ML17279B013
| ML17279B013 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/18/1988 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17279B014 | List: |
| References | |
| NUDOCS 8805030358 | |
| Download: ML17279B013 (3) | |
See also: IR 05000397/1988002
Text
ACCEIZRATZD
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8805030358
DOC.DATE: 88/04/18
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
MARTIN,J.B.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
SUBJECT:
Forwards Insp Rept 50-397/88-02
on 880121-0310
& notice of
violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB ll
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
ERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1.
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
O~SI.BBE, J
6-
02
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
Docket No.
50-397
hI'R
S
S
198&
Washington Public Power Supply System
P.
0.
Box 968
Richland,
99352
Attention:
Mr.
G.
C.
Sorensen
Manager of Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
C. J.
Bosted
and
R.
C.
Sorensen
of this office during the period January
21 " March 10,
1988 of
activities authorized
by
NRC Operating
License
No.
and to the
discussions
of findings held by the inspectors
with Mr.
C.
Powers
and other
members of the Supply System's staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel
and observations
by the inspectors.
Based
on the= results of this inspection, it appears
that two of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10
CFR 2.201
as stated in Appendix A, Notice of Violation.
In
accordance
with 10
CFR 2.790(a),
a copy of this letter, the enclosures,
and
your response
wi 11
be placed in the
NRC Public Document
Room.
We recognize that the specific design
problems cited in Violation B of the
enclosed
Notice were identified by your plant staff personnel.
However,
we
are concerned that your management
did not recognize
these
(and other design
problems discussed
in the enclosed
inspection report)
as
symptoms of a possible
breakdown in your design control program,
and that
a thorough root cause
assessment
of the problems
was not initiated.
In view of these
observations
and those identified during our August 1987 Safety System Functional
Inspection
(Inspection
Report
No. 87-19),
we request that in your response
you also
provide detailed findings of the guality Assurance
root cause
assessment
of
the design review inadequacies;
corrective actions,
including your schedule
for completion of the corrective actions;
and your assessment
of the quality
of modifications that have
been previously installed in the plant.
The response
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget as
required
by the Paperwork Reduction Act of 1980,
PL 96-511.
8805030358
8804iS
ADOCK 05000397
O
APR '
jSIIS
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
Di"Ill(Sl
J.
B.
Regiona
Administrator
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection
Report
No. 50-397/88-02
cc w/enclosures:
A.
L. Oxsen,
WPPSS Director, Operations
R.
B. Glasscock,
WPPSS Director, Assurance
& Licensing
C.
M. Powers,
WNP-2 Plant Manager
P.
L. Powell,
WNP-2 Licensing Manager
G ~
E.
Doupe,
Esq.
N.
S.
Reynolds,
Debevois,
Cook, Purcell
& Reynolds
State of Washington
bcc w/enclosures:
Resident
Inspector
Project Inspector
docket file
G.
Cook
A. Johnson
B. Faulkenberry
J. Martin
D. Persinko,
bcc w/o enclosure
2:
LFMB
M. Smith
REGION V/dot
CSorensen
CB sted
4/ lQ'8
4/i+88
on
4//2.
8
AJo pson
4//Vi88
. P.eZ-
RZimmerman
4/H/88
/
NO
YES /
NO
E
/
ES /
NO
YES /
NO
R
EST
COPY
Q
COPY
EST
COPY ] REQUES
Y ]
R
VEST
COPY ]
AChaffee
OKi+sch
JM
4/g /88
4/~~88
4/
/88
Q EST
COPY ] REQUEST
COPY ]
COPY ]
YES /
NO
/
NO
ES /
NO
TO
]
YES /
NO