ML17279A973

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/88-09 on 880307-11.No Violations Noted
ML17279A973
Person / Time
Site: Columbia 
Issue date: 03/30/1988
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279A974 List:
References
NUDOCS 8804190119
Download: ML17279A973 (5)


See also: IR 05000397/1988009

Text

) . ACCELERATED

DQFRIBUTION

DEMONS

ATION

SYSTEM

I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8804190119

DOC.DATE: 88/03/30

NOTARIZED: NO

DOCKET

N

FACIL:50-397 WPPSS Nuclear Project,,Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

ZIMMERMAN,R.P.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SORENSEN,G.C.

Washington Public Power Supply System

SUBJECT:

Forwards Insp Rept 50-397/88-09

on 880307-11.No violations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR I

ENCL

/

SIZE:

+ S

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB ll

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB1 2

OGC 15-B-18

RES/DRPS

DIR

ERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

SAMWORTH,R

AEOD

NRR MORISSEAUED

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

RMAN,J

02

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

I

A

D

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

J

Docket Nos.

50-397

Washington Public Power Supply System

P.

0.

Box 968

3000 George Washington

Way

Richland,

Washington

99352

Attention:

Mr.

G.

C. Sorensen,

Manager

Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection of Nuclear Plant

No.

2

This letter refer s to the, inspection

conducted

by Mr.

C.

W. Caldwell of this

office on March

7 through March ll, 1988, of activities authorized

by NRC

License

No.

NPF-21 and to the discussion

of our findings held by Mr. Caldwell

with members of the Supply System staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No violations of NRC requirements

were identified within the scope of this

~

~

inspection.

In accordance

with 10

CFR 2.790 (a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

,Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

(GLLc~>(

)LM ~)( gq'L( +

R.

P. Zi merman,

Chief,

Reactor Projects

Branch

Enclosure:

Inspection

Report

No. 50-397/88-09

8804i90219

880330

PDR

ADOCK 05000397

DCD

cc w/enclosure:

C.

M. Powers,

WPPSS

P. L. Powell,

WPPSS

R.

B. Glasscock,

WPPSS

J.

0. Martin,

WPPSS

G.

E.

Doupe,

WPPSS

W. G. Conn,

Burns

8 Roe, Inc.

State of Washington

N. S. Reynolds,

Esq.,

BCPSR

C

el 1

PP$

03/++88

037

-2-

g/

RZi

erman

03/0~/88

T

PY

ES /

NO

U

S

C

PY

RE(VEST

PY

S

Rj

YES

/i

NO

YES /

0

ES /

NO