ML17297A536

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-528/81-06,50-529/81-06 & 50-530/81-06 on 810428-0501.No Noncompliance Noted
ML17297A536
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/12/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17297A537 List:
References
NUDOCS 8107010419
Download: ML17297A536 (4)


See also: IR 05000528/1981006

Text

~flRf0y

A00

I

0 ++*++

~

'NITED

STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94599

June

12,

1981

Docket Nos.

50-528,

50-529,

50-530

'g I'ILK

COF5'rizona

Public Service

Company

P.

0.

Box 21666

Phoenix,

Arizona

85036

Attention:

Hr.

E.

E.

Van Brunt, Jr., Vice President

Nuclear Projects

Hanagement

Gentlemen:

,'tta(fg,

"UtI 30 138In

II<4 t%aua u~pgg

COMMJ55 I0Ij

Subject:

NRC Inspection

This refers to the inspection

conducted

by Hessrs.

J.

H. Eckhardt

and

J.

F. Burdoin of this office during the period April 28-Hay 1,

1981 of

activities authorized

by NRC Construction Permit Nos.

CPPR-141,

-142,

and -143,

and to the discussion of our findings held by Hr. Eckhardt

with you and members of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

weve identified within

the scope of this inspection.

In accordance

with 10 CFR 2.790 of the Commission's

regulations.,

a copy

of this letter and the enclosed

inspection

(or investigation}. report

will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractors)

believe to be exempt from

disclosure

under

10 CFR 9.5(a)(4}, it is necessary

that you (a) notify

this office by telephone within ten (10) days

from the date of this

letter of your intention to file a request for withholding; and (b} submit

within 25 days from the date of this letter

a written application to

this office to withhold such information. If your receipt of this

letter has

been delayed

such that less

than seven

(7} days are available

for your review, please notify this office promptly so that

a new date

may be established.

Consistent with section 2.790(b)(1),

any such

.Si0P0zoglV

5l

)

'

0

'F00 3.fl~q 3f

N I

8

h

Arizona Public Service

Company

-2-

June

12,

1981

application must

be accompanied

by an affidavit executed

by the owner of

the information which identifies the document or part sought to be

withheld,

and which contains

a full statement of the basis

on which it

is claimed that the information should

be withheld from public disclosure.

This section further requires

the statement

to address

with specificity

the considerations

listed in 10 CFR 2.790(b)(4).

The information sought

to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit.

Ifiwe do not hear from you in this regard within

the specified periods

noted above,

the report will be placed in the

Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Reactor Constructi

n Project

ranch

Enclosure:

IE Inspection Report

Nos.

50-528/81-06

50-529/81-06

50-530/81-06

0

8