ML17278B131
| ML17278B131 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/11/1986 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17278B132 | List: |
| References | |
| TAC-62181, NUDOCS 8612170144 | |
| Download: ML17278B131 (6) | |
Text
gp,Q REOy P0 E
0O o$
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
34 License No.
NPF-21 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
B.
The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),
dated August 18, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities wi Il be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the enclosure to this license amendment; and paragraph P.C.(2) of the Facility Operating License No. NPF-21 is hereby amended to read as follows:
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
34, and, the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
8612170140 861211 PDR ADOCK 05000397 p
t 0 I
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COPY)ISSION
Enclosure:
Changes to the Technical Specifications Elinor G. Adensam, Director BWR Proiect Directorate-No.
3 Division of BMR Licensing Date of Issuance:
December ll, l986
l ~
'I
ENCLOSURF.
TO LICENSE AMENDMENT NO. 34 FACILITY OPERATING LICENSE NO. NPF-21 DOCVET NO. 50-397 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.
The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
REMOYE INSERT 3/4 3-96 3/4 3-96
INSTRUMENTATION 3/4.3.8 TURBINE OVERSPEED PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.3.8 At least one turbine overspeed protection system shall be OPERABLE.
APPLICABILITY:
OPERATIONAL CONDITIONS 1 and 2.
ACTION:
a.
With one turbine governor valve or one turbine throttle valve per steam chest inoperable and not closed, restore the inoperable valve to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, isolate the affected steam chest from the steam supply, or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With one turbine interceptor valve or one turbine reheat stop valve inoperable, restore the inoperable valve to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close at least one valve in the affected steam line or-isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c.
With either of the the above required turbine overspeed protection systems otherwise inoperable, isolate the turbine from th'e steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE RE UIREMENTS
- 4. 3.8. 1 The provisions of Specification 4. 0.4 are not applicable.
4.3.8.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:
a ~
At least once per 31 days by:
Cycling each of the following valves through at'east one complete cycle from the running position for the overspeed protection control
- system, the electrical overspeed trip system and the mechanical overspeed trip system; 1.
Four high pressure turbine throttle valves, 2.
Six low pressure turbine reheat stop valves, 3.
Four high pressure turbine governor valves, and 4.
Six low pressure turbine interceptor valves.
WASHINGTON NUCLEAR - UNIT 2 3/4 3"96 Amendment No.
34