ML17297A801

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Administrative Controls Governing Crane Operation,Procedure Review & Approval & Temporary Changes to Procedures
ML17297A801
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/19/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Vanbrunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8109110107
Download: ML17297A801 (6)


Text

AUSUST 1 9 IIN Docket Nos.:

STN 50-528/529/530 Mr. E.

E. Van Br,0'nt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036

'./g XQ/

c

Dear Mr. Van Brunt:

SUBJECT:

Request for Additional Information - Palo Verde Nuclear Generating Station In order to complete our review of Palo Verde, we find that we will need your response to the questions found in the enclosure.

These outstanding issues have been previously discussed with Mr. guinn of your staff.

Please provide your response to these questions by August 31, 1981.

If you have any questions on this matter, please contact us.

Sincerely.

~~y~l @ifnjd..-.

jbW Enclosure As stated cc:

See next page.

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing OFFiCEQ SURNAME/

OATEf>

DL,I-',

RL desco B 3 DL' DL:LBP3 D

i SHanau I ~

~ ~

0 ~

lia J

8 n:J

~ ~

~ ~

~

4/81 tf ~ ~ ~

~

sygfls!.......

8/

/81 DISTRIBUTION:

Docket Fi1 e 50-528/529/530 TMurley LPDR OELD PDR MPA NSIC FJMirag 1 ia TERA JKerrigan LB83 Fj"les JLee RLTedesco IE (3)

DGEi senhut 'i09i iOi07 8i08i 9 Ryol lmer PDR ADOCK 05000528.

A PDR NRC FORM 3l8 RO/80) NRCM 0240 OFFICIAL RECORD COPY o USGFO: 1980 9294f24 f

7 F

~ <<7.< gr I "j Il"'=hi.

  • r 07h<<lhh7 ~ I, I

I I 7

~

- ~(

4 F 4

"3i h

'i ~ 4 =

d 4

I ~

Fl 7

4 PF(h 7

'4 hr

~ 4 ) '47<< ~

=4<<4 7gd<<

lh I

., ~ <<(,4 II 74 4i',4, ~

I P( IPgg 74 5, I 7<<J PI<<, IF r<<

\\

II

~ J F( ~ ~ ~ ~

~

Pr

<<I ~

\\'4 I I

474 ~ <<'5 I IP F4

~

4

~ II

  • ~ 7

~ 4 7 ~

Pd "I ~r P

I P,

'4 7'tt 7 g I, 4

<<F

~

n

~

-q 4

~ ~

I

~ ~

h I ~

~

I'

~

rid'4 7 7

I ~

PI 7 ~

I- ~

4 4

Mr. E. E.

Van Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company P. 0. Box 21666

Phoenix, Arizona 85036 PALO VERDE CC'rthur C. Gehr, Esq.

Snell h Wilmer 3100 Valley Center

Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq., Assistant, Counsel James A. Beoletto, Esq.

Southern California Edison Company P. 0. Box 800

Rosemead, California 91770 Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.

Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street

Phoenix, Arizona 85040

t.

EkxP f

Chapter 13 Review - Palo Verde Nuclear Generating Station 26.

27.

28.

29.

30.

31.

Please indicate your commitment that administrative controls governing crane operation will be established prior to fuel loading and will include a requirement that crane operators who operate cranes over fuel pools be qualified and conduct themselves in accordance with the guidel ines of ANSI'30.2-1976 (Chapter 2-3).

The comnitment, stated. fn your letter of June 25, 1981, to report exceptions to ANSI BZ).2-1976 "prior to fuel load" does not provide a basis for closing this issue prior to authorizing fuel loading.

Accordingly, please identify at this time any exceptions you pt opose to exercise.

In addition, please prnvirie a justification for each exception which shows how the crane operators'ualifications and required conduct are not diminished by the exception.

Please confirm that you will have administrative procedures covering the following subjects:

a.

Procedure Review and Approval b.

Crane Operation c.

Temporary Changes to Procedures Please describe the minimum size of the Fire Brigade to be maintained onsite at all times.

In addition, please verify that the responsibi 1-iLies of the fire brigade members under normal conditions will not conflict with Lheir responsibilities during a fire emergency according to the guidelines stated in Branch Technical Position ASB 9.5-1, "Cuide-lines for Fire Protection for Nuclear Power Plants," Revision 1, Appendix A.

Lo this Br@nun TeChn1Cd1 POS1t1On and SeCT.1On III.H OT Appendix R: to 10 CFR 50.

Please state the number of license candidates for Control Room Operator and Senior Control Room Operator that. are presently in training for each unit of PVNGS.

Please identify the operating PMR(s) at which licensed operator candidates have received training and the typical duration of the training.

Please note that the reference in guestion 15 should be Section III.I of Appendix R.

o @PE 4

"t I'F,4 II C'