Forwards SAIC-85/1517-4, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-23,Item 1.2, `Post-Trip Review:Data & Info Capabilities for Washington Nuclear Project 2. Three Concerns Clarified
ML17277B780
Person / Time
Site: Columbia 
Issue date: 05/22/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17277B781 List:
References
GL-83-23, TAC-53647, NUDOCS 8506060581
Download: ML17277B780 (8)


Text

0 ~

Docket No.:

50-397

~ ~

MAY 2

'85 850606058'50522 PDR ADOCK 05000397 P

PDR I

Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems Post Office Box 968 3000 George Washington

'Way Richland, Washington 99352

Dear Mr. Sorensen:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER)

FOR SALEM ATWS ITEM 1.2 (GENERIC LETTER 83-28)

Re:

(WNP-2)

The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.

For WNP-2, your response'as found to be incomplete in three of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgment of the areas evaluated.

Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.

As a result of a telephone conference on May 16, 1985 with members of your staff, all three areas were clarified and no additional information is required.

A final SER is now in preparation Sincerely, (sr ltalter R. Butler, Chief Licensing Branch No.

2 Division of Licensing

Enclosure:

DRAFT TER on Salem ATWS Item 1.2 cc w/enclosure:

See next page DISTRIBUTION PRC System LB82 Reading ACRS (16)

EJordan NRC PDR NSIC EHylton JPartl ow ABournia Local PDR LBb2 Reading OELD BGrimes LB~L LB8 JBrQ fute:dh E

n 05/Zl /85 0 /

/85 LB82/DL WRButler 05/Z~ /85

~ ~

~ a Ii

Docket No.:

50-397

~ 0 MAY 2 2 l985 Hr. G. C. Sorerseni, tlanager Regul atory Programs Washinigton Public Power Supply Systems Post Office Box 968 3000 George Washington Way Richland, Washington 99352

Dear tlr. Sorensen:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER)

FOR SALEM ATWS ITEl~i 1 2

(GENERIC LETTER 83-28)

Re:

(WNP-2)

The staff'as completed a preliminary review to assess the completeness arid adequacy of licensee responses to Generic Letter 83-28 Item 1.2.

For WNP-P, your response was found to be incomplete in three of the areas evaluated.

The enclosed TEP, provides a technical evaluation representing the staff's initial judgment cf ti e areas evaluated.

Pen and ink changes have been made to the TER by your pro"'ect manager to make the wording consistent with our approach.

As a result of a telephone conference on flay 16, 1985 with members of your staff, all three areas were clarified and no additional information is required.

A final SER is now in preparation Sincerely, (s(

Walter R. Butler, Chief 1 icensing Branch No.

2 Division of Licensing

Enclosure:

DRAFT TER on Salem ATWS Item 1.2 cc w/enclosure:

See next page DISTRIBUTION Docl et Fi e

PRC System LBA2 Reading ACRS (16)

EJordan NRC PDR NSIC EHylton JPartlow ABournia Local PDR LB82 Reading OELD BGrimes LB~L LBi2/ 6 JBrQ'fute: dh Etl+

n 05/g( /85 OE/" /85 LB82/DL WRButler 05/g( /85

~ ~

I

~ps Repp, c" 'pp Cy 0p o~

~O

++**+

Docket No.:

50-397

~ 0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 205SS MAY 2 2 lgx~

Nr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems Post Office Box 968 3000 George Washington Way Richland, Washington 99352

Dear tlr. Sorensen:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER)

FOR SALEhl ATWS ITEhl 1.2 (GENERIC LETTER 83-28)

Re:

(WNP-2)

The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2.

For WNF-2, your response was found to be incomplete in three of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff 's initial judgment of the areas evaluated.

Pen and ink changes have been made to the TER by your project manager to make the wording consistent with our approach.

As a result of a telephone conference on Ilay 16, 1985 with members of your staff, all three areas were clarified and no additional information is required.

A final SER is now in preparation S iIIcerely,

Enclosure:

DRAFT TER on Salem ATWS Item 1.2 Walter R. Butler, Chief Licensing Branch No.

2 Division of Licensing cc w/enclosure:

See next page

~ ~

I.

l, b

N C

P f-

lir. G.

C. Sorensen, l~ianager Washington Public Power Supply System cc:

fiicholas Reynolds, Esquire

Bishop, Cook, Liberman, Purcell 8 Reynolds 1200 Seventeenth
Street, N.

W.

Washington, D.

C.

20036 Nr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99532 tiicholas Lewis, Chairman Energy Facility Site Evaluation Council fiail Stop PY-11 Olympia, Washington 98504 P. L. Powell, Licensing ffanager lfashington Public Power Supply System P. 0. Box 968
Richland, Washington 99352 WPPSS tfucleal Project No.

2 (fNP-2)

Nr. John B. Hartin U.S.

NRC, Region V

1450 flaria Lane, Suite 210 Walnut Creek, California 94596 I',r.

W.

G. Conn, SR.

H/N Group Supervisor Burns ana Roe, Incorporated 601 Williams Bov,'.evard

Richland, Washington 99352 P,.

B. Glasscock, Director Licensing and Assurance Washington Public Powe~

Supply System P. 0.

Box 96e, ND.650 f:ichland, Washington 99352 li. u.

D. Nartin Wt!P-2 Plant tfanager Washington Public Power Supply System P. 0.

Box 964 Richland, Washington 99352

~ ~