Notifies of Conference Call W/Util to Be Scheduled Prior to Independent Design Review Meetings,Insuring Familiarization W/Fsar & Other Documentation Used in Normal Review.Design Review Meeting Schedule Encl
ML17296B223
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/13/1981
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Benaroya V, Rolonda Jackson, Rosa F
Office of Nuclear Reactor Regulation
References
NUDOCS 8102230499
Download: ML17296B223 (8)


Text

~ll Rangy (4

~o 4p

+c c

0O

+~*~4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

,'-,e<K (Fj) ',

t'ED L 8 1981m 9'b% Nlataa a~ggg ComISSg~

FEB i 3 1981 Dy MEMORANDUM FOR:

V.

R.

F.

0.

R.

V.

M; T.

Benaroya, Chief, Chemical Engineering

Branch, DE
Jackson, Chief, Geosciences
Branch, DE Rosa, Chief, Instrumentation and Control Systems
Branch, DSI Parr, Chief, Auxiliary Systems
Branch, DSI Bosnak, Chief, Mechanical Engineering
Branch, DE Moore, Chief, Human Factors Engineering
Branch, HFS Butler, Chief, Containment Systems
Branch, DSI Murphy, Chief, Radiological Assessment
Branch, DSI FROM;

SUBJECT:

F. Miraglia, Acting Chief, Licensing Branch No. 3, DL SCHEDULE FOR INDEPENDENT DESIGN REVIEW (IDR) MEETINGS FOR PALO VERDE By memorandum dated November 10, 1980, R. L. Tedesco described the IDR process and requested that review areas be identified which are amenable to this new review concept.

Review areas for which you are responsible were identified and a schedule for participating in the Palo Verde meetings in each of those areas was established (Attachment 1).

Although Q-ls and Q-2s"are not. required, your reviewers should be -familiar with. the FSAR and other, documentation used in their normal review before attending the IDR meeting.

Approximately 3-4 weeks prior to the scheduled

meeting, the principal reviewers-will be asked to participate in a conference call with the utility.

During that conference call, an agenda for the meeting and the selection of IDR board members: will be approved.

In three review areas (Seismology, Geology, Mechanical Engineering),

working meetings will be held in lieu of IDR meetings.

For these meetings, a draft SER will be sent to the applicant a few weeks before the meeting.

The purpose of the meetings will be to resolve all open items in the draft SER.

As with tlie IDR process, Q-ls and Q-2s are not issued.

If you have any problems with the established

schedule, please contact the project manager, Janis
Kerrigan, on X27272.

Frank J. Miraglia, Acting Chief Licensing Branch No.

3 Division of Licensing cc:

See next page.

0 l

p'>

II J

V l

1<",

i "

P~>l C

N"~/

. e" ~ N~

cc:

R.

R.

D.

C.

J.

V.

p.

M; J.

S.

G.

0.

H.

P.

J.

J.

D.

J.

J.

R.

Tedesco Purple Ei'senhut Grimes Miller Noonan Check Kreger Kni'ght Hanauer Harrison Chopra Lefevre Sobel Rosentlial Mermiel Terao Shapaker Pulisipher Ramirez

Ij tv If/

Attachment 1

Week of 02/09/81 02/16/81 02/23/81 03/02/81 03/09/81 03/16/81 03/23/81 03/30/81 04/06/81 04/13/81 04/20/81 04/27/81 05/04/81 05/11/81 05/18/81 05/25/81 06/01/81 06/08/81 06/15/81 06/22/81 06/29/81 07/06/81 07/13/81 07/20/81 07/27/81 08/03/81 08/10/81 08/17/81 08/24/81 08/21/81 08/31/81.

09/07/81 09/14/81..

09/21/81 09/28/81 Palo Verde meetin s in Arizona

(Conf. Call) - Complete Fire Protection,

  • Chapter 14. Startup

& Test Program

  • Seismology, Geology (tentative)

Auxiliary Systems (meetings 1 and 2)**

Instrumentation and Control

  • Mechanical Engineering review Control Room Design, *I&C drawing review Containment
Systems, Radiation Protection Auxiliary Systems (meetings 3 and 5)**

Auxiliary Systems (meeting 4)*~

Instrumentation

& Control

  • I&C drawing review Containment Systems

(?)

Working meeting only, no board required See next page.

l

)

Ir

,ll

Auxiliary Systems IDR Meetin SRP Section 9.1.1 9.1. 2 9.1.3 9.1. 4 9.2.1 9.2.2 9.2.5 5.4. 11 9.2.3

9. 2.4 9.2.6 9.3.1
10. 3 10.4.7 10.4.5 9.3. 3 3.6.1 3.5.11 3.5.2 3.'4. 1 9.4.1 9.4. 2 9.4.3 9.4.4 9.4.5 Titie New Fuel Storage Spent Fuel Storage Spent Fuel Cooling Fuel Handling Service Water Component Cooling Water Ultimate Heat Sink Pressurizer Relief Valve Demineralized Water System Potable and Sanitary Water System Condensate Storage Compressed Air Main Steam Condensate and Feed Water Circulating Water System floor Drainage Protecti on Against High and Moderate Energy Line Breaks External Missiles (Inside Cont.)

External Missiles Flood Actuation Control Room Ventilation Fuel Pool Area Ventilation Auxiliary Radwaste Area Ventilation Turbine Area Ventilation ESF Area Ventilation

k

'III