ML17297A834
| ML17297A834 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/20/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17297A835 | List: |
| References | |
| NUDOCS 8109180339 | |
| Download: ML17297A834 (4) | |
See also: IR 05000528/1981009
Text
gT
AUG 2 0 1981
Docket Nos. 50-528/529/530
Arizona Public Service
Company
PE 0.
Box 21666
Phoenix, Arizona 85036
Attention:
Mr. E. E.
Van Brunt, Jr., Vice President
Nuclear Prospects
Management
Gentlemen:
- ~
- " 4'g/(@
'gp~
p'.,
~CRlg( Qgggg
'V
~
~
~ ~ ~ ~
~ ~ 0 ~ ~ ~ ~ ~ ~ 0
t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~
~
J.
IN/
+++8/
~C8"1o ~ ~ ~ ~ ~ ~
IVV
RV
B. FA
fNEER
~ ~ ~ ~
RDT/j
8%+[ 81
o ~ ~
T ~ BI
P .ic
~ ~ ~ ~
~ ~ ~
~ ~ ~
~
/'c
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
SURNAME)
DATE)
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~4.8
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ (
OFFICIAL'ECORD COPY
NRC FORM 318 00/80) NRCM 0240
Subject:
NRC Inspection of Palo Verde Units 1, 2, and
3
This refers to the inspection
conducted
by Messrs. J.
H. Eckhardt and J.
F.
Burdoin of this office on July 6-10,
1981 of activities authorized
by NRC
Construction Permit Nos.
CPPR-141,
-142, and -143,
and to the discussion of
our findings held with 'you and members of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the enclosed
inspection
report.'ithin thes'e areas,
the inspection consisted of selective examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within the
scope of this inspection.
In accordance
with. 10 CFR 2.790 of the Coomission's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the NRC's
Public Document
Room. If this report contains
any information that
you'elieve
to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by 'tplephone within ten (10) days from the
date of this letter of you< intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.. If your receipt of this letter
has
been delayed
such that less
than seven
(7) days are available for your
review, please notify this office,promptly so that
a new due date
may be
established.
Consistent with section 2.790(b)(1),
any such application
must be accompanied'y
an affidavjt executed
by the owner of the information
which identifies the document or part sog~ht, to be withheld, and which
contains
a full statement of the basis
on iihich it is claimed that the
information should
be -withheld'from public. disclosure.
This section further
requires the statement
to address
w(th spec(ffclty the considerations
listed
)n
10
OFR ? 790(b)(4).
The lnformatlon soiight to be withheld shall
be
gg
8109180339
810820
I
ADOCK 05000528
c 8
R
~n')'(j(
(g $N$
~ K<<4
<<
<<<<
'
~
I
'<<
- <<
<<
4
<<
~
~,
1
~
<<
<<
<<
I
K
4
'<<
<<'
<<
~
~ K
<<
I<<<<
4<<<<
-<<
<<
<<
~,4
~
<<<<<<44
~ ~
a
4
~
<<
A
Arizona Public Service
Company
AUG 20 195)
incorporated
as far as possible into a separate
part of the affidavit. If
we do not hear from you in this regard within the specified periods
noted
above, the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
we wi11 be glad
to discuss
them with you.
Sincerely,
MINHA1 5lCHEO BY
L T..OQOPS
B. H. Faulkenberry,
Chief
Reactor Construction Projects
Branch
Enclosure:
IE Inspection
Report
No. 50-528/81-09
50-529/81-09
50-530/81-09
Sent to
DMB for DCS processing.
Distributed by RV:
RV PDR
Resident
Inspectors
(3 copies)
RHE (w/o enclosure)
Gehr (w/o enclosure)
t
t ~
tl
f )gf
t,
.
~
lI,t
1
lt
1
1
4