ML17285A985
| ML17285A985 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/30/1990 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| GL-88-20, TAC-74489, NUDOCS 9002020288 | |
| Download: ML17285A985 (4) | |
Text
January 30, 1990 Docket No. 50-397 Mr. G.
C Sorensen, Manager Regulatory Programs Washington Public Power Supply'ystem P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352 Dear Mr. G.
C. Sorensen:
D ISTRIBUTION I~~
NRC 8 Local PDRs PD5 Reading JZwo1ins ki PShea f'GC EJordan ACRS (10)
MBoyle JFlack
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE)
Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (I) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated November I, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach, methodology and schedule are acceptable.
We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement
- Program, will not have any adverse effect on your schedule.
However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
Sincerely, DRS PP5 PShI/
90 cc:
See next page DRSP/PD5 RSamgorth:sg 1/l'. F/90 original signed by Robert Samworth Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III IV, V and Special Project A
/DRSP/PD5 rammell 1/j (90 9002020288 900130 PDR ADOCK 05000397 P
PDC (i0
<<~R AEVI
~o
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 30, 1990 Docket No. 50-397 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 Dear Mr. Mr. G.
C. Sorensen:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUALPLANT EXAMINATIONS (IPE)
Generic Letter 88-20 requires,. in part, that each operating reactor licensee and construction permit holder: (I) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement I of the generic letter.
We have reviewed your letter dated November I, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach, methodology and schedule are acceptable.
We anticipate that
'any possible additiona'I analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule.
However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
S incere ly, cc:
See next page Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III IV, V and Special Project
Mr. G.
C. Sorensen WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Hr. C. H. Powers WNP-2 Plant Manager Washington Public Power Supply System P.O.
Box 968, MD 927M Richland, Washington 99352 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0. Box.968 3000 George Washington Way
- Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Hail Stop PY-ll Olympia, Washington 98504 Mr; Alan G. Hos1er, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Hr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.
Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell
& Reynolds 1400 L Street NW Washington, D.C.
20005-3502
h
'E 1