APPENDIX A Arizona Public Service Company P. 0.
Box 21666 Phoenix, Airzona 85036 Docket No. 50-529 NOTICE OF VIOLATION Based on the results of the NRC inspection conducted on November 26-30, 1979, it appears that one of your activities was not conducted in full compliance with NRC requirements as indicated below:
10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and
- Drawings, as implemented by PSAR Section 17.1A.5, requires that activities affecting quality be accomplished in accordance with instructions, procedures, or drawings appropriate to the circumstances.
Bechtel instruction WPP/QCI-202.0 Appendix I, "Piping Systems Installation," item C.2.(c) requires that "any pipe system closures that are suspended at the end of a work day shall be capped 'and sealed".
Contrary to the above requirements, on swing shift November 26, 1979, nine ends of safety related pipe being installed in Unit 2 Auxiliary Building were observed to not be capped, and work had been suspended on the pipe at the end of day shift.
This is a deficiency.