ML17279A244
| ML17279A244 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/16/1987 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17279A245 | List: |
| References | |
| NUDOCS 8705040159 | |
| Download: ML17279A244 (4) | |
See also: IR 05000397/1987004
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEN
(R IDS)
ACCESSION
NBR: 8705040159
DOC. DATE: 87/0~ /16
NOTARI ZED:
NO
DOCKET ¹
FACIL: 50-397
WPPSS Nuclear Progecti
U>>it 2i
Washington Public
Po':>e
05000397
UTH. NANE
AUTHOR AFFILIATION
AFFEEi A. E.
Region
5i Office of Director
ECIP. NANE
RECIPIENT AFFILIATIOIN
SORENSENi Q. C.
Washington Public Pover Supply
System
SUBJECT:
For!!!ards Insp Rept 50-397/87-04
on 870215-0331.
No violations
noted.
DISTRIBUTION CODE;
IEOID
COPIEB RECEIVED; LTR l
ENCL Q
SIZE: JR~+
TITLE: Qeneral
(50 Dkt)-Insp Rept/Notice of Vio)ation Response
NOTES:
REC IP IENT
ID CODE/NAME
PD5 LA
SANWORTH> R
INTERNAL: ACRS
DEDRO
NRR ROE, N. L
NRR/DREP/EPB
NRR/DRIS DIR
OQC/HDS2
RES SPEI 8 T
ETERNAL:
LPDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD5
EN~
LIEBERNAN
NRR/DOEA Dl'R
NRR/DREP/RPB
N
S/ ILRB
EG
RQN5
FILE
01
NRC
COPIES
LTTR EiNCL
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
TOTAL NUl'1BER OF COPIES
REQUIRED:
LTTR
22
ENCL
21
APR i6 1987
Docket No.
50-397
,Washington Public Power Supply System
P. 0.
Box 968
Richland, Washington
99352
Attention:
Mr. G.
C. Sorensen
Manager of Regulatory
Programs
Gentlemen:
a
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
R. Dodds,
R. Barr
and
C. Bosted of this office during the period of February
15 - March 31, 1987, of
activities author ized by NRC Operating License
No. NPF-21,
and to the
discussions
of findings held by the inspectors
with Messrs.
C. Powers, J.
Baker and other
members of the Supply System's staff at the conclusion of the
inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel
and observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
I
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
~ A. E. Chaffee
Actin.g Chief
Reactor'Projects
Branch
~ Enclosure:
Inspection Report No. 50-397/87-04
"CC:
C. M. Powers,
WNP-2 Plant Manager
P. L. Powell,
WNP-2 Licensing Manager
R. B. Glasscock,
WNP-2 Director, Assurance
Im Licensing
State of Washington
N. S. Reynolds,
Debevois
and Liberman,
Cook, Purcell
5
Reynolds
8705040159
870416
ADOCK 05000397
Q
-2-
APR 5 6 l987
bcc w/enclosure:
RSB/Document Control
Desk (RIDS) (IEOl)
Project Inspector
Resident
Inspector
R. Huey,
docket file
G. Cook
..B. Faulkenberry
J. Martin
bcc w/o enclosure:
M. Smith
LFMB
REGION V/dot
R
ds/rosalie
Rearm
Ghosted
P o
on
AChaffee
4/!r/87
4/t~/87
4/lS/87
4/
/87
4/y/87
EST
OPY
REQUES
Y
REQUEST
PY
S
C
PY
REQUES
Y
YES
NO
YES /
NO
YES /
0
NO
YES /
NO ~
ES /
NO