Forwards IE Insp Rept 50-397/81-02 on 810127-30.No Noncompliance Noted
ML17275A919
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/20/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17275A920 List:
References
NUDOCS 8103250001
Download: ML17275A919 (4)


See also: IR 05000397/1981002

Text

~pQ RE0y

e

/p 0p*g0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CAI.IFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

'EB 2 0 1981

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

Attention:

R.

G. Matlock

Program Director,

WNP-2 Project

Gentlemen:

I

Subject:

NRC Inspection of Washington Nuclear Project

No.

2

U 3. IIUCLEAR RBRNATOgg

p

COAlhllS$ON

This refers to the inspection

conducted

by Messrs.

D.

P. Haist,

W.- J.

Wagner

and J.

F. Burdoin of this office on January

27-30,

1981 of activities

authorized

by NRC Construction Permit No. CPPR-93,

and to the discussion

of our findings with Mr. W.

G. Keltner and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room. If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

4'

It

'"J,

'1

4

It

t "4

< ~ <<,

~ 't

e

Washington Public Power Supply System

-2-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

No. 50-397/81-02

Pp&

Reactor

Construction

and

Engineering

Support Branch

cc w/o enclosure:

M. E. Witherspoon, guality Assurance Director

W.

C. Bibb, Project Manager

WNP-2 Project