ML17297A710
| ML17297A710 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/11/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ANPP-18643-JMA, NUDOCS 8108270257 | |
| Download: ML17297A710 (6) | |
Text
cCZ REGULA+
RY INFORMATION DISTRIBUTIO"'YSTEM (RIDS)
ACCESSION NBR:8108270257 DOC ~ DATE: 81/08/11 NOTARIZED:
NO FACILI:STN-50-528 Palo Verde Nuclear Stationi Unit 1P Arizona Publi STN-50-529 Palo Verde Nuclear Stationi Unit 2E Arizona Publi STN"50-530 Palo Verde Nuclear Station<
Unit 3P Arizona Publi AUTH ~ NAilE" AUTHOR AF F IL'IATION VAN BRUNT<E',E, Arizona Public Service Co.
RECIP ~ NAME>>
RECIPIENT AFFILIATION DENTONP H ~ RR Office of Nuclear Reactor Regul ati one Dir ectorI DOCK 0
05000529 05000530
SUBJECT:
- Responds to 810800 tel con request for addi info re. util participation in EPRI safety L relief valve testing program..
Completion of testing L final repts scheduled between Mar>>
8 June 1982 ~
OISTRIBUTION COOEI:
BOOIS COPIES RECEEVEO:LlTR
/" ENCL EP SIZE.'
TITLE): PSAR/FSAR AMDTS and Related Correspondence NOTES:Standardized Plant.
1 cy:C Grimes Standardized Plant
~ 1 cy:C Grimes Standardized Plant.
1 cy:C Grimes 05000526 05000529 05000530 RECIPIENT ID CODE/NAMEI ACTIONs A/D LICENSNG L'IC BR P3 LA INTERNAL AC C ID EIVAL BR26" CHEM ENG BR 11 CORE PERF BR 10.
EMRG PRP DEV 35 EQUIP QUAL BR'1 3I GEOSC IENCES 28 HYD/GEO'R 30 I8 E>>
06" LIC'UAL BR 32",
MECH ENG BR 18 OELD POKIER SYS BR 19 QA BR 2'1 REAC SYS BR 23>>
SIT'NAL BR 2g COPIES LTTR ENCL>>
1 1
1 1
3 2
2 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME LIIC BR 43 BC KERRIGANP J ~
04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EMRG PRP LIC 36'EMA REP DIV 39 HUM FACT ENG 00 IEC SYS BR 16 L'IC GUI D BR 33 MATL" ENG BR 17 MPA OP LIC BR 34 PROC/TST REV 20 RAO ESS BR2?
EG FIL 01 T
ENG BR25 COPIES LTTR'NC 1
1 EXTERNALt:
1 1
3 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL" hr.
IIi=~
o
'I
lX (QCo)EQlM~F P. 0 BOX 2I666 'HOENIX ARIZONA 85036 August 11, 1981 ANPP-18643 - JMA/KWG Mr. H.
R. Denton U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Units 1, 2 and 3
Docket Nos. STN-50-528/529/530
Reference:
Letter from R.
C. Youngdahl to H.
R. Denton dated July 24, 1981
Dear Mr. Denton:
This letter is in response to a request by your staff via telecon on August 4, 1981 for additional information regarding Arizona Public Service (APS) Company's participation in EPRI's Safety and Relief Valve Testing Program.
APS has participated in the EPRI Safety and Relief Valve Test Program since its inception in response to NUREG-0578.
The only exception to this participation is that we have not acquired a share of the Block Valve Test Program now under development within EPRI and the Safety and Relief Valve Test Program.
This is, of course, since PVNGS.'ystem 80 design does not utilize block valves -on the Pressurizer PiPing.
As discussed in the referenced letter, EPRI has provided their best esti-mate for scheduled completion of testing and submission of final reports.
The PVNGS System 80 design uses Dresser Model 31709NA safety valves for its pressurizer relief function.
These valves are being tested at the CE facility in Windsor, Connecticut, and so the scheduled final report should be available between March and June of 1982, from EPRI.
This schedule will not support scheduled SER work by your staff.
- However, APS will make every effort to have a plant specific submittal available earlier, if possible.
Our current best estimate is late February of 1982 at the earliest.
pool 5
f8108270257 810811 PDR ADOCK 05000S28 (A
PDRi
b
Mr. H. R. Denton August ll, 1981 ANPP-18643 - JMA/KWG Page 2
No doubt you and your staff are familiar with the many complications and delays which could still impact this schedule.
We would like to assure you that we are applying a high priority to this work and are expediting its resolution'.
If you have any questions, please contact me or my staff.
Very truly our EEVBJr/KWG/av E.
E. Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director cc:
J. Kerrigan R. Youngdahl P. Hourihan A. C. Gehr
II