Proposed Tech Specs Re intermediate-range Noble Gas Activity Monitor,Lpci Sys Injection Permissive,Containment Isolation for Fluid Sys & Diesel Engine Warmup Period
ML17277B283
Person / Time
Site: Columbia 
Issue date: 01/20/1984
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277B280 List:
References
NUDOCS 8401310028
Download: ML17277B283 (18)


Text

TABLE 4. 3. 7. 12-1 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREHENTS INSTRUMENT C1IANNEL SOURCE CNECK CflECK C1IANNEL CALIBRATION CHANNEL MODES IN MNICH FUNCTIONAL SURVEILLANCE TEST Hain Condenser Offgas Post-Treatment Radiation Monitor a.

Gross gamma detector alarm and 0

automatic isolation of the offgas system outlet and drain valves 2.

Hain Condenser Offgas Pre-Treatment Radiation Honitor a.

Gamma sensit.ive ion chamber located 0

H upstream of holdup line 3.

Hain Plant Release Monitor R(2)

R(2)

Q(i)

Q(I)

C.

d.

Noble Gas Activity Honi tor 1)

Low Range 2)

Intermediate Range Iodine Sampler Particulate Sampler Effluent System Flow Rate Monitor Sampler Flow Rate Monitor H

R(2)

H R(2)

N. A.

N. A.

N. A.

N. A.

N.A.

R N.A.

R Q(l)

Qe+ l N. A.

N. A.

Q Q

4.

Turbine Building Ventilation Exhaust 11oni tor C.

Noble Gas Activity 11onitop 1)

Low Range 2)

Intermediate Range Iodine Sampler Particulate Sampler Effluent System Flow Rate Monitor Sampler Flow Rate Monitor

.l

~

<<:l 0

0 D

0 H

H N. A.

N. A.

N. A.

R(2)

R(2)

N.A.

N. A.

Q(I)~7 N. A.

N.A.

Q

~ p

't 1,

I h

l C

TABLE 4.3.7. 12-1 (Continued)

RADIOACTIVE GASEOUS EFI'lUENT MONITORING INSTRUMENTATION SURVEILLANCE.RE UIREMENTS IHSTRUflENT 5.

Radwaste Building Ventilation Exhaust CHANNEL SOURCE CHECK CIIECK CHANNEL MODES IH WHICH CHANNEL FUNCTIONAL SURVEILLANCE CALIBRATION TEST a.

Hob 1 e Gas Activity Monitor 1)

Low Range 2)

Intermediate Range b.

Iodine Sampler c.

Particulal.e Sampler d.

Effluent System Flow Rate Measurement Device e.

Sampler Flow Rate Monitor 6.

t'lain Condenser Offgas Treatment System Explosive Gas Monitoring System a.

Hydrogen Monitor 0(4)

N. A.

N. A.

R(2)

R(2)

N.A.

N.A.

R(6) 0(3)

C(1)

QH+ 7 N.A.

<(5)

I

~ ~

5 I

C ~

TABLE 4.3.7. 12-1 (Continued)

TABLE NOTATIONS "At all times.

""During main condenser offgas treatment system operation.

I (1)

The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:

a.

Instrument indicates measured levels above the alarm setpoint.

b.

Circuit failure.

c.

Instrument controls not set in operate mode.

(2)

The initial CHANNEL CALIBRATION shall be performed using one or more reference radioactive standards traceable to the National Bureau of Standards (NBS) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS.

These standards shall permit calibrating the system over its intended range of energy and measurement range.

Subsequent CHANNEL CALIBRATION shall be performed using the initial radioactive standards or other standards of equivalent quality or radioactive sources that have been related to the initial calibration.

(3)

The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:

a.

0. 0 volume percent
hydrogen, balance nitrogen, and b.
2. 0 volume percent
hydrogen, balance. nitrogen.

(4)

The CHANNEL CHECK shall be performed by comparing computer readings or comparing each fan's local amperage reading.

(5)

The CHANNEL FUNCTIONAL TEST shall be performed by measurement of the phase currents for each fan.

(6)

The CHANNEL CALIBRATION shall be performed by using a flow measurement device to determine the fan current to flow relationship.

g q g g g Q g pgg<TXOQ A'L $fS$

gg 4L(

)gg<h4clsrc 4 lJ

<-,,.L

..;4:

s....k,.a

+a~

ruo e

ggs ac iva-)

4 it.oui I failures oi jets)ruee feei.0-.4 usLci set a

p 05sl id'

~04l&CC.

<OA)Kl P+OW1 AI4l4'N AQ N INC <4T'lb' WASHINGTON NUCLEAR " UNIT 2 3/4 3"95

REACTOR COOLANT SYSTEM SURVEILLANCE RE UIREMENTS 4.4.3.2.j.

The reactor coolant system leakage shall be demonstrated to be within each of the above limits by:

a.

Monitoring the primary containment atmospheric particulate and gaseous radioactivity at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.

Monitoring the primary containment sump flow rate at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, c,

Monitoring the reactor vessel head flange leak detection system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.4.3.2.2 Each reactor coolant system pressure isolation valve specified in Table 3.4.3.2-1 shall be demonstrated OPERABLE by leak testing pursuant to Specification 4.0.5 and verifying the leakage of each valve to be within the" specified limit:

a.

At least once per 18 months.

b.

Prior to entering HOT SHUTDOWN whenever the plant has been in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more and if leakage testing has not been performed in the previous 9 months.

Prior to returning the valve to service following maintenance, repair or replacement work on the valve which could affect its leakage rate.

d.

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow throu h the valve The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 3.

4.4.3.2.3 The high/low pr essure interface valve leakage pressure monitors shall be demonstrated OPERABLE with alarm setpoints per Table 3.4

~ 3.2-2 by performance of a:

a.

CHANNEL FUNCTIONAL TEST at least once per 31 days, and b.

CHANNEL CALIBRATION at least once per 18 months.

WASHINGTON NUCLEAR - UNIT 2 3/4 4-10

Gl CD VALVE FUNCTION AND NUMBER TABLE, 3. 6. 3-1 Continued)

PRIMARY CONTAINMENT ISOLATION VALVES VALVE GROUP(a)

MAXIMUM ISOLATION TIME (Seconds a.

Automatic Isolation Valves (Continued)

Equipment Drain (Radioactive)

EDR-V-19 EDR-V-20 Floor Drain (Radioactive)

FDR-V-3 FDR-V-4 Fuel Pool Cooling/Suppression Pool Cleanup FPC-V-153(f)

FPC-V-154( f)

FPC-V-156 15 15 35 Reactor Recirculation Hydraulic Control(e)

HY-V-17A,B HY-V-lBA,8 HY-V-19A,B HY-V-20A,B HY-V-33A,B HY-V-34A,B HY-V-35A,B HY-V-36A,B Traversing Incore Probe Valve TIP-V-6,7,8,9,10 (Probe Line Ball Valves)

I TIP-V-11 (N Gate Valve) 2

~

'*e

?(

?g

)yl

~,

I, l

I 0

A Ij C

I

?,

TABLE 3.6.3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES VALVE FUNCTION ANO NUMBER VALVE GROUP(a) d.

Other Containment Isolation Valves (Continued)

Containment Purge System CSP-V-8 CSP-V-9 CSP-V-10 Reactor Reci rculati on (Seal In jec tion)

RRC-V-13A, 8 RRC-V-16A, B Containment Instrument Air CIA-V-20 CIA-V-21 CIA-V-30A,B CIA-V-31A,B Containment Air Supply CAS-V-453 Post-Accident Sampling System(c)

P SR-V-X73-1 PSR-V-X73-2 PSR-V-X77A1 PSR-Y-X77A2 PSR-V-X77A3 PSR-V-X77A4 PSR-V-XBO-1 MAXIMUM ISOLATION TIHE (Seconds)

N. A.

N.A.

22 N. A.

22 N.A.

N.A.

~V t

3; r,'

II l"

J4 f,

4t

~ ~

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE UIREMENTS 4.8. 1. 1. 1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be:

a.

Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and b.

Demonstrated OPERABLE at least once per 18 months during shutdown by transferring, manually and automatically, unit power supply from the normal circuit to the alternate cir cuit.

4.8. l. 1.2 Each of the above required diesel generators shall be demonstrated OPERABLE:

a.

In accordance with the frequency specified in Table 4'. 1. 1.2-1 on a

STAGGERED TEST BASIS by:

1.

Verifying the fuel level in the day fuel tank.

2.

Verifying the fuel level in the fuel storage tank.

3.

Verifying the fuel transfer pump starts and transfers fuel from the storage system to the day fuel tank.

4.

Verifying the diesel starts from ambient condition and accelerates to at least 900 rpm (60 Hz) in less than or equal to 10 seconds* for DG-1 and DG-2 and 13 seconds" for DG-3.

The generator voltage and frequency shall be 4160

+ 420 volts and 60 + 3.0 Hz within 10 seconds" for DG-l and DG-2 and 13 seconds" for DG-3 after the start signal.

The diesel generator shall be started for this test by using one of the following signals:

a)

Manual.

b)

Simulated loss-of-offsite power by itself.

c)

Simulated loss-of-offsite power in conjunction with an ESF actuation test signal.

d)

An ESF actuation test signal by itself.

5.

Verifying the diesel generator is synchronized, loaded to greater than or equal to 4400 kW for DG-1 and DG-2 and 2600 kW for DG-3 in less than or equal to 60 seconds",

and operates with these loads for at least 60 minutest 6.

Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.

7.

Verifying the pressure in all diesel generator air start receivers to be greater than or equal to 230 psig for DG-1 and DG-2 and 200 psig for DG-3.

b.

At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by checking for and removing accumulated water from the day fuel tanks.

"These diesel generator starts from ambient. conditions shall be performed only once per 184 days in these surveillance tests and all other engine starts for the purpose of this surveillance testing ~~ be preceded by an engine prelube period and/or other warmup procedures so that mechanical stress and wear on the die WASHINGTON NUCLEAR - UNIT 2 3/4 8-3 recommended by the manufacturer el engine is minimized.

~ ~

V

ELECTRICAL POWER SYSTEMS DISTRIBUTION "

SHUTDOWN LIMITING CONDITION FOR OPERATION

3. 8. 3. 2 As a minimum, the following power distribution system divisions shall be energized:

a.

For A.C.

power distribution, Division 1 or Division 2, and when the HPCS system is required to be OPERABLE, Division 3, with:

Division 1, consisting of:

a) 4160-volt bus SM-7.

b) 480-volt bus SL"71 and SL-73.

c) 480-volt MCC's 7A, 7A-A, 7B, 7B-A, 7B-B, 7F.')

480-volt Power Panel PP-7A-B.

e) 120/208-volt 38 Power Panels PP-7A-G, PP-7A-A-A.

f) 120/240-volt 18 Power Panels PP-7A-A, PP-7A-F, PP-7A-E, and PP"7A.

Division 2, consisting of:

a) 4160-volt bus SM-B.

b) 480-volt bus SL-81 and SL-83.

c) 480-volt MCC's BA, BA-A, BB, BB-A, 88-8, BF.

d) 480-volt Power Panel PP-8A-B.

e) 120/208-volt 3g Power Panels PP-BA-G, PP-BA-A-A.

f) 120/240-volt 18 Power Panels PP-BA-A, PP-BA-F, PP"BA-E, and PP"BA.

b.

3.

Division 3, consisting of:

a) 4160-volt bus SM-4.

b) 480-volt 38 Engine 8

Gen.

Aux. loads Power Panel.

c) 120/240-volt 18 Power Panel PP-4A.

d) 480-volt 38 MCC 4A.

For D.C.

power distribution, Division 1 or Division 2, and when the HPCS system is required to be OPERABLE, Division 3, with:

l.

Division 1, consisting of:

a) 125-volt D.C.

Main Distribution Panel Sl-l.

b) 125-volt VDC Motor Control Center MC-Sl-lD.

c) 125-VDC Instr.

and Control NSSS Bd. Distr. Panel QP-S1-1A.

e) 125-VOC Diesel Gen.

1 Dist. Pnl.

DP-S1-1E.

f) 250-VOC Main Distribution Panel S2-1.

g) 250-VOC Motor Control Center MC-S2-1A, Part A and Part B.

h)

+24-VDC Power Panel OP"SO-A.

vDc cr'l.>c~l sec a, bi+i; TAL bT-si '

F 2.

0~vision 2, consisting of:

a) 125-volt D.C. Main Distribution Panel 51-2.

b) 125-volt VDC Motor Control Center MC-S1-2D.

c) 125-VDC Instr.

and Control NSSS Distr.

Panel DP-S1-2A.

d) 125-VDC Critical Swgs.

8 Remote Shutdn. Distr. Pnl.

DP-S1-20.

e) 125-VDC Diesel Gen.

2 Dist. Pnl.

DP-S1-2E.

f)

+24-VOC Power Panel OP"SO-B.

3.

Division 3, consisting of 125-volt O.C.

HPCS distribution panel.

WASHINGTON NUCLEAR - UNIT 2 3/4 8-18

2 r

~

~

REFUELING OPERATIONS 3/4. 9. 2 INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 At least 2 source range monitor" (SRM) channels shall be OPERABLE and inserted to the normal operating level with:

ntin ops vis B in 'tio ~9 tr 1 ro

.A <dr i~

, =At eas n th co tr r

om One of the required SRM detectors located in the quadrant where CORE ALTERATIONS are being performed and the other required SRM detector located in an adjacent

quadrant, and The "shorting links" removed from the RPS ciycuitry prior to and during the time any control rod is withdrawn and shutdown margin demonstrations are in progress.

APPLICABILITY:

OPERATIONAL CONDITION 5.

ACTION:

Mith the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS"" and insert all insertable control rods.

SURVEILLANCE REQUIREMENTS 4.9.2 Each of the above required SRM channels shall be demonstrated OPERABLE by:

a.

At least once per 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s:

1.

Performance of a CHANNEL CHECK, 2.

Verifying the detectors are inserted to the normal operating

level, and 3.

During CORE ALTERATIONS, verifying that the detector of an OPERABLE SRM channel is located in the core quadrant where CORE ALTERATIONS are being performed and another is located in an adjacent quadrant.

"The use of special movable detectors during CORE ALTERATIONS in place of the normal SRM nuclear detectors is permissible as long as these special detectors are connected to the normal SRM circuits.

"~Except movement of IRI'I, SRM or special movable detectors.

Not required for con-rol rods removed per Specification 3.9. 10. 1 and 3.9. 10.2.

ThTASHINGTON NUCLEAR - UNiT 2 3/4 9-3

I P

W7

ADMINISTRATIVE CONTROLS 6.2.3 NUCLEAR SAFETY ASSURANCE GROUP NSAG FUNCTION 6.2.3. 1 The NSAG shall function to examine unit operating characteristics, NRC issuances, industry advisories, Licensee Event Reports, and other sources of unit design and operatirig experience information, including units of similar

design, which may indicate areas for improving unit safety.

The NSAG shall make detailed recommendations for revised procedures, equipment and modifications, maintenance activities, operations activities, or other means of improving unit safety to the Director of Licensing and,Assurance.

COMPOSITION 6.2.3.2 The NSAG shall be composed of at least five, dedicated, full-time engineers, a minimum of three located on site and two at the home office.

Each shall have a bachelor's degree, in engineering or related science'nd at least 2 years professional level experience in his field, at least 1 year of which experience shall be in the nuclear field.

or ~~~

i~'ops n ee+i~g W~a& Weoi~i'o~>

a td H~ch

~~, "/~~/

RESPONSIBILITIES 4p qr +.g 0<'+ep&a,lent, as dd cr i'6<pl /n pc~'fe On +/

6.2.3.3 The NSAG shall be responsible for maintaining surveillance of unit activities to provide independent verification" that these activities are performed correctly and that human errors are reduced as much as practical.

RECORDS 6.2.3,4 Records of activities performed by the NSAG shall be prepared, main-

tained, and forwarded each calendar month to the Director of Licensing and Assurance.
6. 2. 4 SHIFT TECHNICAL ADVISOR 6.2.4. 1 The Shift Technical Advisor shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit.

The Shift Technical Advisor shall have a bachelor's degree or equivalent in a scientific or engineering. discipline and shall have received specific training in the response and analysis of the unit for transients and accidents, and in unit design and layout, including the capabilities of instrumentation and controls in the control room.

6. 3 UNIT STAFF UALIFICATIONS 6.3. 1 Each member of the unit staff shall meet or exceed the minimum qualifica-tions of ANSI/ANS N18.1-1971 for comparable positions, except for the Health Physics/

Chemistry Manager who shall meet or exceed the qualifications of Regulatory Guide

1. 8, Revision 1-R, May 1977.

The licensed Operators and Senior Operators shall also meet or exceed the minimum qualifications of the supplemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees.

  • Not responsible for sign-off function.

MASHINGTON NUCLEAR " UNIT 2 6-7

I' I'

~

i

'l 1

~ 4I