Text
- CCESSION
NBR
FAC IL: 50-397
TH. Nhl'tE
FFEE> A. E.
~CIP. NANE
SORENSEN> G. C
REGULATORY INFORN*TLON DISTR
'I BUTI ON SYSTEM
< R IDS )
8706050201
DOC. DATE: Br/05/21
NOTARIZED:
NO
DOCKET
WPPSS Nuclear Pro gee t>
Uuit
2>
Mash ington
Pub 1 i c
PoI.<e
05000397
AUTHOR AFFILIATI C<,"3
Region
5> Office of Director
RECIPIENT AFFILIATION
Washington Public
Po'.<er
Supp)g
System
SUBJECT:
Forwards
Insp Rept 50-397/87-11
on 870427-0501.
No viol@Lions
noted.
DISTRIBUTIOiV CODE:
IEOID
COPIES
RECEIVE<i: LTR
~
ENCL Q
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAt'1E
PD5 LA
SANNORTH
R
INTERNAL: ACRB
DEDRO
NRR ROE,Z.L
NRR/DREP/EPB
NRR/DRIS DIR
OQC/HDS2
DEPY GI
EX
RNAL:
LPDR
COPIES
LTTR ENCL
1
0
2
2
2
2
1
1
1
1
1
REC IP I ENT
ID CODE/NAilE
PD5
EN" LIEBERNAN
NRR/DOEA DIR
NRR/DREP/RPB
N"
S/ ILRB
REC FIL
E
01
NRC
COP IES
LTTR ENCL
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
TOTAL NUI')BER OF COPIES
REQUIRED:
LT I R
23
ENCL
22
Docket Nos. 50-397
Washington Public Power Supply System
P. 0.
Box 968
3000 George Washington
Way
Richland, Washington
99352
Attention:
Mr. G. C. Sorensen,
Manager
Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection of Nuclear Plant
No.
2
This letter refers to the inspection
conducted
by Mr. C.
W. Caldwell of this
office on April 27 through
May I, 1987, of activities authorized
by
NRC
License
No. NPF-21 and to the discussion of our findings held by Mr. Caldwell
with members of the Supply System staff at the conclusion of the inspection.
Areas examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
~
~
. E. Chaffee,
Ac
ng Chief,
Reactor Projects
Branch
Enclosure:
1.
Inspection
Report No. 50-397/87-11
cc w/enclosure:
C.
M. Powers,
P. L. Powell,
R. B. Glasscock,
J.
D. Martin,
G.
E. Doupe,
W. G. Conn,
Burns
8 Roe, Inc.
State of Washington
N. S. Reynolds,
Esq.,
BCPSR
870 b05020 1 870521
ADOCK 05000397
6
Region
Y
CCa1 dwel
PJohn'son
5/P//87
5/ i( /87
REQUESTED
/,'ES/
0
~YES/NO
dl
AChaffee
5/z t/87
YES
NO
YES/NO
bcc w/enclosure:
RSB/Document Control Desk (RIDS) (IE01)
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
J. Hartin
Docket File
bcc w/o enclosure:
LFHB
M. Smith