ML17278A350

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/85-22 on 850610-28 & 0731 & Notice of Violation
ML17278A350
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A351 List:
References
NUDOCS 8508210169
Download: ML17278A350 (4)


See also: IR 05000397/1985022

Text

~>4 4~0O,

Vp0

C

00

I

/+

~p4

+a*++

Docket No. 50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

AUG 0 7 l985

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr. G.

C. Sorensen,

Manager

Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the routine inspection

conducted

by Mr. P. gualls of this

office between

June

10-28, July 31 and

a telephone

conversation

on July 9,

1985, of activities authorized by NRC Iicense

No. NPF-21,

and to the

discussion of our findings held by Mr. squalls with Mr. Powers

and other

members of your staff at the conclusion of the inspection.

0

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith

as Appendix A.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201

as stated in Appendix A, Notice of Violation.

Discrepant conditions, similar to those cited in the enclosed

Notice of

Violation, were identified in the Notice of Violation transmitted to you by

our letter dated

March 19,

1985,

and were addressed

in your response

dated

April 17,

1985.

At the time of this inspection,

however,

these

conditions

had

not been corrected.

We are concerned

about your apparent

lack of management

attention to the implementation of effective corrective actions

and your

apparent failure to apply sufficient attention to the area of fire protection

program implementation.

In addition to the response

directed by the enclosed

Notice, please

address

this issue in your reply, along with the actions

you

will take to ensure timely and effective corrective actions for identified

violations.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosure

and

your response will be placed in the

NRC Public Document Room.

8508210169

850807

7

9

p

t

1

>!

Washington Public Power Supply System

- 2-

AU) ()7 1986

The responses

directed by this letter and the accompanying Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

required by the Paperwork Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this.,inspection

we will be glad to

discuss

them with you.

Sincerely,

Orfg'anal signed by

-,Q< P~ Ãirsch

D. F. Kirsch, Acting Director

Division of Reactor Safety

and

Projects

Enclosures:

1.

Notice of Violation, Appendix A

i

2.

Inspection Report

No. 50-397/85-22

cc w/enclosures:

C. M. Powers,

WNP-2

P. I. Powell,

WNP-2

R. B. Glasscock,

WNP-2

J.

D. Martin, WHP-2

G. E. Doupe, Esq.,

WPPSS

W.

G.

Conn, Burns

R Roe, Inc.

State of WA

N. S. Reynolds,

Esq.,

Bishop, Liberman,

I

bcc:

RSB/Document Control Desk

(RIBS)

Mr. J. Martin

-Resident Inspector

H

RV

Pgualls:dh

8/ 0 /85

PJohnson

8/ y /85

AChaffee

8/ (I /85

DKirs h

8/

/85

AJo

son

8/

/85

I

h

I

II

I

4"

'II