ML17292B575

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/98-25 on 981227-990206 & Notice of Violation Re Lack of Attention to Procedure Requirements Resulted in Hydraulic Control Unit Indication Not Functioning as Required Following Maint
ML17292B575
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/04/1999
From: Laura Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17292B576 List:
References
50-397-98-25, NUDOCS 9903110208
Download: ML17292B575 (8)


See also: IR 05000397/1998025

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RZDS)

ESSION NBR:9903110208

DOC.DATE: 99/03/04

NOTARIZED: NO

DOCKET

- CZL:50-397

WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

SMITH,L.J.

Region

4 (Post

820201)

RECZP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

P

SUBJECT:

Forwards insp rept 50-397/98-25

on 9981227-990206

& notice

of violation.

DISTRIBUTION CODE: IEOIP

COPIES

RECEIVED:LTR Q ENCL g

SIZE: f +~i5

TITLE: Gene'ral '(5U"'Dict) -Insp "Rept/Notice of Viol.ation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD

ILE CE

CB

NUDOCS -ABSTRACT

OGC/HDS3

RNAL: LMITCO MARSHALL

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1"

1

1

'

1

1

1

1

~

RECZPIENT

ID CODE/NAME

CUSHZNG,J

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1.

1

1

1

1

1

1

1

1

1

1

0

D

C

PgQg~

'AI4"

PLE

N

NOTE TO ALL "RIDS" RECZPZENTS:

PLEASE HELP US TO REDUCE

WASTETH

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION

CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL N6vxur'x"'QF" COPIES

REQUIRED

LTTR

19

ENCL

19

, *,'~~.

"'~

.

NUCLEAR REGULATORYCOMMISSION

~

$

'EGION IV

611 RYANPLA2ADRIVF SUITE 400

+

ARLINGTON,TEXAS76011~

0*4

gg 4

Ivvd

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT: NRC INSPECTION REPORT 50-397/98-25 AND NOTICE OF VIOLATION

Dear Mr. Parrish:

This refers to the inspection conducted from December 27;1998, through February 6, 1999, at

your Washington Nuclear Project-2 facility. The enclosed report presents the results of this

inspection.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred that included two examples.

This violation is cited in the enclosed

Notice of Violation (Notice), and the circumstances surrounding the examples are described in

~

the subject inspection report. These examples are of concern because the lack of attention to

procedure requirements resulted in hydraulic control unit indication not functioning as required

following maintenance and scaffolding being supported by a non-load bearing member of a

Class

1 component without an engineering evaluation.

The NRC has concluded that information regarding the reason for the violation and the

corrective actions taken and planned to correct the violation and prevent recurrence is already

adequately addressed

on the docket in the enclosed inspection report. Therefore; you are not

required to respond to this letter unless the description therein does not accurately reflect your

corrective actions or your position.

In that case, or ifyou choose to provide additional

information, you should followthe instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures, and your response willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Docket No.:

50-397

License No.:

NPF-21

9903ii0208 990304

PDR

ADQCK 05000397

8

PGR

Linda J. Smith, Acting Chief

Project Branch E

Division of Reactor Projects

Washington Public Power Supply System

-2-

k

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report No.

50-397/98-25

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

Vice President-Generation/Plant

General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 1396)

General Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington. Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

'cc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: QWNLWN825RP.JES

To receive copy of docume'nt, indicate in box: "C" = Copy without enclosures

"E" = Copy

with enclosures "N" = No co

RIV:ASRI

JES

ets

03

/99

AC:DRP

LJSmith

03/ /99

OFFICIAL RECORD COPY

Washington Public Power Supply System

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: 3 WNFWN825RP.JES

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy

with enclosures "N" = No co

RIV:ASRI

JES

ets

AC:DRP

LJSmith

03/'99

OFFICIAL RECORD COPY