ML17272A827

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. No Written Response Required
ML17272A827
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 02/08/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8002250414
Download: ML17272A827 (2)


Text

~P,g ABACI, c"

o Cy OO

~**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA

'ALNUT CREEK, CALIFORNIA94596 February 8, 1980 Docket Nos.

50-397, 50-460 50-513, 50-508, 50-509 Washington Public Power Supply P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Nr.

N. 0. Strand t<anaging Director Gentlemen:

System The enclosed IE Bulletin No. 80-04, is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

&i ~

R.

H. Engelken Director

Enclosure:

IE Bulletin No. 80-04 c c w/enclosure:

W. J. Talbot, WPPSS J.

P.

Thomas, WPPSS A. D. Kohler, WPPSS G.

C. Sorensen, WPPSS N. E. Witherspoon, WPPSS

f I

J