ML17297B367

From kanterella
Jump to navigation Jump to search
Forwards Three Oversize Drawings & Three Oversize Design Change Notices Showing Mods Being Implemented to Make Containment Spray Pump Manual Override Consistent W/Other ESF Manual Overrides.Aperture Cards Are Available in PDR
ML17297B367
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/19/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Tedesco R
Office of Nuclear Reactor Regulation
Shared Package
ML17297B368 List:
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-20483-JMA, NUDOCS 8203250112
Download: ML17297B367 (6)


Text

- WEGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8203250112 DOC ~ DATE: 82/03/19 NOTARIZED:, YES DOCKET FACIL:STN-50-528 'Palo Verde Nuclear Stationi Unit 1E Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Stations Uni;t 2P Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Stationi Unit 3P Ar izona Publi 05000530 AUTH. NAME,'UTHOR AFFILIATION VAN BRUNT<E,E, Arizona Publ'ic Service Co ~

RECIP ~ NAME RECIPIENT AFFILIATION TEDESCOPR ~ LE Assistant Director for Licensing

SUBJECT:

Forwards three oversize drawing ft -three oversize design change notices showing mods being implemented to make containment spray pump manual override consistent w/other ESF manual overrides. Aperture cards are available in PORE DISTRIBUTION CODE: BOOIS COPIES RECEIVED:LTR L ENCL ~ SIZE:

TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant.i cy:C Grimes 0500052/

Standardized Plant. 1 cy;C Grimes OS000529 Standardized Plant ~ 1 cy'.C Grimes 05000530

'SOS~ +To RTi~g~

REC IP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR 03 BC 1 0 LIC BR P3 LA 1 0 KERRIGANP J ~ 01 1 1 INTERNAL: ELD 1 0 IE 06 1 1 IE/DEP/EPDB 3S 1 1 IE/DEP/EPLB 36 3 3 MPA 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 2Q 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 30 1 1 NRR/DHFS/PTRB?0 1 1 NRR/DSI/AEB 26 1 1 NRR/DSI/ASH 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETS8 12 1 1 NRR/DS I/ICS8 16 1 1 NRR/DSI/PS 8 19 1 1 NRR/DS I/RAB 22 1 1 SB 23 1 1 NRR/DST/LGB 33 1. 1 eEG 00 1 1 RGN5 '2 2 EXTERNALS ACRS 01 10 10 BNL(AMDTS ONLY) 1 1 FEMA-REP DIV 39 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 p ~uJ4l ~~+a D C'(M~K~~

~ %K~

TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL

h h

W

~ n II' I II 1 tf I II I I Q

'I I

~ h i ~

II

~

j ~

1

~, ','h

~a

) ~

II t* I~ ,

g* h f wg EE 1 1t ~

P

OM EPEKHM<Q g!XVM!ClltS OMHDIDRtlt STA. P.o. BOX 21666 - PHOENIX, ARI2ONA 85036 March 19, 1982 ANPP-20483 JMA/TFQ Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing p eQQ<s~f ggy~

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission hfggp e p'~ 4 188'~

g, Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 File: 82-056-026; G.1.10

Reference:

NUREG-0857, "Safety Evaluation Report" related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3, dated November, 1981

Dear Mr. Tedesco:

Section 7.3.2.2 of the referenced SER states that the applicant has committed to modify the containment spray pump manual override to be consistent with other ESF manual overrides.

Attached are the following design change documents showing the modifications which are being implemented to make the containment spray pump manual override consistent with the other ESF manual overrides:

13-E-SIB-036, R3 13-E-SIB-036, DCN 5 13-E-SIB-037, R3 13-E-SIB-037, DCN 7 13-E-SIB-038, R4 13-E-SIB-038, DCN 9 We feel this closes the confirmatory item as stated in Section 7.3.2.2. Please contact me if you have additional questions on this matter.

Very truly your E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFg/av ~

Attachment cc: E. Licitra R. L. Greenfdeld (w/a)

':-.",~'.

J. Rosenthal C. Gehr ~

P. L. Hourihan 8>>>>50f12 BaQS>9

} PDR ADOCK 05000528 PDR',,>> .

W 'E C

I H E

't N

1 i

I I

lf I'

r~'

STATE OF ARIZONA )

) ss.

COUN%"I OF MARICOPA)

I; Edwin E. Van Brunt, Jr., represent'that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

.'g '7p Edwin E., Van Brunt, aug Jr.

'0 ~

g/l I Sworn= to before me thi0'j 8 day of 1981.

<<Vg%lg~~

Notary Public My Commission expires:

s3'am Pg

sU1 F

UI 1 s ~

v petyA