Responds to NRC 801121 Ltr Re Violation Noted in IE Insp Rept 50-528/80-17.Corrective Actions:Cleaned & Covered Unit 1 Motor Operators of Isolation Valves in Main Steam & Feedwater Sys.Component Incorporated Into Maint Program
ML17296B249
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/17/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17296B248 List:
References
ANPP-16910-BSK, NUDOCS 8103050759
Download: ML17296B249 (8)


Text

4!

ulBltRBZSL p'QN IFXfc3I Ml lX (QCo)EQEM~F P. 0 BOX 2I666 'HOENIX'RIZONA SSO36 December 17, 1980 ANPP-16910-BSK/JAR

~

g 0 C5 U. S. Nuclear Regulatory Commission Region V

. ~c Walnut Creek Plaza Suite 202 1990 North California Boulevard 9+0~ c c~g P,~~

Walnut Creek, California 94596

\

Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

NRC Resident Inspection of September 8-30, 1980 File: 80-019-026 D.4.33.2

Dear Sir:

This letter refers to the Inspections conducted by Mr. L. E. Vorderbrueggen during the period of September 8-30, 1980, as documented in your letter of November 21, 1980, of activities authorized by the Nuclear Regulatory Com-mission (NRC) Construction Permit Nos. CPPR-141, 142 and 143.

During this Inspection, one (1) item of noncompliance was identified. Our response to this item of noncompliance (Severity Level 5 Violation (Supple-ment II)) is presented in the enclosed Attachment A.

Very truly yo E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment ceo Do B. Fasnacht R. L. Robb J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide A. C. Gehr W. H. Wilson W. J. Stubblefield R. L. Patterson R. M. Grant D. R. Hawkinson 8~9a oso ~5g

C 1

l l

ATTACHHENT A Docket No. 50-528 Construction Permit No. CPPR-141 Notice of Violation As a result of'the Inspection on September 24, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

10CFR50,'ppendix B, Criterion V, Instructions, Procedures and Drawings, as implemented PSAR Section 17.1A.5, requires that activities affecting quality be accomplished in accor-dance with instructions, procedures or drawings appropriate to the circumstances.

Paragraph 8.11 of the Constructor-Engineer's Work Plan Procedure/Quality Control Instruction No. 28.0, entitled

">faintenance of Materials and Equipment" requires that motor-operated valves be maintained according to the manu-facturer's instructions.

Contrary to the above, as of September 24, 1980, the motor operators of isolation valves installed at Unit 1 in the main steam and feedwater systems were not undergoing the periodic inspections and maintenance prescribed by the manufacturer.

This is a Severity Level 5 violation (Supplement II).

~Res esse Corrective Ste s Which Have Been Taken Subsequent to the Finding, the Unit 1 motor operators of the isolation valves in the main steam and feedwater sys-tems were immediately cleaned and covered per the manu-facturer's requirements.

Corrective Ste s Taken to Avoid Further "Violations The isolation valves and their respective operators for the main steam and feedwater systems for Units 1 and 2 were in-corporated into the maintenance program October 17, 1980.

The valves and operators are being maintained on a monthly basis.

I II

The last shipment of the isolation valves for Unit 3 was received on the jobsite November ll, 1980, placed in storage and incorporated in the maintenance program on December 4, 1980.

We are also reviewing the procedures and the maintenance program list to assure that (a) in the future, appropriate equipment will be included, and (2) other items have not been inadvertently omitted. These activities will be com-pleted by February, 1981.

Date When Full Com liance Will Be Achieved Corrective steps identified were completed on the dates stated in the preceding paragraphs.

C STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA )

I, E. E. Van Brunt Jr. , represent that I am Vice President Nuclear Pro ects of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority so to do, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therin are true.

( ) gu.c ~ u.m E. E. Van Brunt, Jr.

Sworn to before ne this I %day of 'DPIUfyA'8 gubllllff .

~

19 F(

),~)> ~ )

f).>>

I s

s 1

,9 Notary Public My Commission Expires:

E "1