Forwards Insp Rept 50-397/87-15 on 870524-0711.No Violations Noted
ML17279A479
Person / Time
Site: Columbia 
Issue date: 07/31/1987
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279A480 List:
References
NUDOCS 8708200375
Download: ML17279A479 (4)


See also: IR 05000397/1987015

Text

I

REGULATORY INFQRMATIQN DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NBR: 8708200375

.DOC. DATE: 87/07/31

NOTARIZED:

NO

FACIL: 50-397

WPPSS Nuclear

Prospect>

Unit 2i

Washington Public

Poee

AUTH. NAME

AUTHOR AFFILIATION

ZIMMERMANiR. P.

Region

5i Office of Director

REC IP. NAME

RECIPIENT AFFILIATION

SORENSEN. G. C.

Washington Public

Power Supply

System

DOCKET ¹

05000397

SUBJECT:

Foreards

Insp Rept 50-397/87-.15

on 870524-0711.

No violations

noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice

of>> Violation Response

NOTES:

REC IP IENT

ID CODE/NAME

PD5

PD

INTERNAL: ACRS

DEDRO

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ ILRB

OGC/HDS2

RES

DEPY GI

TERNAL:

LPDR

NSIC

CQP IES

LTTR ENCL

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

SAMWORTH. R

AEOD

NRR

MOR ISSEAUs D

NRR/DREP/EPB

NRR/DRIS DlR

QE LIEBERMANiJ

F IL

GhT

F ILE

01

NRC

PDR

CQP IES

LTTR ENCL

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

Docket No.. 50-397

Washington Public, Power Supply System

.

P.

0.

Box 968

Richland,

Washington

99352

Attention:

Mr.

G.

CD Sorensen

Manager of Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

R.

Dodds

and

C.

Bosted of

this office during the period of May 24 - July ll, 1987, of activities

authorized

by

NRC Operating

License

No.

NPF-21,

and to the discussions

of

findings held by the inspectors with Messrs.

C.

Powers,

J.

Baker and other

members of the Supply System's staff at the conclusion. of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

No violations of NRC requirements

were identified. within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincer ely,

OP('&()73./ '5/C'll ~

R.

P.

Zimmerman, Chief

Reactor Projects

Branch

Enclosure:.

Inspection

Report

No. 50-397/87-15

cc: .,C.

M. Powers,

WNP-2 Plant Manager

~

P.

L. Powell,

WNP-2 Licensing Manager

R.

B. Glasscock,

WNP-2 Director, Assurance

8 Licensing

State of Washington

N.

S.

Reynolds,

D'ebevois

and Liberman,

Cook, Purcell

8

Reynolds

8708200375

870733i9

PDR

ADOC<,05000397

6

bcc w/enclosure:

RSB/Document Control

Desk (RIDS) (IE01)

Project Inspector

Resident Inspector

docket- file

G.

Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

LFMB

M. Smith

RE

V

dot

d

7/M/87

7/3"787

7/Z~/87

RZimmerman

7 /5i/87

REEVES

]

Eg

ST

COPY ], EgU ST

COPY ]

gU

T COPY ]

YES

NO

YES

NO

YES /

NO

ES

NO

END TO

PDR

]

ES

NO

]