am Nuclear Engineering Manager of Arizona Public Service Company, that the foregoing document has been signed by me for Edwin E. Van Brunt, Jr., Vice President Nuclear Projects, on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and behalf, the statements made therein are true.
A. Carter R gers Sworn to before me tbfe~~day of 1982
,IJ
'-'-'.) ) Ming>-
, My Commission expires:
e
/
Notary Public