0 ~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. '50-397 WPPSS NUCLEAR PROJECT HO.
2 AMIEHDMENT TO FACILITY OPERATING LICENSE License Ho.
HPF-21 Amendment Ho.
10 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee) dated March 14,
- 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will.operate in conformity with the application as
- amended, the provisions of the Act, and the regulations of the Coiimission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulation set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or the health arid safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No.
NPF-21 is amended to revise the Technical Specifications as indicated in the attachment to this amendment and paragraph 2.C.(2) of the Facility Operating License is hereby amended to read as follows:
(2) ~i1S i i i
dE i"
1P The Technical Specifications contained in Appendix A, as revised through Amendment No. 10, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
8507010201 850612 PDR ADOCK 05000397 P
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGUI STORY CONlISSION
Enclosure:
Changes to the Technica)
Specifications Date of Issuance:
JlN 1 8 Q5 Walt.er R. Butler, Chief Licensing Branch No, c.
Division of Licensing
~ ~
ATTACfll1ENT TO LICENSE AtlENDtiEHT NO.
10 FACILITY OPERATING LICFHSE NO. NPF-21 DOCKET NO. 50-397 I
Replace the following page of the Appendix "A" Technical Specifications with enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
REldOVE 3/4 4-11 INSERT 3/4 4-11
~ ~
~ ~
4 TABLE 3.4.3. 2-1 I
REACTOR COOLANT SYSTEM!PRESSURE ISOLATION VALVES VALVE NUMBER HPCS-V-4 HPCS-V-5 LPCS-V-5 LPCS-V-6 "RCIC-V-66 "RCIC-V-13 RHR-V-8 RHR-V-9/209 "RHR-V-23 RHR-V-41A, B, C
RHR-V-42A, B, C
RHR-V-50A/123A, 50B/123B RHR-V-53A, B
SYSTEM HPCS HPCS LPCS LPCS RCIC RCIC RHR RHR RHR RHR RHR RHR RHR TABLE 3. 4. 3. 2-2 REACTOR COOLANT SYSTEM INTERFACE VALVES LEAKAGE PRESSURE. MONITORS INSTRUMENT NUMBER HPCS-PIS-3 (E22"N003)
LPCS-PIS-5 (E21-N005)
RCIC-PS-21 (E51-N021)
FUNCTION HPCS Pump Suction Pressure High LPCS Pump Discharge Pressure High RCIC Pump Suction Pressure High ALARM SETPOINT si
< 80
< 442
< 91 RHR-PIS-22A, B,
C (E12-N022)
RHR Pump Discharge
< 475 Pressure to RPV High RHR-PS-18 (E12-N018)
RHR Pump Shutdown Cooling Suction Pressure High
< 168
- The 18 month leakage test for these valves is deferred until the first refueling outage.
WASHINGTON NUCLEAR - UNIT 2 3/4 4-11 Amendment No.
10