ML17278A224
| ML17278A224 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/10/1985 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17278A225 | List: |
| References | |
| GL-83-28, TAC-53647, NUDOCS 8506240101 | |
| Download: ML17278A224 (6) | |
Text
BSoc R,4 c lo i SSo 4lc 1'DR AXe<LC, ogooO3>7
'PDR LIUN 3 0 f985 Docket Nos.:
50-397 ttr.
G. C. Sorensen, Manager Regulatory Programs Hashington Public Power Supply Systems Post Office Box 968 3000 George Hashington Hay Richland, Hashington 99352
Dear ter. Sorensen:
Distribution NRC PDR PRC System NSIC LB¹2 Reading.
EHynton JBradfute Paton -
OELD ACRS (16)
JPartlow BGrimes EJordan ABournia
Subject:
HNP-2 Generic Letter 83-28, Item 1.2, Post-Trip Review
( Data and Information Capa)ility)
The staff has completed its review of the Post-Trip Review-Data and Information Capability for HNP 2.
The staff finds that the Post-Trip Review-Data and Information Capability for HNP 2 are acceptable.
This completes the staff's action for Item 1.2 of'eneric Letter 83-2&
and closes the Post Trip Review-Data and Information Capability issue for HNP-2.
A copy of the related Safety Evaluation is enclosed.
Sincerely,
Enclosure:
As stated Halter R. Butler, Chief Licensing Branch No.
2 Division of Licensing cc:
See next page OFFICE/
SURNAME)
DATEP SL JB.rgd fu.te.:mg 06/6 /85
~ ~ ~ ~ l ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
.LB¹ZgnL/BC....
....P.v.t).er........
06//II/85
~ ~ ~ ~ ~ ~ 1 HC
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ o N(ek/ Nl ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Qu/iKlCL ~ ~
~
~ ~
6/Ikoo/85 0 ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ro ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o NRC FORM 3I8 IIOIBOINRCM 0240 OFFIClAL RECORD COPY
- UN. QPO 1983~00-247
7
~ ~,
rs
'I I ~ll b
t 1'
I l
'8 REqy (4
~~i 0
'W**y4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUN f 0 1985 Docket Nos.:
50-397 h
Mr. G. C. Sorensen, Manager Regul atory Programs Washington Public Power Supply Systems Post Office Box 968 3000 George Washington Way
- Richland, Washington 99352
Dear Mr. Sorensen:
Subject:
WNP-2 Generic Letter 83-28, Item 1.2, Post-Trip Review (Data and Information Capability)
The staff has completed its review of the Post-Trip Review-Data and Information Capability for WNP 2.
The staff finds that the Post-Trip Review-Data and Information Capab'i"lay for WNP 2 are acceptable.
~
This completes the staff's action for Item 1.2 of Generic Letter 83-28 and closes the Post Trip Review-Data and I'nformation Capability issue for WNP-2.
A copy of the related Safety Evaluation i's enclosed.
Sincerely,
Enclosure:
As stated Palter R. Rut er, Chief Licensing ErancIi'No.
2 Division of Licensing cc:
See next page
y
Mr. G. C. Sorensen, Manager Washington Public Power Supply System cc:
Nicholas Reynolds, Esquire
- Bishop, Cook, Liberman, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.
W.
Washington, D. C.
20036 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Hail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0. Box 968
- Richland, Washington 99352 WPPSS Nuclear Project No.
2 (WNP-2)
Mr. John B. Martin U.S.
NRC, Region V
1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. W.-G. Conn, SR.
N/M Group Supervisor, Burns and
- Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 650
- Richland, Washington 99352 H. J.
D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968 Richland, Washington 99352
~
~
I II
\\'
'