ML17296A797

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Dowel Omission During Concrete Placement
ML17296A797
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/08/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17296A798 List:
References
ANPP-15853-BSK, NUDOCS 8007160546
Download: ML17296A797 (6)


Text

~ 9+

REGULATORY eFORMAT ION DISTRIBUTION STORM (RIBS)

ACCESSION NBR:8007160546 DOC ~ DATE: 80/07/08 NOTARIZED'O DOCKET FACIL:STN 50~530 Palo Verde Nuclear StationE Unit 3i Arizona Publi 05000530 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTE E ~ E ~

Arizona Publ i c Servi ce Co ~

RECIP,NAME RECIPIENT AFFII.IATION SPENCERFG

~ ST Region 5E San Franciscoi Reactor Construction 8 Engineer

SUBJECT:

Forwards finel deficiency rept re dowel omission during concrete placement'ISTRIBUTION CODE:

BOI9S COPIES RECEIVED:LTR ENCL g

SIZE:

TITLE': Construction Deficiency Report (10CFRSO

~ 55K)

NOTES:Standardired Plant

~

05000530 REC IP IENT ID CODE/NAME ACTION:

A/D LICENSNG 21 LEKEJ ~

20 INTERNAL: AD/RCI/IE OIREHUM FAC SFY EQUIP QUAL BR 1 6 HYD/GKO BR 22 LIC QUAL BR MPA 08 OKLD 23 PRO TST REV BR 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT IO CODE/NAME SCHNENCKRBA ~

15 KERRIGANiJ ~

14 AEOD EDO 8

STAFF.

07 FIELD COOR/IK13 I8E 05 MOOREEV ~

NRC PDR 02 OR ASSESS BR 17 QA BR 10 STANDRDS DEV ii COPIES LTTR KNCI.

1 1

1 1

1 1

1 1i 2

2 1

1 1

1 1

1 1

1 1

EXTERNAL: ACRS NSIC 24 04 16 16 1

LPDR 03 1

1 Juj. 17 1989 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 41 ENCL 41

p

~

VV a

~

r

'V

I

,dl ~~<a ~na crozasxmw P. 0 BOX 2I666

'HOENIX'RIZONA85036 July 8, 1980 ANPP-15853-BSK/JAR U. S. Nuclear Regulatory Commission Region V

Walnut Creek Plaza ; Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Hr.

G.

S.

Spencer, Chief Reactor Construction and Engineering Support 'Branch

Subject:

A 50.55(e)

Reportable Condition Relating to Dowel Omission During Concrete Placement File:

80-019-026

Reference:

Telephone Conversation between J. Eckhardt and B.

S. Kaplan on June 5, 1980 (DER 80-.13)

Dear Sir:

Attached, is our final written report of the reportable deficiency under 10CFR50.55('e) relating to dowel omission during concrete placement in Unit (/3 of the Palo Verde Nuclear Generating Station.

E.

E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment

e I f f

Hr. G.

S. Spencer, Chief Reactor Construction and Engineering Support Branch ANPP-15853-BSK/JAR July 8, 1980 Page 2

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 A. C. Gehr Snell

& Wilmer R. L. Robb D. B. Pasnacht W. E. Ide B.

S. Kaplan A. C. Rogers J. If. Allen W. H. Wilson W.

G. Bingham W. J. Stubblefield J.

E. Bashore R.

W. Welcher D. R; Hawkinson J.

Brand

4 l

I/