Text
APPENDIX A Arizona Public Service Company P.
0.
Box 21666
- Phoenix, Arizona 85036 Docket Nos.
50-528, 529 Construction Permit Nos.
CPPR-141, 142 NOTICE OF VIOLATION Based on the results of the NRC Inspection conducted on April 15-18,
- 1980, it appears that certain of your activities were not conducted in full compliance with conditions of your NRC Construction Permit Nos.
CPPR-141 and 142 as indicated below:
paragraph (2), states that, "The holder of a construction permit shall within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notify the appropriate Nuclear Regulatory Commission Inspection and Enforcement Regional Office of each reportable deficiency."
Additionally, 10 CFR 50.55(e),
paragraph (3), states that, "The holder of a construction permit shall also submit a written report on a reportable deficiency within thirty (30) days to the appropriate NRC Regional Office...."
Contrary to the above, on February 7, 1980 you notified the NRC Inspection and Enforcement Regional Office resident inspector at Palo Verde that a potentially reportable deficiency had been identified wherein a visual examination was specified and performed on certain class 3 pipe welds rather than magnetic particle, liquid penetrant or radiographic testing as required by the governing section III of the ASME Boiler and Pressure Vessel Code.
A written report on the potentially reportable item was submitted to the appropriate NRC Regional Office on April 10, 1980 which was not within the required 30 day reporting period.
This is a deficiency.
8007219 5~~