ML17297A899
| ML17297A899 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/01/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kerrigan J Office of Nuclear Reactor Regulation |
| References | |
| ANPP-19054-JMA, NUDOCS 8110090113 | |
| Download: ML17297A899 (8) | |
Text
R ACCESSION'BR:811 FAG ILi:STN"50-528 STN 50 529 STN"50 530 AUTH>, N AiRE!
VAN BRUV<Tg E>,E REC I P ~ NA>>HEI KERRIGAN<g Je 0,090113>>
DOC DATEI: 81/10/01 NOTARIZED:: YES Palo Verde Nuclear>> Station~
Unit 1g Ar izona Publi Palo Verde Nuclear Stations Unit 2g Arizona Publi Palo Verde Nuclear Station<
Unit 3r. Arizona Publ.i AUTHOR AFFILIAT'XON Arizona Public Service. Co.
REC'IPZ ENT AF F IL<IA<TION Licensing Branch 3
DOCKEIl 0
529 05090530 SUBJECiT:: Forwards total post-LOCA-timp/energy rate into spray pond/
pei 810925 te l con ~
DISTR<IBUTION CODEI! B001S COPIES RECEa VED: Lll R ENCLi 'IZE!::
'ITLEI;'SAR'/FSAR AMDTIS and Related Correspondence NOTES:Standardized Plant,1 cy.'C Grimes Standardized
- Plant, 1
cy,'C; Grimes Standardized Plant',
1 cy'.C, Gr imes 05000528 05000529=
05000530 RECIPIENT>>
IO>> CODE/hlAMEI ACTa ON:<<A/Di LiICENSNG LaCl BR 03 L'A INTERNAL<'ACCID EiVAL BR26'HEM EiVG BR 11 CORE PERF BR 10.
Et Oi GEOSCIENCES 28 HYD</GEOI BR 30.
I LEI 06'E/EPLBi36 Lac, QUAL BR 32.
MECH E<NG BR>>
18, OP L'IC BR 34 PROC/TST REV 20.
RAD>> ASSESS BR22' 01
>>NG B R25>>
COPIES LTTR ENCLt 1
0 1
0 1
1 1
1 1
1 1
0 2
2 2
2 3
3 3<
3 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME, LaC BR 43 BC KERRIGANgJ, 04 AUX SYS" BR 27 CONT'YS BR 09 EFF TR SYS BR12 EQUIP QUAL BR 13 HUM FACT ENG 40 ILC SYS BR 16 IE'/EPDB 35 LaC GUID BR 33 MATLi ENG BR 17 4IP A POWER SYS BR 19 QA BR 21 REAC SYS BR 25 SIT ANAL>> BR 24 COPIES LIl'TR>> ENCL>>
1 0.
1 1
1 1
1 1
1 1
3 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1=
1 1
1 1
E'XTERNALi: ACRG LPOR NSIC 41 03<
05(
16 16 1
1 1
<VT'I S 1
1 1
1 ~
1 1
/'<,Clqq gg TOTAL
<NU>><IBER>> OF COPIES REQUIRED:
LiTTR ~
ENCL
II
'1 1
N I
0 4
STA.
O IPlllXHCI IKSIHPltt5Bfl CKOED%HW P.o. BOX 21666 PHOENIX, ARIZONA85036 October 1,
1981 ANPP-19054-ae/WFq Ms. Janis Kerrigan Licensing Branch 3
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 i~i/,~
Ig
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
81-056-026 G.1.10
Dear Janis:
Attached please find a list describing the total post-LOCA energy rates into the PVNGS spray pond as discussed with the HGEB representa-tive by telephone conversation on September 25, 1981.
Please contact me if you have any questions.
Very truly yours CUB CV~
E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/WFQ:ma Attachment/
cc:
R. B. Codell (NRC/HGEB) (w/a)
P. Hourihan (w/a)
A. Gehr (w/a)
'$0O ~
5 i/j 81100901K 05000528il
It u
lt II g'I ll I
'J
STATE OF ARIZONA
)
) st COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent that I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Sworn to before me thfs~&
day of My Commission expires:
9iU Edwin E. Van Brunt->>Jrre 4/g I t oi
~~~'., 1981.
s t
r Notary Public
f e+
r<
/>> <j li q pre
Ener POST-LOCA Rate into S ra Pond Time
~s 2,060 2,070 2,100 2,890, 4,000 5,500 9,000 22,000 30,000 38,000 489000 70.;000 85,000 95,000 110,100 140,000 180,100 200,100 220,100 300,100 340,100 440,100 550,090 710,090 850,080 1,150,100 1,800,100 2,200,"100 2,550,000 2,600,100 Energy Rate Btu/hr 1.91 x 10 7 1.91 x 10 7 1.42 x 10 1.52 x 10 8 1.62 x 10 8 1.73 x 10 8 1.84 x 10 8 1.94 x 108 1.83 x 108 1.73 x 10 8 1.63 x 10
.8 1.53 x 108 1.42 x 10 8 1.34 x 108 1.25 x 10 8 1.15 x 108 1.04 x 108 9.4'. x 10 7 9.13 x 10 7 8.91 x 10 7 8.37 x 10 7 8.04 x 10 7 7.46 x 10 6.85 x 10 7 6.53 x 10 6.08 x 10 5.59 x 10 7 5.30 x 10 5.06 x 10 4.94 x 10 7 5.11 x 10 7 Basis Water flow rate to spray pond:
16900 gpm (8.418 x 10 lb/hr) 1 Train Running 1 Spray Pond Operating (p
/
'4
(%
I i>
FI l
'l I