ML17297A752
| ML17297A752 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/31/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17297A753 | List: |
| References | |
| ANPP-18800-JMA, NUDOCS 8109020095 | |
| Download: ML17297A752 (6) | |
Text
REGUL RY INFORMATION DISTRIBUTI SYSTEM (RIDS)
ACCESSIONI NBR: 8109020095 DOC ~ DATE'! 81/08/31 NOTARIZED;'ES DOCK FACIL<!STN 50 528 Pal o Verde Nucl ear Station<
Unf t 1 i Ar f zona Publ f 05 STN 50 529 Palo Ve'r de Nuclear" Stations Unit 2i Ar izona Publ f 05000529 STN 50>>530 Palo Verde Nuc'lear~ Stations Unit 3i Arizona Publf 05000530 AUTH,NAME'UTHOR AFFILIATION VAN BRUNT>EI.E>,
Ar f zona Publ fc Service Co.
RECIP ~ NAMEl REC'IPZENT AFFILIATION TEDESCOiRoLio Assistant Df r ector
~ for~ L'fcensing SUBJECT!'or wards "Electrical T'rain~
8 Channel Separ ation Study Safel Shutdown AnalysisiSummjary Rept'
" Rept summarizes safe>
shutdown~ separatfon study methodology discussed
- during, 810730 meeting, re facility ffre. pt ote'etion open items;.
DISTRIBUTION CODEie 8002S COPIES RECEiI VED: L~TR ENCLI' SIZE'e:
TZTLEt: Fire" Pt otect f on (Pri or to Issuance'f OL~).
NOTES! Stander di zed P l ante 1-cy: Cl Gr ime's Standardized Plant;1 cy!C.'rimes Standardized Plant'+f cy.'C Gr imes 05000528 05000529 05000530 REC IPl ENT'D CODE/NAME)
ACT~ION LtICii BR 43~ BC 04 COPIES RECIPIENT LTTR ENCL; ID CODE/NAME 1
1 KERRIGANiJ ~
05 COPIES L'fTR ENCL" 1
1 INTERNALi: A/D MATL/QUAL(
CHEM ENG= BR 09 OELD 0
AUX SYS BR 4
4 I8 0
EG FILE~
07 Oi 1
f>>
3 1
1.
EXTERNALS ACRS NRC PDRl NT'IS 10.
16 16 LPDR OR'.
1 1
NSI C~
1 1
03 0 6q f
f ~
fv gy 8 iS TOTAL" NUMBER~ OF COPIES REQUIRED ~" LiTTR ENCL'
~ 1 l
a t
I n
Il l
jl 4 f
'1 I
r I1 W1
/
0
\\
Ii I ARlZONANUCLEAR POWER PROJECT Post Office Box 2166 oenix, Arizona 85036 August 31, 1981 ANPP-18800 JMA/TFQ Mr. R. L. Tedesco Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos.
STN-50-528/529/530 File:
81-056-026/G. 1. 10 SEP 011981~
Qoh~<~>
gpwalq5I08
Reference:
NRC Meeting Summary dated August 2, 1981 of PVNGS Fire Protection Meeting held July 30, 1981
Dear Mr. Tedesco:
On July 30, 1980 a meeting was held to discuss PVNGS Fire Protection open items.
During that meeting, we briefly described the methodology used to conduct a safe shutdown separation study, in accordance with
- 10CFR50, Appendix R, item G.
Attached is a description of this methodology for your use.
Please call if you have any questions.
Very truly yours E. E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/TFQ/sb Attachment cc:
J. Kerrigan P. Hourihan A. C. Gehr (w/
attach.)
(w/
attach.)
(w/,, attach.)
8109020095050005p+g
)PDR *DOCK 0
@DRJ F
I t
f~
4 4
~,
r n
r
~
~
~I p "y l
~
PA%g$
pl I
STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent'hat I am Vice President Nuclear Projects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statement's made therein are true.
Edwin E..Van Brunt, Jr.i
'V'worn to before me thfa~S day of 1981.
otary Public My Commission expires:
/
c'
" 's r/
4
'I l