ML17278A232
| ML17278A232 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/31/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17278A233 | List: |
| References | |
| NUDOCS 8506240693 | |
| Download: ML17278A232 (2) | |
See also: IR 05000397/1985018
Text
acket No. 50-397
Washington Public Power Supply System
P. 0. Box 968
Richland, Washington,
99352
Attention:
Mr. G.
C. Sorensen
Manager, Regulatory Programs
e
I
Gentlemen:
)
I e
Subject:.
NRC Inspection at MNP-2
o
This refers to the routine, inspection
conducted
by Mr. P.
M. (}ualls of this
office on May 6-10, 1985,'f activities authorized
by NRC License
No. NPF-21
and to the discussion of our findings held by Mr. gualls with members of your
staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these areas,
the inspection consisted, of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In, accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this inspection
we will be glad to
discuss
them with you.
Enclosure:
Inspection Report No. 50-397/85-18
gincerel
D. F.
irech, Acting Director
Division of Reactor Safety
and
Projects
CC:
J.
D. Martin, WNP-2
P. L. Powell,
WNP-2
R.
B. Glasscock,
MNP-2
N. S. Reynolds
State of MA
bcc:
RSB/Document Control Desk
(RIDS)
Mr. J. Martin
Resident Inspector
t
R
~~fhaVls:dh
P
on
5/ 8 ( /85
5/ 8/ /85
DKi sch
5/p) /85
ee.
r
za/g5'506240693
85053i
ADQCK 05OOO397
Q
4
)f)
'J
c
1
k
ki