REGULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR:8103100416 DOC DATE: 81/03/05 NOTARIZED'O DOCKET' FACIL':50 397 NPPSS Nuclear Projecti Unit 2i Nashington Public Powe 05000397 AUTH NAME AUTHOR AFFILIATION MATLOCK,R,G, Nashington Public Power Supply System REC IP ~ NAb1E RECIPIENT AFF IL'IATION ENGELKENgR ~ HE Region 5P San Francisco'ffice of the Director SUBJECT; Interim deficiency rept re leakage from ultimate heat" sink spray pond APinitially reported 810209.Addi data will be obtained to verify leakage rate, Spray pond A will then be" drained L inspected for leakage path.
DISTRIBUTION CODE:
B019S COPIES RECEIVED:LTR
'NCL I, 'IZE::
'ITLE:
Construction Deficiency Report (10CFR50B55E)
NOTES:PM:
2 copies of all material.
05000397 RECIPIENT ID CODE/NAME ACTION; A/D LICENSNG 04 RUSHBROOKiM ~
06 t
INTERNAL: AD/RCI/IE 17 D/DIR HUM FAC15 EQUIP QUAL BR11 IS,E 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDgN ~ IE COPIES LTTR ENCL.
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME YOUNGBLOODgB 05 LYNCHiD~
07 ASLBP/J ~ HARD EDO 8
STAFF
.19 HYD/GEO BR 22 LIC QUAL'R 12" NRC PDR 02
'ROC/TST-REV 13 01 STANDRDS DEV 21
, COPIES LTTR ENCL 1
1 1
1
~
1 1
1 1
1
'1
,.1 1
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 16 08 16 16 1
1 LPDR 03 1
1 MAR 1'3 ~N
/e I'f0 TOTAL NURSER OF COPIES REQUIRED:
LTTR PI ENCL
II
'I EI g
I P i a
(
~
~%
~8
~e 1
N I
'll I
Washington Public Power Supply System A JOINT OPERATING AGENCY March 5, 1981 G02-81-51 DOCKET NO. 50-397, CPPR-93 Nuclear Regulatory Commission Region V
Suite 202, Halnut Creek Plaza 1990 North California Blvd.
Halnut Creek, CA 94596 i,~hR 0 9 198 u,S,~~T 3
ggg55N.,i/
aa Attention:
Mr. R.
H. Engelken, Director Gentlemen:
Subject:
HPPSS NUCLEAR PROJECT NO.
2 POTENTIALLY REPORTABLE DEFICIENCY - 10CFR50.55(e)
SPRAY POND A LEAKAGE In accordance with the guidelines established for the reporting of 10CFR50.55(e) conditions, your staff was inf'ormed by telephone on February 9, 1981, of a "Potentially Reportable" condition regarding leakage from Ultimate Heat Sink Spray Pond A.
Attached is our Interim Report describing the deficiency and our approach to the resolution.
A final report will be submi tted when our evaluation is completed.
Very truly yours, pp4vz~
R.
G.
MATLOCK P.O. BOX 958 3000 GEO. WASHINGTONWAY RICHLANO,WASHINGTON 99352 PHONE {509) 372 5000 RGM:PEP:cd
Attachment:
Interim Report cc: w/att HS Chin BPA ND Lewis - EFSEC, Olympia RE Snaith - B8R NY V. Stello -
NRC AD Toth -
NRC Resident Inspector JJ Verderber - B8R NY B.
Hood -
NUS Corporation HNP-2 Files Program Director, HNP-2
$ 0/1 5
Sx oaxoof/g'
I
~
II~ 5',
I
Interim Re ort POTENTIALLY REPORTABLE CONDITION MPPSS NUCLEAR PROJECT NO.
2 SPRAY POND A LEAKAGE WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 LICENSE NO.
CPPR-93 Potential Problem and Reference Notification In early January, 1981, Ultimate Heat Sink Spray Pond A was filled with water.
After a few days, it was observed that the water level had dropped.
Mater level and evaporation data were then taken to determine if a leak existed.
A leakage of approximately 65 gpm was identified.
Notification of a potentially reportable condi tion was made on February 9, 1981, per the cover letter.
A roach to Resolution Additional data will be obtained to verify the leakage rate.
Spray Pond A will then be drained and inspected for the leakage'ath.
Once the leakage path is identified, an appropriate solution will be determined.
Spray Pond B will be investigated at the same time to determine if a similar situation exists.
Status of Pro osed Resolution Spray Pond B has been filled.
Mater level and evaporation data are being obtained for both ponds.
Dela of the final Re ort The final report is being delayed until the leakage path has been iden-tified and an appropriate solution determined.
Projected Completion of Corrective Action and Submittal Date of Completed Re ort Any corrective action that may be identified will be initiated and the final report submitted by June 1,
1981.