ML17277B731

From kanterella
Jump to navigation Jump to search
Discusses Instrument Setpoint Methodology Program Used in Determining Trip Setpoints.Methodology Consistent W/Intent of Rev 1 to Reg Guide 1.105 & Proper for Instrumentation Design & Vintage.Procedures Encl
ML17277B731
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277B732 List:
References
RTR-REGGD-01.105, RTR-REGGD-1.105 GO2-85-238, TAC-55579, NUDOCS 8505140463
Download: ML17277B731 (6)


Text

REGUL INFORMATION DISTRIBUT STEM (RIDS)

ACCESSION WBR,850510006$ DOC ~ DATE! 85/05/06 NOTARIZED: NO DOCKET F<CIL:50 3%7 WPPSS Nuclear Project~ Unit 2i Washington Public Powe 05000397 AUTH, NAME AUTHOR 'FFILIATION SORENSENiG.C, Washington Public Power Supply -System RECIP,NAME RECIPIENT AFFILIATION SCHWENCER A. Licensing Branch 2

SUBJECT:

Discusses instrument setpoint methodology program used in determining trip setpoints,Methodology consistent w/intent oi'ev 1 to Reg Guide 1 '05 L proper for instrumentation design 8 vintage ~ Procedures CODE: A001D COPIES RECEIVED:LTR ENCL g SIZE!

encl'ISTRIBUTION TITLE: OR Submittal: Gener a'l Distribution NOTES: 05000397 OL!12/20/83 RECIPIENT COPIES RECIPIENT -COPIES ID CODE/NAME', LTTR ENCL ID CODE/NAME LTTR ENCL NRA LB2 BC 01 "7 7 INTERNAL: ACRS ELD/HDS2 NRA/DL DIR 09 6 1

1 6

0 ADM/LFMB NRR/DE/MTEB NRR/DL/DRAB 1,1 1

1 0

0 NRR/DL/TSRG 1 S METB 1 1 NRR/DS I/RAB 1 1 REG ILE 00 1 1 RGN5 1 1 EXTERNAL: EGSG BRUSKE S 1 1 LPDR 03 1 1 NRC PDR: 02" 1 1 NSIC 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 24

(c,, ) ill . I I I ~0 t I ~xi ')~t g r)g q ll,,II 4 <.~ ~I.i :y r I ~

r<<, <<.1 ~ <~r~" ~ >4 I r<~ ll 0) ~f II ~ N If i A

t itI g>> VI < 'ic>> 'lb < I, ~>'IIC Ii r>> a+I li 0 Ij'I I 'I I ~ I .<I<<t~~<'f } frl<o'-rf<c,fl1l() 'i '1Je+tilr 9" 1w 0 ~

j Ii fcl~>fi~fp(l(i) g, ()IOltwI)r< f 11" ~Qf trot)'f9~~ cI) )f g)i 'rgl~I rIIA c f 4 f 0'> III'4 I e'6 r 'le% 'li )'(9'f' P r I' l 94 t u I r'Ivf< rf f f v9 <

~ I ~f3 l wssy~gl) IIlgry 1'k o Or',Q f p ( Q,,l fk$ r e T J; <,'g J l...".l g gg'iver",p (I JI)kith Il(ki, ), i. I lI

<<:~ II I I oor0r,rlr'~ f~~rrI I>>argno~II: Ir,$ 4 r ~,u~>>

5 ' lytl<,r~g f lflll

~ 'li>.-,%'> I, J(>

Tr, T' 'I'~I a,r'

)i T 'f,I I') I >II T~ It(),J

- I'y>,

c ~ 1<>p'l Cll X 5 I g / y i l 'ac~rlr i%i>> J

'l l"" I~X>>~

l 4 <<>>>I V X.s(il X ~l >l w'~

4>> r 1 t,JQXW;'III f .) Ikh rl i % 1P <> g >li,'

ti' IFIli l

] / iigl)J g/~i pw  ;.Io re J + I

'I' g

eo Washington Public Power Supply System 3000 George Washington Way P.O. Box 988 Richland, Washington 993524988 (509)372-5000 May 6, 1985 G02-85-238 Docket No. 50-3/7 Director of Nuclear Reactor Regulation Mr. A. Schwencer Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

NUCLEAR PLANT NO. 2 SETPOINT METHODOLOGY FOR WNP-2

Reference:

1) Letter, A. Schwencer (NRC} to G.C. Sorenson (Supply System),

"Instrument Setpoint Methodology for WNP-2" The purpose of this letter is to provide the NRC staff,(as requested in Reference 1) a detailed discussion of the Instrument Setpoint Methodology Program utilized in determining trip setpoints for instrumentation listed in the WNP-2 Technical Specifications.

As discussed in FSAR section C.3 page C.3-91, Regulatory Guide 1.105 revision 1 does not apply to WNP-2; however, WNP-2 voluntarily utilized this Guide in formulation of a setpoint methodology program.

Since the majority of the instrumentation listed in the WNP-2 Technical Specification was provided as part of the General Electric design scope, the methodology utilized for this instrumentation was prepared and implemented as described within the attached General Electric documents, 22A5261 and 23A1900AA.

The same basic methodology has been utilized in the determination of trip setpoints for balance-of-plant (BOP) instrumentation listed in Technical Specifications. The differences being: 1) the BOP designer numerically summed or took the square root of the sum of squares for combined instru-ment loop inaccuracies and, .2) when no data concerning drift was available for a particular instrument, a standard 1% drift was assigned. Specific instrument operating history data will be periodically reviewed to adjust drift allowances as necessary.

8505140+ 85050b AQOCK 05pppg97 0

PDR PDR P

Ct a

y~

A. Schwencer Page Two SETPOINT METHODOLOGY FOR WNP-2 Exhibit I (attached) shows the relationships and analytical content of the margins between assigned trip setpoint, allowable value, and analytical limit used within the WNP-2 setpoint methodology. It should be noted that allowance for "calibration error" has not been included. The reason for this is that the i nstrumentation assigned for WNP-2 calibration surveillance, in general, is a factor of four more accurate than the instrumentation being cali-brated. This is characteristic of the tr ip logic instrumentation provided within the WNP-2 design, i.e., the majority of the trip instrumentation is not electronic in nature but mechanical switches attached directly to the process. This design eliminates the concerns the NRC has with the methodology applied by General Electric for those plant members of the Instrumentation Setpoint Methodology Group which have instrument loops containing electronic transmitters and trip units.

Exhibits II, III, and IV (attached) show a typical setpoint data sheet, instr uc-tions, and definitions provided for a BOP Technical Specification instrument.

These exhibits detail the methodology for determination of analytical limits, allowable values, and trip setpoints which account for instrument drift and inaccuracy.

WNP-2 is in the process of reviewing Technical Specification instrument set-points to assure consistency and proper application of the methodology described.

We believe that the methodology described above is consistent with the intent of Regulatory Guide 1.105 revision 1, and proper for the type of instrumentation design provided and the vintage of the facility.

If you have any questions concerning the above please call P.L. Powell at (509) 377-2501 on extension 2298.

G.C. Sorensen Manager, Regulatory Programs GWB:bap Attachments: As Stated cc: JO Bradfute - NRC JB Hartin - NRC RV WS Chin BPA E Revell - BPA AD Toth NRC Site

~0 l

1 r