Submits Preliminary Evaluation Supported by Test Results to Demonstrate Capability of Relief & Safety Valves to Operate Under Normal & Accident Conditions,Per NUREG-0737 Item II.D.1.4 &
ML17297B387
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/31/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM ANPP-20597, NUDOCS 8204060030
Download: ML17297B387 (7)


Text

'E, REGUI ATO INFORMATION DISTRIBUTION STEM, ('RIDS)

'OCE'S SION NBR ~ 820406003 0 DOC ~ DATEj 82/03/3 1 NOTARI'ZEP, YES FACIL:STN-50-528 'Palo Verde Nuclear Stations Uni:t 1E Arizona Publi STN-50-529 Palo Verde Nuclear Stations Uni<<t 2E Ar izona Publi STN-50-530 Palo Verde Nuclear Stations Uni;t 3E Arizona Publi AUTH ~ NAME, AUTHOR AFFILIATION VAN BRUNTEE.E.

Arizona Public Service Co.

RECIP ~ NAME RECIPIENT AFFILIATION, TEDESCOFR ~ LE Assistant Director.for Licensing

SUBJECT:

Submits <<pre'liminary evaluation =supported by.test results to demonstrate capability of relief 8 safety valves to operate under normal L accident conditionsEper NUREG-0737 Item II~ 0.1.4 L 810929 l tr ~

DISTRIBUTION CODE:

BOO<< S COPIES RECEIVED:L'TR Q

ENCL Q SIZE:

. Z TITLE; PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant.i cy.'C Grimes Standardized

'Plant.

1 cy'.C Grimes Standardized Plant F 1 cy.'C Grimes DOCKET 05000528.

05000529 05000530 05000528 05000529 05000530 RECIPIENT IO CODE/NAME A/D LIGENS NG LIC BR P3 LA INTERNALS ELD IE/DE'P/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DS I /ETSB 12 NRR/DS I/PSB 19 NRR/DS I/RSB 23 L

04 EXTERNAL: ACRS 41

, FEMA REP DIV NRC PDR 02 NTIS COPIES LTTR ENC 1

1 1

1 3

2

'1 1

1 1

1 1

1 1

1 1

10 1

'1 1

1 RECIPIENT IO CODE/NAME LIC BR P3 BC KERRIGANtJ ~

01 IE 06 IE/DEP/EPLB 36

, NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/DMFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/I<<CSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGNS BNL(AMDTS ONLY)

LPDR 03 NSIC 05

, COPIES LT< r l'( d O a wulKMtVIKIHVVllt!BICOEKKMT STA. P.o. BOX 21666 PHOENIX, ARI2ONA 86036 March 31, 1982 ANPP-20597 JMA/IQ<G Mr. R. L. Tedesco Assistant Director of Licensing Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cormnission Washington, D.C. 20555 ~~q+c'Q p,ppQ6198R~ 8 gggjK~~ g gecN %00 8

Subject:

Palo Verde Nuclear Generating Station

~ (PVNGS) Units 1, 2 and 3

Docket Nos.

STN-50-528/529/530 File:

82-013-040'2-056-026; G.l.10

Dear Mr. Tedesco:

In accordance with the initial recommendations of NUREG-0578, Section 2.1.2, as later clarified by NUREG-0737, Item II.D.1 and the letter dated September 29,

1981, each Pressurized Water Reactor (PWR) utility, on or before April 1, 1982, was to submit a preliminary evaluation supported by test results which demon-strates the capability of relief and safety valves to operate under expected operating and accident conditions.

This letter is the Arizona Public Service (APS) response to the April 1, 1982 U.S. Nuclear Regulatory Commission submittal request and is applicable to PVNGS Units 1, 2 and 3.

APS is a participant in the generic PWR Safety and Relief Valve Test Program implemented by the Electric Power Research Institut'e at the request of partici-pating PWR utilities in response to the NRC recommendations for safety and relief valve testing.

The primary objective of the test program was to provide full scale test data confirming the functionability of, primary system power-operated relief valves and safety, valves for expected operating and accident conditions.

The second objective of the program was to obtain sufficient piping thermal hydraulic load data to per-mit confirmation of models which may be utilized for plant, unique analysis of safety and relief valve discharge piping systems.

Relief valve tests were com-pleted in December, 1981.

The reports prepared by EPRI documenting the Test Program results are as follows:

82040b0030 820331 PDR ADOCK 05000M8

~ A

", ',-PDR', ".-"~"q

~~

~ll

'I 1

1 IJ ~

~ e A'

~

'e l&

t I

(

E'

Mr. R. L. Tedesco March. 31, 1982 ANPP-20597 JMA/KWG Page 2

'alve Selection/Justification Re ort This report documents that the selected test valves represent all participating PWR plant safety and relief valves.

'est Condition Justification Report and the Combustion En ineerin Plant Condition Justification" Re ort These reports will document, the basis and justification of the valve test conditions for all participating PWR plants.

Safet and Relief Valve Test Re ort This report provides evidence demon-strating the functionability of the selected test valves under the selected test conditions for all participating PWR plants.

lication of Rela 5/Mod 1 for Calculation of Safet and Relief Valve Dischar e Pi in H drod namic Loads This report presents an analytical model benchmarked against test data that may be used for plant unique analysis of safety and relief valve discharge piping systems.

All of the documents have been or will be received by APS and transmitted to you by Mr. David Hoffman of Consumers Power

Company, on behalf of the participating PWR utilities as part of our response meeting the April 1, 1982 preliminary sub-mittal requirement.

In addition to providing the referenced reports, APS has performed a preliminary review of the test program results.

Based on the review, we have concluded that valves tested represent the safety valve design and that the conditions tested envelope the range of expected operating and accident conditions for PVNGS.

Also, the above mentioned reports do provide the evidence required by NUREG-0737, Item II.D.1.A which will be used to perform the final plant specific evaluations.

The September 29, 1981 NRC letter requested that plant specific final evaluations be submitted by July 1, 1982.

In order to meet that date, evaluations have been initiated.

Depending on the outcome of the evaluations, it may be necessary to continue the evaluation beyond July 1, 1982. If a longer evaluation period is

required, you will be notified on or before July 1, 1982.

Very truly yours, E.

E. Van Brun Jr.

APS Vice Presi ent, Nuclear Projects ANPP Project Director EEVBJr/KWG/av cc:

E. Licitra P. L. Hourihan R. L. Greenfield A. C. Gehr G. C. Andognini J. Vorees

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA)

\\

I, John M. Allen, represent that I am Nuclear Engineering Manager of Arizona Public Service Company, that the foregoing document has been signed by me for Edwin E. Van Brunt, Jr., Vice President Nuclear Projects, on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

o n

. Allen dwora to before me thfa~O day of 41

, 1982 Notary Public Hy Commission expires:

e -'w N

U Q

g),

~

P 0 f

'Ill~'lf 4

~1%,

iuCll