ML17297B007
| ML17297B007 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/22/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| ANPP-19239-JMA, NUDOCS 8111090437 | |
| Download: ML17297B007 (8) | |
Text
REGULAfl'ORY INFORÃATIDwV'ISTRIBUT'ION SYSTE'H (RIDS)
ACCESSIDV< VBR:8fff FACILE:STN"50 528 Sl'N 50 529 STN"50-530 AUTRE, NAiYEl VAN BRUVWTE "l, El, RECIP ~ VAHKI TEDESCOFR
~ L 090437 DOC, DATEi: 81/.10/22 iVOTARIZED:'YES Palo Ve'rde Nuclehri StationF Unit fi Arizona Publi Palo Vel.de Nuclear: StationE Unit 2F Arizona Publi Palo Verde Nucleari Stations Unit 3E Arizona publi AUTHOR AFF ILLATwION Arizona Public" Service Co ~
RECKPZENT AFFILCATIOIV Assistant Directori fori Licensing OO~
05090529 05090530
SUBJECT:
- " Forwards results of 811020.
E 2'1 meetings w/Hydrologic 8,
Gebtechnicali Ehgineering, BranchFERTECFBechtel L
APS ati site~
in PhoenixEAZ re 'settlement vonitoringilateral pressures-3, liquifactioni analysis,Addi info due 811121,Affidavitw ehcl.
DISTRiIBJTION CODEI:
BODIS COPIES RECEKVED:LtTR L
ENCLW SIZESI 3 TIITL:I>'SARF/FSAR A4lDTS and Re,lated Corre'spondence VOTES:Standardized Plant; 1
cy'.CI Grimes Standardized Plant.
1 cy'.Ci Grimes Standardized Plant; 1 cy:CI Grime's 05090528 05090529 05090530 RECIPIENTS IQ< CODE/NAMEl ACTlION::
A/Di LiICEVSNG LWIC( BR P3 LA COPIES'TTR ENCLI 1
0 1
0 RECIPIENT ID CODE'/NAME" LKC BR 0$
BC KERRIGANF J ~
01 COPIEB LlTTR~ ENCL<
1 0.
1 INTERNALc ELO~
IE/DEP/EPDB 35i HP Ai wVRRw/DE/EQB 13i VRR/DE/HGEB 30.
NRRi/DE/MTEB 17 NRRW/DE/SAB 24 I/DHFS/HFEBAO VRRw/DHFS/PLB 34 NRR/DSII/AEB 2&'RR'/DS Ii/CPB 10.
wVRRI/DS Ii/EiTSB 1 2!
wVRR/DSII/PSB 19 Rv i
23 G FILE'4 1
0 1
1 1
0 3
3 2',
2 1
1 1
1 1
1 1
~
1 1
1 1
~
1 1
1 1
1 1
1 1
1 ICE 06'Ei/DEP/EPLB36 iVRR/DE'/CEB 11 VRR/DE'/G8 28 NRR/DE/4IEB 18 NRR/DE/QAB 2'1 NRR/DE/SEB 25" VRR/DHFS/LQB 32'RR/DHFS/PTRB20 VRR'/DSI/ASB 27 VRR/DSI/CSB 09 VRR/DSI/ICSB 16" VRR/DS I/RAB 22" VRR/DST'/LGB 33 3w
'.3w 1
2'.
1 1
f ~
1 ~
1 1
fW EX TERNALC ACR6 41.
F ElwlA REP DI V 39 iVRCl PDRi 02',
NT'I6 ie 16 1
1 1
1 1
BNLI(AHDTS ONLWY)
LPDRw 03 VSIC 05 1
1 ~
1 1
1 1
TOll'AL RURBERi OF COPIES REQUIRED:
Lll'TR WWSl ENCLw P
'~o II
I"(ttt((ll((I(((IAAF(((tie OXEH((((t(t(
BTA.
P.o. BOX 21666 PHOENIX, ARIZONA86036 Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.C.
20555 October 22, 19 ANPP-1923
-v8Jg/P, a<5.~~tI-N(g (j 6 ['golf tIIICLC(((( > ~g If (
~ 'OIIIIIIISS
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket NOS STN-50-528/529/530 File:
"81-056-026'."1.'10
Dear Mr. Tedesco:
Attached please find a copy of the results of our working meeting with the NRC (HGEB) held on October 20 and 21, 1981.
As noted, documentation of these confirmatory items will be provided by November 21, 1981.
Very truly 6'ur
~.F
~~.,~
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/WFg/sam Attachment cc:
J. Kerrigan (w/a)
P. Hourihan (w/a)
A. Gehr (w/a)
J.
Chen (NRC) (w/a) pool Giii090437 Si1022 PDR
- DOCK OSOOOS28 A
4 I
i4
~l
STATE OF ARIZONA
)
) ss.
COUNTY.OF MARXCOPA)
I, Edwin E. Van Brunt, Jr., represent'hat I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
~
~
~
~
~
tfn~g ) ~ C('g Edwin E.. Van Brunt,,Tr...
c8 l
'"-,'r'., 198le i ',
.'),'
Sworn to before me tbfs~4ey of CP otary Public My Commission expires:
. Qo~"
I>>,'-,.
P.=
C a
Date of Meeting:
October 20, 21, 1981 Location:
PVNGS Site:
October 20, 1981 Phoenix, Arizona:
October 21, 1981 Attendees:
ERTEC B. Konstantinidis D: Anderson S. Haire Bechtel APS NRC/NRR/HGEB R. Peters B. Quinn J.
Chen
Subject:
Purpose:
HGEB SER Site Reveiw and Working Meeting to Resolve Questions and Provide Clarifications I.
Resolutions from 'Working Meetin A.
Settlement Monitorin 1.
Spray Pond add four more monitoring points per unit.
2.
Define end of construction as the last pour of concrete in unit.
3.
Monitor settlements every six months for 3 years, after end of construction or after filling the pond.
4.
Monitor every 5 years after the first three year period.
Terminate the monitoring program if settlements are stabilized.
(Main NRC concern is realted to the Control, Radwaste,
- Fuel, and Diesel Generator Buildings).
5.
APS will provide a revised settlement monitoring report to reflect the above changes.
B.
Lateral Pressures l.
APS will provide the design criteria for lateral earth pressures and incorporate into the FSAR, Section 3.8.
(Currently there is no mention of surcharge effects).
2.
Provide an updated stability analysis with reasonable con-servation interpretation of shear strength along the backfill to native soil interface.
3.
Add statements in the FSAR text regarding slope preparation before backfilling.
C.
Li uefaction Anal sis 1.
Provide results of an additional SHAKE analysis to verify that a surface motion derived from a deconvolved deep motion would be the same as the original surface motion.
II.
Schedule Information on these items will be provided by November'1, 1981.
1