ML17276A138
| ML17276A138 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/23/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8110280201 | |
| Download: ML17276A138 (2) | |
See also: IR 05000397/1981003
Text
gap,@@+FR.
007 33
~gg~
Docket No. 50-397
Washington Public Power Supply System
P.
O. Box 968
f000 George Washington
Way
Richland, Washington
99352
Attention:
Mr. R.
G. Matlock
Program Director, WNP-2 Pro)ect
Gentlemen:
OCT2 7 1981~ =
EgeASS
Thank you for your letter dated
September
4, 1981, informing
us of the steps
you have taken to correct items which we
brought to your attention in our letter dated
May 7, 1981.
Your corrective actions'ill be verified during a future
inspection.
Your cooperation with us is appreciated..
Sincerely,
B. H. Faulkenberry,
Chief
Reactor Construction
Pro)ects
Branch
bce:
Document Control Desk
(RIDS)
Distributed by RV:
State of WA (Lewis), Resident
~gn(
Si)
OFFICE/
SURNAME/
DATE)
RV ~q
Elan/cb
10/ >+/81
RV
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Dodds
8ii028020f
8ii0297'0!ZZ/81
',>>
~ ~ ~
M
~ ~ ~ ~ ~ ~ ~ ~ 0
Q
~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318 110/80) NRCM 0240
OFFICIAL RECOFiD COPY
- USGPO: 1980~29 824
4
C
~ w
IH,
r
3