Forwards Request for Addl Info Re Geologic & Seismologic Updating of FSAR
ML17297A665
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/03/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8108170140
Download: ML17297A665 (7)


Text

'

AUG 3

1981 Docket Nos.:

50-528/529/530 Mr. E.

E.

Van Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036

Dear Hr. Van Brunt:

SUBJECT:

REQUEST FOR ADDITIONAL INFORtOXION STATION DISTRIBUTION'ocket File 50-528/529/530 LPDR PDR 'CRS NSIC TERA LB83 Files JDKerrigan FJMirag1 i a JLee TMurley DEisenhut RMattson RVollmer SHanauer OELD IE

-APALO VERDE NUCLEAR GENERATING In order to complete our review of Palo Verde, we find that we will need your response to the questions found in the enclosure.

These outstanding issues have been previously discussed with Mr. Quinn of your staff.

iBthin 7 days of receipt of this letter, please provide us with a proposed schedule for responding to the enclosure.

If you have any questions on this matter, please contact us.

Sincerely,

~4~

8JgnCd b~

Rabart Igad~

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing Enclosure; As stated cc:

See next page.

APP~'

8i08i70i40 8i0803 PDR ADOCK 05000528

.A PDR'eg II']g 0

/IUGL21981~

9 MiIIteaae 990pggga CQpgqggg OFFICEI SURNAME/

OATE 0 DL:

agl >a

~

~ ~ 1 ~

X

~t ~ Oft ~ 0 ~ ~ ~\\

7/3 /81

~ ~

~ 1 ~ ~ 0 ~ ~

~ OO ~ 0 ~

~

~

DL;LB 3

~ ~

~

~

~

~ ~

~ I'

~

JD:j

~ ~ ~ 0 ~

~

~ 0 ~ ~ ~ 0 ~

~ 0

(/81

~

~ oee ~ ~ ~

4 ~ ~ ~ ~ ~ ~ ~ ~ o ~t ~

RL esco

~ 0

~

~

~ ~

~ ~I~ ~ 00 ~ ~

)/hi

~ 0 ~ 0 ~ ~ 0 ~ 0

~I ~ ~ ~ ~ ~ 0 ~\\ ~ 0 ~

~I

~

~ ~

~ I 0 ~

~ 0 ~

~ ~ ~ 0 NRG FORM 318 (10.80) NRCM 0240 OFFlCIAL RECORD COPY USGPO: 1991~960 A

t

~,n

'k

'I a

Ef 9)St" a

(

k'

Hr. E. E. Yan Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036 PALO YERDE CC:

Arthur C. Gehr, Esq.

Snell h Milmer 3100 Valley Center Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington

. Phoenix, Arizona 85007 David N. Barry, Esq.,

Senior Counsel Charles R. Kocher, Esq., Assistant Counsel Southern California Edison Company P. 0. Box 800

Rosemead, California 91770 Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Mashington Phoenix, Arizona 85007 "

Mr. Rand L. Greenfield Assistant Attorney General'ataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Yerde/NPS

'U.S. Nuclear Regulatory Commission P. 0.

Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th-Street Phoenix, Arizona 85040 Bruce Meyerson Arizona Center for Law in the Public Interest 112 North Fifth Avenue Phoenix, Arizona 85003

(

(

s I

I, 1

REQUESTS FOR ADDITIONAL GEOLOGIC INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2 AND 3 ARIZONA PUBLIC SERVICE COMPANY DOCKET NOS.

STN 50-528/529/530 Eberly and Stanley's (1978) paper addresses the structural geology in the site vicinity (within five to ten miles).

Discuss the impact (and validity) of their interpretation of the subsurface with respect to:

a.

The existence of mountain-basin bounding faults in the Arlington-Gillespie Dam area.

b.

The validity of their interpretation of the site vicinity geologic structure as shown on their Figure 8, p. 933.

c.

The significance of Eberly's and Stanley's interpretation with respect to site safety.

I Describe your 'post-1978 Palo Verde.4 and 5 PSAR activities with respect to the geologic.and seismological updating of the Palo Verde 1,'

and 3 FSAR.

Figure 2 (page

6) of a November, 1979 Dept. of Energy report shows two inferred faults in the Hassayampa Plain northeast of the Palo Verde site.

Discuss the validity of these faults and their site-safety significance.

The DOE report is titled "Geothermal studies in Arizona with two area assessments (DOE/ID/12009-T4)".

Describe the basis used for categorizing the fault (see FSAR Fig. 2.5-6) in the Sand Tank Mountains area some 36 miles SE of the Palo Verde site as older than 500,000 years.

Detai led geophysical surveys (gravity and magnetic) recently-conducted by C; Cloran (Geophysics, Hydrology and.Geothermal Potential of the Tonapah Basin; Maricopa County, Arizona, MS Thesis, Arizona State University, May, 1977) within five. miles of the Palo Verde site indicate that the Tonapah Basin. is bounded by normal. faults.

Discuss the impact of Cloran's interpretation of the subsurf'ace with.respect to:

<<2-a.

Site safety b.

The capabi lity (or non-capability) of the basin-bounding faults suggested by Cloran.

c.

The validity of the structural interpretation of the Tonapah Oesert area as shown on FSAR figure 2.5-8 and other related FSAR figures.

~

(g