Text
Docket Noe. 50-397jqg '5&
Washington Public Power Supply System
P.
0.
Box 968
3000 George Washington
Way
Richland, Washington
99352
Attention:
Mr.
G.
C. Sorensen,
Manager
Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection of Nuclear Plant
No.
2
This letter refers to the inspection
conducted
by Mr.
C.
W. Caldwell of this
office on November
3 through November 5, 1986, of, activities authorized
by
NRC
License
No.
NPF-21 and to the discussion of our findings held by Mr. Caldwell
with members of your staff at the conclusion of the inspection.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and,representative
records,
interviews with personnel,
and
observations
by the inspector.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted in full compliance with NRC requirements
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your respon'se
to this Notice is to be submitted in accordance
with the
provisions of 10 CFR 2.201,as
stated in Appendix A, Notice of Violation.
In accordance 'with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
, will be placed in the
NRC Public, Document
Room.
II
'The responses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required by the Paperwork Reduction Act of 1980,
PL 96-511.
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
8612120359
000397
861124
pDR
ADQCK 0
pDR
8
t
A.
E. Chaffee, Acting Chief,
Reactor Projects
Branch
1'
I
1
1
5
I
4
I
Vl
I
W
1
1
4
II
V
I
I $
I
V
"2"
Enclosures:
1.
Appendix
2.
Inspection
Report
No. 50-397/86-36
cc w/enclosures:
C.
H. Powers,
MPPSS
P. L.,Powell,
MPPSS
R. 'B. Glasscock,
MPPSS
J.
D. Hartin,
G.
E.
Doupe,
MPPSS
M.
G.
Conn,
Burns
& Roe, Inc.
State of Washington
,N.
S.
Reynolds,
Esq.,
BLCP8R
bcc w/enclosures:
RSB/Document, Control
Desk (RIDS)
Project Inspector
'Resident Inspector
'.
Cook
B. Faulkenberry
J. Hartin
'bcc w/o enclosure
2:
LFHB
REGION V
CCa
w 11/dot
P
son
AChaffee
ll/Al/86
ll/p2f/86 ll/~ /86
p
l'
)I
ll
t
-
a
J
1
I
1