ML17272A825
| ML17272A825 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/21/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Rubenstein L Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17272A826 | List:
|
| References | |
| GO2-80-20, NUDOCS 8002250407 | |
| Download: ML17272A825 (85) | |
Text
REGULATORY ORMATION DISTRIBUTION SYST M
(RODS)
ACCESSION NBR: 8002250407 DOC ~ DATE ~ 80/01/21 NOTARIZED ~
NO DOCKET ¹ FACIL:50-397 NPPSS Nuclear ProJocti Unit 2~ Washington Public-Powe 05000397 AUTH INANE AUTHOR AFFILIATION RENBERGERiD ~ LE Washington Public Power Supply System RECIP,NAME 'ECIPIENT AFFILIATION RUBENSTEINE L, Light Hatet Reactors Branch
SUBJECT:
Fotwards revisions to electricalEinstrumentation 8 control drawings listed in Section 1.7 of FSAR,Section 1 '
will be updated in Amend 8 to FSAR to reflect revisions'raw'ngs available ln Genteel Pl 1 ea onlY tegg @RA~~~>> 7y oY
>+egg DISTRIBUTION CODE:
BOEOS COPIES RECEIVED tL'TR 5 ENCL Q
SIZE:
TITLE: EI 8
C Drawings
~ efweeeewee~aeÃparoweewWmmmmeeee~meae>>
eetaeeeeeaeeewmweeeeeeeeaeeeeeeWeeWeeeeeemeeaeeemm~~eeeeroeeweewwaaeeeee>>
e RECIPIENT ID CODE/NAME ACTION; 04 PM INTERNA G
04 ISE" EXTERNAL: 03 PNR SYS BR LPDR COPIES LITTR ENCL 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME 02 IEC SYS BR NRC 'PDR ACRS COPIES LT'TR ENCL 1
0 g t980 1
TOTAl NUMBER OF COPIES REQUIRED!
LTTR 8
ENCL
f 1
t It
1
~
II I
1
't
~
<< "tf<<'
~
lf 1'
p <<g I
1 I
4 *,
I X
I
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 948 3000 GCO. WASHINCrON WAV Docket No. 50-397 Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 RICHI.*NO, WASHINCTON 99352 PHONC (509) 375.5000 G02-80-20 January 21, 1980 Attention:
Mr. L. Rubenstein, Chief Branch No.
4 Division of Project Management
Subject:
WPPSS NUCLEAR PROJECT NO.
2 REVISION TO CHAPTER 1.7 DRAWINGS
Dear Mr. Rubenstein:
Enclosed with this letter please find seven (7) copies of revisions to the electrical, instrumentation and control drawings listed in section 1.7 of the FSAR as per the attached Table.
By copy of this letter, one (1) complete set of the drawings is also being forwarded to Savannah River per their request.
Section 1.7 of the FSAR will be updated in Amendment 8
to the FSAR to reflect the revisions.
Very truly yours, DLR:OKE:cph
Attachment:
- 1. Table 1.7-1 (7 copies)
- 2. Set of Drawings cc:
w/out attachments D. Lynch -
NRC R. Satterfield -
NRC J. Ellwanger - BSR JJ Verderber - B8R RC Root - B8R/Site JR Lewis - BPA ND Lewis - EFSEC, Olympia NS Reynolds - Debevoise 8 Liberman WNP-2,Files D. L.
RENBERGER Assistant Director Technology cc: w/both attachments EI DuPont De Nemours 8
Co. Inc.
Savannah River Plant Aiken, South Carolina 29801 ATTN:
WM Taylor Bldg. 703-3, Room 2
STATE "OF 'WASHINGTON)
)
ss COUNTY OF BENTON WPPSS NUCLEAR PROJECT NO.
2 REVISION TO CHAPTER 1.7 DRAWINGS D. L.
RENBERGER, Being first duly sworn, deposes and says:
That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
DATED D. L.
RENBERGER On this-day personally appeared before me D. L.
RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIYEN under my hand and sea1 this ~m~C day of.."~i~~
I
, 1980 Notary Pub ic in and<for the State of Washington Residing at
~~a
t
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 956 3000 GEO. WASHINCTON WAY RICHI.AND, WASHINCEON 99352 PHONE (509) 375 5000 Docket No. 50-397 Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 G02-80-20 January 21, 1980 Attention:
Mr. L. Rubenstein, Chief Branch No.
4 Division of Project Management
Subject:
WPPSS NUCLEAR PROJECT NO.
2 REVISION TO CHAPTER 1.7 DRAWINGS
Dear Mr. Rubenstein:
Enclosed with this letter please find seven (7) copies of revisions to the electrical, instrumentation and control drawings listed in section 1.7 of the FSAR as per the attached Table.
By copy of this letter, one (1) complete set of the drawings is also being forwarded to Savannah River per their request.
Section 1.7 of the FSAR will be updated in Amendment 8
to the FSAR to reflect the revisions.
Very truly yours, DLR:OKE:cph
Attachment:
- 1. Table 1.7-1 (7 copies)
- 2. Set of Drawings cc:
w/out attachments D. Lynch -
NRC R. Satterfield -
NRC J. Ellwanger - B8R JJ Verderber - B&R RC Root B&R/Site JR Lewis - BPA ND Lewis - EFSEC, Olympia NS Reynolds - Debevoise 8 Liberman WNP-2 Files D. L.
RENBERGER Assistant Director Technology cc: w/both attachments EI DuPont De Nemours
& Co. Inc.
Savannah River Plant Aiken, South Carolina 29801 ATTN:
WM Taylor Bldg. 703-3, Room 2
W's q gg>@
'STATE"'OF'"WASHINGTON)
)
ss COUNTY OF BENTON WPPSS NUCLEAR PROJECT NO.
2 REVISION TO CHAPTER 1.7 DRAWINGS D. L. RENBERGER, Being first duly sworn, deposes and says:
That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
DATED D. L.
RENBERGER On this day personally appeared before me D. L.
RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this day of
, 1980 Nota y Public in and for the State of Washington Residing at
)
gr, Np gl,i.l
WNP 2
AMENDMENT NOo 8 February 1980 TABLE 1 ~ 7-1 Page 1 of 42 ELECTRICAL, INSTRUMENTATZON 6 CONTROL DRAWINGS A.
General Electric Drawings Drawing No.
(GiEi MPL Noi )
Title Revision Noe Revision Submittal Date B22-1010 732E 103 Nuclear Boiler System PGID Sheets 1,2 January 1979 B22-1010 732E103 Nuclear Boiler System PaID.
Sheet 3
10 January 1979
'22-1030 731E788 Auto Depressurization System FCD Sheet 1
September 1979 B22-1030 731E788 Auto Depressurization System FCD. Sheets 2,3@4 8
Original B22-1030 731E788 Auto Depressurization System FCD. Sheet 5
Original B22-1030 731E788 B22-1030 731E788 B22-1050 807E153TC Auto Depressurization Syst: em FCD. Sheet 6
Auto Depressurization System FCD. Sheet 7
Nuclear Boiler Process Instrumentation System Sheet 1
January 1979 January 1979 March 1979 B22-1050 807E153TC Nuclear Boiler Process Instrumentation System Sheet 1A Original B22-1050 807E153TC Nuclear Boiler Process Instrumentation System Sheet 2
Original B22-1050 807E153TC Nuclear Boiler Process Instrumentation System Sheet 3
Original B22-1050
, 807E153TC Nuclear Boiler Process Instrumentation System Sheet 4
January 1979 1 ~ 7 2
AMENDMENT NOe 8
February 1980 TABLE 1.7-1 (Continued)
Page 2 of 42 Drawing No.
(GEE+
MPL No+)
Title Revision Noe Revision Submittal Date B22-1060 807E180TC Auto Depressurization System - Sheet 1,
12 July 1979 B22-1060 807E180TC B22-1060 807E180TC Auto Depressurization System - Sheet 2
l Auto Depressurization System Sheet 3
12 Void July 1979 Original ~~~
B22-1060 807E180TC Auto Depressurization System - Sheet 4
12
'uly 1979 B22-1060 807E180TC Auto Depressurization System - Sheet 5
12 January 1979 B22-1060 807E180TC Auto Depressurization System - Sheet 6
January 1979 B22-1060 807E180TC
~
Auto Depressurization System - Sheet 7
12 January 1979 B22-1060 807E180TC B22-1060 807E180TC Auto Depressurization System - Sheet 8
Auto Depressurization System - Sheet 9
12 12 January 1979 July 1979 B22-1080 807E156TC Jet Pump Instrumentation System
<< Sheet 1
January 1979 B22-1080 807E156TC B22-1090 807E152TC Jet Pump Instrumentation System - Sheet 2
Nuclear Steam Supply Shutoff System-Sheet 1
January 1979 January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 1A January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 2
Original 1 ~ 7 2a
l
HNP-2 AMENDMENT NO ~ 8 February 1980 Drawing No.
(GiEi MPL Noi)
Title TABLE 1 7-1(Continued)
Revision No+
Page 3 of 42 Revision Submittal Date B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 3
Original B22-1090 i807E152TC Nuclear Steam Supply Shutoff System Sheet 4
Original B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 5
Original B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 5A Original B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 6
January 1979 B22-1090 807E152TC Nuclear Steam Supply Shuto ff System Sheet 7
January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 8
January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System Sheet 9
. January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 10 January 1979 B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 11 Original B22-1090 807E152TC Nuclear Steam Supply Shutoff System-Sheet 12 Original 1 ~ 7 3
I
AMENDMENT NO+ 8 February 1980 TABLE 1.7-, 1(Continued)
Page 4 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date B35-1030 761E791AD Reactor Recirculation r
System - Sheet 1
10 March 1979 B35-1030 761E791AD Reactor Recirculation System Sheet 2
January 1979 B35-1030 761E791AD B35-1030 761E791AD B35-1030 761E791AD B35-1030 761E791AD B35-1030 761E79 1AD Reactor Recirculation System >> Sheet 3
Reactor Recirculation System Sheet 4
Reactor Reciiculation System Sheet 5
Reactor Recirculation System Sheet 6
Reactor Recirculation System - Sheet 7
January 1979 January 1979 January 1979 January 1979 March 1979 1 ~ 7 3a
AMENDMENT NOe 8
February 1980 TABLE 1. 7-1(Continued)
Page 5 of 42 Drawing No.
(GoEe MPL No+)
Title Revision No+
Revision Submittal Date B35-1030 761E791AD Reactor Recirculation System - Sheet 8
9 January 1979 B35-1030 761E791AD Reactor Recirculation System - Sheet 9
January 1979 B35-1030 761E791AD B35-'1030 761E791AD Reactor Recirculation System - Sheet 10 Reactor Recirculation System - Sheet 11 10 10 January 1979 March 1979 B35-1030 761E79 1AD Reactor Recirculation System Sheet 12 January 1979 B35-1030 761E79 1AD B35-1030 761E79 1AD B35-1030 761E791AD B35-1030 761E791AD B35-1030 761E791AD B35-1030 761E791AD Reactor Recirculation System Sheet 13 Reactor Recirculation System Sheet 14 Reactor Recirculation System - Sheet 15 Reactor Recirculation System - Sheet 16 Reactor Recirculation System - Sheet 17 Reactor Recirculation System - Sheet 18 January 1979 January 1979 January 1979 January 1979 January 1979 January 1979 B35-1030 761E791AD Reactor Recirculation System Sheet 19 January 1979 B35-1030 761E791AD B35-1030 761E79 1AD Reactor Recirculation System - Sheet 20 Reactor Recirculation System - Sheet 21 January 1979 January 1979 1 ~ 7-4
J I
AMENDMENT NOo 8
February 1980 TABLE 1. 7-1(Continued)
Page 6 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision Noo Revision Submittal Date B35-1030 761E791AD Reactor Recirculation System Sheet 22 January 1979 B35-1030 761E791AD Reactor Recirculation System - Sheet 23 January 1979 B35-1030 761E791AD Reactor Recirculation System - Sheet 24 January 1979 B35-1030 761E791AD Reactor Recirculation System - Sheet 25 January 1979 C12-1050 828E230 Reactor Manual Control System - Sheet 1
January 1979 C12-1050 828E230 Reactor Manual Control System Sheet 2
Original C12-1050 828E230 Reactor Manual Control System - Sheet 3
January 1979 C12-1050 828E230 C12-1050 828E230 Reactor Manual Control System Sheet 4
Reactor Manual Control System - Sheet 5
Original Original C12-1050 828E230 Reactor Manual Control System >> Sheet 6
Original C12-1050 828E230 Reactor Manual Control System - Sheet 7
Original C12-1050 828E230 Reactor Manual Control System Sheet 8
Original C12-1050 828E230 Reactor Manual Control System - Sheet 9
Original C12-1050 828E 230 Reactor Manual Control System - Sheet 10 January 1979 C12-1050 828E230 Reactor Manual Control System - Sheet 11 Original 1 ~ 7-4a
AMEND NT NOo 8
February 1980 TABLE 1.7-1 (Continued)
Page 7 of 42 Drawing No.
(G.E.
MPL Noi)
Title Revision Non Revision Submittal Date C12-1050 828E230 Reactor, Manual Control System >> Sheet 12 3
Original C12-1050
. 828E230 C12-1050 828E230 I
C12-1050 828E230 Reactor Manual Control System - Sheet 13 Reactor Manual Control System - Sheet 14 Reactor Manual Control System - Sheet 15 Original Original Original C12-1050 828E230 Reactor Manual Control System - Sheet 16 Original C12-1050 828E230 Reactor Manual Control
~ System Sheet 17 Original 1 ~ 7-4b
I
AMEND NT NO+ 8 February 1980 TABLE 1'-1 (Continued)
Page 8 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision Noe Revision Submittal Date C12-1050 828E230 Reactor Manual Control System - Sheet 18 Original C12-1050 828E230 Reactor Manual Control System - Sheet 19 Original C12-1050 828E230 Reactor Manual Control System - Sheet 20 Original C12-1050 828E230 Reactor Manual Control System - Sheet 21 Original C12-1050 828E230 C12-1050 828E230 Reactor Manual Control System - Sheet 22 Reactor Manual Control System - Sheet 23 4
Original Original C12-1050 828E230 Reactor Manual Control System - Sheet 24 Original C12-1050 828E230 C12-1060 807E159TC Reactor Manual Control System - Sheet 25 Control Rod Drive Hydraulic System-Sheet 1
Original January 1979 C12-1060 807E159TC Control Rod Drive Hydraulic System-Sheet 2
Janaury 1979 C34-1050 807E160TC Feedwater Control System - Sheet 1
10 January 1979 C34-1050
~
807E160TC C34-1050 807E160TC C34-1050 807E160TC Feedwater Control System - Sheet 2
Feedwater Control System - Sheet 3
Feedwater Control System - Sheet 4
10 January 1979 January 1979 Original 1 ~ 7-5
AMENDMENT NO+
8 February 1980 TABLE 1.7<<1 (Continued)
Page 9 of 42 Drawing No.
(G.E.
MPL No.)
Title Revision Revision Submittal No Date C34-1050 807E160TC C41-1050 807E161TC C41-1050 807E161TC Feedwater Control System - Sheet 5
Standby Liquid Control System
>> Sheet 1
Standby Liquid Control System - Sheet 2
Original January 1979 Original C41-1050 807E161TC Standby Liquid Control System - Sheet 3
January 1979 C51-1050 807E164TC Startup Range Detector Drive Control System Sheet 1
Original C51-1050 807E164TC Startup Range Detector Drive Control System-Sheet 2
Original 1 ~ 7-Sa
~ I l
AMEND T NOo 8 February 1980 TABLE 1.7-1 (Continued)
Page 10 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date C51-1050 807E164TC.
Startup Range Detector Drive Control System Sheet 3
3 Original C51-1050 807E164TC Startup Range Detector Drive Control System-Sheet 4
Original C51-1050 807E164TC Startup Range Detector Drive Control System Sheet 5
Original C51-1060 807E165TC Transversing In-Core Probe Calibration System - Sheet 1
January 1979 C51-1060 807E165TC Transversing Inshore Probe Calibration System - Sheet 2
January 1979 C51-1060 807E165TC Transversing In-Core Probe Calibration System Sheet 3
January 1979 C51-1060 807E165TC C51-1060 807E165TC Transversing In-Core Probe Calibration System Sheet 4
Transversing In-Core Probe Calibration System - Sheet 5
January 1979 I
January 1979 C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 1
10 Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 2
Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 3
10 Original 1 ~ 7-6
AMEND T NO+ 8 February 1980 TABLE 1.7-1 (Continued)
Page 11 of 42 Drawing No.
(GiEi MPL Noi )
Title Revision No Revision Submittal Date C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 4
Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 5
Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 6
10 Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 7
10 Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 8
Original 1 ~ 7-6a'
AMEND NO o 8 February 1980 TABLE 1'-1 (Continued)
Page 12 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 9
9 Original C51-1070 807E162TC Startup Range Neutron Monitoring System Sheet 10 Original C51-1070 807E162TC Startup Range Neutron Monitoring System-Sheet 11 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 1
12 January 1979 C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 2
6 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 3
Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 4
Original C51-1080 807E163TC Power Range Neutron Monitoring System >>
Sheet 5
- Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 6
Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 7
Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 8
Original 1 ~ 7 7
1 t
AMEND~ NO+ 8 February 1980 TABLE 1.7-1 (Continued,)
Page 13 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 9
6 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 10 Original
~ C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 11 Original C51-1080
'07E163TC Power Range Neutron Monitoring System-Sheet 12 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 13 Original 1 ~ 7 7a
l
AMEN T NO+ 8 February 1980 TABLE 1.7-1 (Continued)
Page 14 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision Noe
'Revision Submittal Date C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 14 6
Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 15 Original C51>>1080
~
Power Range Neutron 807E163TC Monitoring System >>
Sheet 16 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 17 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 18 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 19 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 20 Original C51-1080 807E163TC C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 21 I
Power Range Neutron Monitoring System Sheet 22 Original Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 23 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 24 7
Original 1 ~ 7-8
t t
AM NOa 8 February 1980 TABLE 1.7-1 (Continued)
Page 15 of 42 Drawing No.
(G.E.
MPL Noi)
Title Revision Revision Submittal No+
Date C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 25 9
Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 26 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 27 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 28 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 29 10 Original 1 7-8a
'I
AMEN T NO+ 8 February 1980 TABLE 1.7-1 (Continued)
Page 16 of 42 Drawing No (GiEi MPL Noi)
Title Revision Revision Submittal Noe Date C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 30 Original C51-1080 807E163TC
'\\
C51-1080 807E163TC Power Range Neutron Monitoring Syst: em-
'heet 31 Power Range Neutron Monitoring System-Sheet 32 Original Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 33 10 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet.
34 10 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 35 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 36 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 37 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 38 10 Original C51-1080 807E163TC C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 39
/
Power Range Neutron Monitoring System-Sheet 40 12 Original January 1979 1 ~ 7-9
AMEN T NOo 8 February 1980 TABLE 1.7-1 (Continued)
Page 17 of 42 Drawing No.
"(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 41 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 42 January 1979 C51-1080.
807E163TC Power Range Neutron Monitoring System Sheet 43 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 44 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 45 Original 1 ~ 7-9a
I
AMEN i
NO+ 8 February 1980 TABLE 1.7-1 (Continued)
Page 18 of 42 Drawing No.
(GiEi MPL Noi)
.Title Revision Revision Submittal No+
Date C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 46 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 47 Original C51-1080 807E163TC Power Range Neutron Monitoring System-Sheet 48 10 Original C51-1080 807E163TC Power Range Neutron Monitoring System Sheet 49 10 Original C72-1010 732E170AD C72-1010 732E170AD C72-1050 807E178TC C72-1050 807E178TC C72-1050 807E178TC Reactor Protection System ZED. Sheets 1,2 Reactor Protection System ZED. Sheets 3,4 Reactor Protection System Sheet 1
Reactor Protection System Sheet 2
Reactor Protection System - Sheet 3
10 10 January 1979 January 1979 January 1979 Original January 1979 C72-1050 807E178TC Reactor Protection System - Sheet 4
10 January 1979 C72-1050 807E178TC C72-1050 807E178TC C72-1050 807E178TC Reactor Protection System - Sheet 5
Reactor Protection System - Sheet 6
Reactor Protection System - Sheet 7
10 10 10 January 1979 January 1979 January 1979 1 ~ 7-10
0 0
I
AMEN NOo 8 February 1980 TABLE 1 7-1 (Continued)
Page 19 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision Noo Revision Submittal Date C72-1050 807E178TC Reactor Protection System Sheet 8
10 January 1979 C72-1050 807E178TC Reactor Protection System Sheet 9
10 January 1979 C72-1050 807E178TC C72-1050 807E178TC C72-1050 807E178TC C72-1050 807E178TC C72-1060 115D6268TC C72-1070 807E179TC C72-1070 807E179TC Reactor Protection System Sheet 10 Reactor Protection System - Sheet 11 Reactor Protection System - Sheet 11A Reactor Protection System Sheet 12 Reactor Protection System MG Set Control RPS Interconnection Scheme Sheet 1
RPS Interconnection Scheme Sheet 2
10 10 10 Original January 1979 January 1979 January 1979 Original Original Original 1 ~ 7-10a
AMEND NO o 8 February 1980 TABLE 1 ~ 7-1(Continued)
Page 20 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date C72-1070 807E179TC RPS Interconnection Scheme - Sheet 3
1 Original D17-1050 807E168TC Process Radiation Monitoring System Sheet 1
13 June 1979 D17-1050 807E168TC Process Radiation Monitoring System Sheet 2
13 June 1979 D17-1050 807E168TC Process Radiation Monitoring System-Sheet 3
Original D17-1050 807E168TC Process Radiation Monitoring System-Sheet 3A Original D 1 7-1050 807E168TC Process Radiation Monitoring System-Sheet 4
Original D17-1050 807E168TC Process Radiation Monitoring System-Sheet 5
13 June 1979 D17-1050 807E168TC Process Radiation Monitoring System Sheet 5A 13 June 1979 D17-1050 807E168TC Process Radiation Monitoring System-Sheet 6
13 June 1979 D17-1050 807E168TC Process Radiation Monitoring System-Sheet 7
Original D17-1050 807E168TC Process Radiation Monitoring System-Sheet 8
13 June 1979 1 ~ 7 1 1
AMEN NOo 8 February 1980 TABLE 1. 7-1(Continued)
Page 21 of 42
'Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date D17-1050 807E168TC Process Radiation Monitoring System-Sheet 9
13 June 1979 D21>>1050 807E169TC Area Radiation Monitoring System Sheet 1
January 1979 D21-1050 807E169TC Area Radiation Monitoring System-Sheet 2
January 1979 D21-1050 807E 169TC Area Radiation Monitoring System-Sheet 3
January 1979 D21-1050 807E169TC Area Radiation Monitoring System-Sheet 4
January 1979 D21-1050 807E169TC Area Radiation Monitoring System Sheet 5
January 1979 1 ~ 7-11a
w/
l
AM T NO ~
8 February 1980 TABLE 1.7-1 (Continued)
Page 22 of 42 Drawing No.
(G~E~
MPL No~)
Title Revision Revision Submittal Noe Date D21-1050 807E169TC Area Radiation Monitoring System Sheet 6
5 Original E12-1050 807E170TC E12-1050 807E170TC Residual Heat, Removal System - Sheet 1
Residual Heat Removal System - Sheet 2
13 12 January 1979 January 1979 E12-1050 807E170TC Residual Heat Removal System Sheet 3
13 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 4
13 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 5
1 3 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 6
13 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 7
13 January 1979 E12-1050 807E170TC E12-1050 807E170TC E12-1050 807E170TC E12-1050 807E170TC Residual Heat Removal System Sheet 8
Residual Heat Removal System - Sheet 9
Residual Heat Removal System Sheet 10 Residual Heat Removal System - Sheet 11 10 10 12 13 Original Original January 1979 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 12 13 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 13 13 January 1979 E12-1050 807E170TC Residual Heat Removal System - Sheet 14 13 January 1979 1 ~ 7 12
AMEND NO o 8 February 1980 TABLE 1.7-1 (Continued)
Page 23 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date E12-1050 807E170TC Residual Heat Removal System - Sheet 15 13 January 1979 E12-1050 807E170TC E21-1050 807E171TC E21-1050 807E171TC Residual Heat Removal System - Sheet 16 Low Pressure Core Spray System - Sheet 1
Low Pressure Core Spray System - Sheet 2
10 Original January 1979 January 1979 E21-1050 807E171TC Low Pressure Core Spray System - Sheet 3
10 January 1979 E21-1050 807E171TC Low Pressure Core Spray System - Sheet 4
January 1979
- 1. 7-12a
AMEN T NOo 8
February 1980 TABLE 1.7-1 (Continued)
Page 24 of: 42 Drawing No.
(GiE MPL Noi)
Title Revision No+
Revision Submittal Date E22-1050 807E172TC High Pressure Core Spray System - Sheet 1
15 January 1979 E22-1050 807E172TC High Pressure Core Spray System - Sheet 2
15 January 1979 E22-1050 807E172TC E22-1050 807E172TC High Pressure Core Spray System - Sheet 3
II High Pressure Core Spray System - Sheet 4
15 13 January 1979 Original E22-1050 807E172TC High Pressure Core Spray System - Sheet 5
13 Original E22-1050 807E172TC E22-1060 731E302AD High Pressure Core Spray System - Sheet 6
High Pressure Core Spray System One Line Diag. - Sheet 1
15 January 1979 Original E22-1060 731E302AD High Pressure Core Spray System One Line Diag. - Sheet 2
Original E22-1060 731E302AD High Pressure Core Spray System One Line Diag. - Sheet 3
Original E22-1070 807E183TC HPCS Power Supply Sheet 1
January 1979 E22-1070 807E 183TC HPCS Power Supply Sheet 2
January 1979 E22-1070 807E183TC HPCS Power Supply Sheet 3
January 1979 E22-1070 807E183TC HPCS Power Supply Sheet 4
January 1979 E22-1070 807E183TC HPCS Power Supply Sheet 5
Original 1 ~ 7 13
AMEND T NO ~ 8 February 1980 TABLE 1.7-1 (Continued)
Page 25 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date E22-1070 807E183TC HPCS Power Supply Sheet 6
January 1979 E31-1010 732E 191 Leak Detection System ZED. Sheets 1,2 Original E31-1050 807E154TC Leak Detection System Sheet 1
10 January 1979 E31-1050 807E154TC Leak Detection System
'Sheet 1A Original E31-1050 807E154TC Leak Detection System Sheet 2
Original E31-1050 807E154TC Leak Detection System Sheet 3
Original E31-1050 807E154TC Leak Detection System Sheet 4
Original 1 ~ 7 13a
0 I
AMEND NO ~ 8 February 1980 TABLE 1. 7-1(Continued) t Page 26 of 42 I
Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date E31-1050 807E154TC E31-1050 807E154TC E31-1050 807E154TC E31-1050 807E154TC E31-1050 807E154TC E31-1050 807E154TC Leak Detection System Sheet 4A Leak Detection System Sheet 5
Leak Detection System Sheet 6
Leak Detection System Sheet 7
Leak Detection System
~ Sheet 8
Leak Detection System Sheet 9
10 January 1979 Original Original'riginal Original 3
Original E31-1050 807E154TC Leak Detection System Sheet 10 Original E31-1050 807E154TC E31-1050 807E154TC E51-1050 807E173TC E51-1050 807E173TC E51-1050 807E173TC E51-1050 807E173TC E51-1050 807E173TC Leak Detection System Sheet 11 Leak Detection System Sheet 12 RCIC System - Sheet RCIC System Sheet 1A RCIC System - Sheet 2
RCIC System - Sheet 3
RCIC System - Sheet 4
10 12 12 12 12 12 Original January 1979 January 1979 January 1979 January 1979 January 1979 January 1979 1 ~ 7-14
AMEN NOo 8
February 1980 TABLE 1.7-1(Continued)
Page 27 of 42 Drawing No.
(G~Ei MPL No>>)
Title Revision No+
Revision Submittal Date E51-1050 807E173TC RCIC System - Sheet 5
12 January 1979 E51-1050 807E173TC RCIC System - Sheet 6
12 January 1979 E51-1050 807E173TC RCIC System - Sheet 7
12 January 1979 G33-1050 807E175TC Reactor Water Cleanup System
<< Sheet 1
Original G33-1050
~
807E175TC Reactor Water Cleanup System - Sheet 2
Original G33-1050 807E175TC N64-1050 828E155TC N64-1050 828E155TC Reactor Water Cleanup System - Sheet 3
Off-Gas System - Low Temperature Sheet 1
Off-Gas System - Low Temperature Sheet 2
Original July 1979 January 1979 N64-1050 828E155TC Off-Gas System Low Temperature - Sheet 3
January 1979 1 ~ 7-14a
AM NT NO+ 8 February 1980 Drawing No.
(GiEi MPL Noi)
Title TABLE 1.7-1(Continued)
Revision No+
\\
Page 28 of 42 Revision Submittal Date N64-1050 828E155TC Off&as System - Low Temperature
>> Sheet 4
8 March 1979 N64-1050 828E155TC Off-Gas System Low Temperature - Sheet 5
January 1979 N64-1050 828E155TC I
N64-1050 828E155TC N64-1050 828E155TC OffWas System Low Temperature Sheet 6
OffMas System - Low Temperature - Sheet 7
OffMas System - Low Temperature Sheet, 8
January 1979 January 1979 January 1979 N64-1050 828E 155TC Off-Gas System Low Temperature Sheet 9
January 1979 N64-1050 828E155TC Off-Gas System Low Temperature - Sheet 10 January 1979 N64-1050 828E155TC OffMas System - Low Temperature Sheet 11 January 1979 N64-1050 828E155TC Off-Gas System - Low Temperature - Sheet 12 January 1979 N64-1050 828E155TC OffWas System - Low Temperature - Sheet 13 January 1979 C61-1050 807E151TC Remote Shutdown System Sheet 1
January 1979 C61-1050 807E151TC Remote Shutdown System Sheet 2
January 1979 C61-1050 807E151TC Remote Shutdown System Sheet 3
Original C61-1050 807E151TC Remote Shutdown System Sheet 4
Original 1 ~ 7-15
r
~
AMENDMENT NO+ 8 February 1980 h
TABLE 1. 7-1(Continued)
Page 29 of 42 Drawing No.
(GeE MPL Noe)
Title Revision Noe Revision Submittal Date C61-1050 807E151TC Remote Shutdown System Sheet 5
Original C61-1050 807E151TC Remote Shutdown System Sheet 6
Origninal C61-1050 807E151TC C61-1050 807E151TC C61-1050 807E151TC C61-1050 807E151TC Remote Shutdown System Sheet 7
Remote Shutdown System Sheet 8
Remote Shutdown System Sheet 9
Remote Shutdown System Sheet 10 january 1979 Original Original Original C61-1050 807E151TC Remote Shutdown System Sheet 11 Original 1 ~ 7-15a
I
AMENDMENT NO+ 8 February 1980 TABLE 1 '-1(Continued)
Page 30 of 42 Drawing No.
(G.E.
MPL No.)
Title Revision Revision Submittal, Noe Date G11-1040 807E174TC Radwaste System Sheet 1
June 1979 G11-1040 807E174TC G11-1040
'" 807E174TC Radwaste System Sheet 2
Radwaste System Sheet 3
Original June 1979 G11-1040 807E174TC Radwaste System Sheet 4
June 1979 G11-1040 807E174TC Radwaste System Sheet 5
June 1979 G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet SA Radwaste System Sheet SB June 1979 Original G11-1040
'07E174TC Radwaste System Sheet 5C Original G11-1040 807E174TC Radwaste System Sheet SD June 1979 G11-1040 807E174TC Radwaste System Sheet 6
June 1979 G11-1040 807E174TC Radwaste System Sheets 7,7a June 1979 G11-1040 8 07E174TC Radwaste System Sheet 8
June 1979 G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet SA Radwaste System Sheet 9
Radwaste System Sheet.
9A June 1979 June 1979 June 1979 1 ~ 7-16
e E
AMENDMENT NO+ 8 February 1980 TABLE 1. 7-1(Continued)
Page 31 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date G11-1040 807E174TC Radwaste System Sheet 9B June 1979 G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 10 Radwaste System Sheet 11 June 1979 June 1979 G11-1040 807E174TC Radwaste System Sheet 12 June 1979 G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 13 Radwaste System Sheet 14 June 1979 Original
- 1. 7-16a
AMEND NT NO+ 8 February 1980 TABLE 1 ~ 7-1(Continued)
Page 32 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision No+
Revision Submittal Date G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 15 Radwaste System Sheet 16 Radwaste System Sheet 17 Radwaste System Sheet 18 Radwaste System Sheet 19 Radwaste System Sheet 19A 7
Original June 1979 Original Original June 1979 IJune 1979 G11-1040 807E1 74TC Radwaste System Sheet 20 Original G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC G11-1040
'07E174TC Radwaste System Sheet 21 Radwaste System Sheet 22 Radwaste System Sheet 23 Radwaste
- System, Sheet 24 Radwaste System Sheet 25 Original Original Original June 1979 June 1979 G11-1040 807E174TC Radwaste System Sheet 26 Original G11-1040 807E174TC Radwaste System Sheet 27 June 1979 G11-1040 807E174TC Radwaste System Sheet 28 January 1979 1 ~ 7 17
AMENDMENT NO+ 8 February 1980 Drawing No.
(GiEi MPL Noi)
Title TABLE 1 ~ 7-1(Continued)
Revision No+
Page 33 of 42 Revision Submittal Date G11-1040 807E174TC Radwaste System Sheet 29 7
Original G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 30 Radwaste System Sheet 31 Radwaste System Sheet 32 June 1979 Original Original G11-1040 807E174TC Radwaste System Sheet 33 June 1979 1 ~ 7-17a
AMENDMENT NOo 8 February 1980 TABLE 1 ~ 7-1(Continued)
Page 34 of 42 Drawing No.
(GeEo MPL No+)
Title Revision No+
Revision Submittal Date G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 34 Radwaste System Sheet 35 June 1979 June 1979 G11-1040 807E174TC Radwaste System Sheet 36 June 1979 G11-1040 807E174TC G11-1040
~
807E174TC G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 37 Radwaste System Sheet 38 Radwaste System Sheet 39 Radwaste System Sheet 40 Original Original June 1979 June 1979 G11-1040 807E174TC Radwaste System Sheet 41 Original G11-1040 807E174TC Radwaste System Sheet 42 June 1979 G11-1040 807E174TC Radwaste System Sheet 43 June 1979 G11-1040 807E174TC Radwaste System Sheet 44 June 1979 G11-1040 807E174TC Radwaste System Sheet 45 June 1979 G11-1040 807E174TC G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 46 Radwaste System Sheet 47 Radwaste System Sheet 48 June 1979 June 1979 June 1979 1 ~ 7-18
t
AMENDMENT NO+ 8 February 1980 Drawing No.
(GiEi MPL Noi)
Title TABLE 1 ~ 7-1(Continued)
Revision Now Page 35 of 42 Revision Submittal Date G11-1040 807E174TC Radwaste System Sheet 49 9
June 1979 G11-1040 807E174TC Radwaste System Sheet 50 June 1979 G11-1040 807E174TC Radwaste System Sheet 51 June 1979 G11-1040 807E174TC Radwaste System Sheet 52 June 1979
- 1. 7-18a
AMENDMENT NO+ 8 February 1980 TABLE 1.7-1(Continued)
Page 36 of 42 Drawing No.
(GiEi MPL Noi)
Title Revision Now Revision
- Submittal Date G11-1040 807E174TC Radwaste System Sheet 53 9
June 1979 G11-1040 807E174TC G11-1040 807E174TC Radwaste System Sheet 54 Radwaste System Sheet 55 June 1979 June 1979 G11-1040 807E174TC Radwaste System Sheet 56 7
Original G11-1040 807E174TC Radwaste System Sheet 57 June 1979 G11-1040 807E174TC Radwaste System Sheet 58 7
Original G11-1040 807E174TC Radwaste System Sheet 59 June 1979 G11-1040 807E174TC Radwaste System Sheet 60 June 1979
- G11-1040
, 807E174TC Radwaste System Sheet 61 Original G11-1040 807E174TC Radwaste System Sheet 62 Original 1 ~ 7-19
~
~
AMENDMENT NO o 8 February 1980 TABLE 1. 7-1(Continued)
Page 37 of 42 B
Burns and Roe, Inc Drawings Drawing No.
(BGR Dw iNoi)
Title Revision Revision 'ubmittal No+
Date E 501 E 516 E 516 Electrical Symbol List 6900V Switchgear-Sheet 1
II 6900V Switchgear-Sheet 2
Original Original Original E 516 6900V Switchgear-Sheet 3
Original E 517 4160V Switchgear-Sheet 1
Original E 517 4160V Switchgear Sheet 2
Original E 517 4160V Switchgear-Sheet 3
Original E 517 4160V Switchgear-Sheet 4
Original E 517 4160V Switchgear-Sheet 5
Original E 517 4160V Switchgear-Sheet 6
Original E 517 4160V Switchgear-Sheet 7
Original E 517 4160V Switchgear'-
Sheet 8
Original E 517 4160V Switchgear-Sheet 9
Original E 517 4160V Switchgear-Sheet 10 Original 1 ~ 7-20
~
~
AMEND T
NO ~ 8 February 1980 TABLE 1. 7-1(Continued)
Page 38 of 42 Drawing No (BGR Dw iNo.)
Title Revision No+
Revision Submittal Date E 517.
4160V Switchgear-Sheet 11 4
Original E 517 4160V Switchgear-Sheet 12 Ori,ginal E 517 4160V Switchgear-Sheet 13 Original E 517 4160V Switchgear-Sheet 14 Original E 517 4160V Switchgear-Sheet 15 Original E 517 4160V Switchgear-Sheet 16 2
Original f
E 517 4160V Switchgear-Sheet 17 Original
- 1. 7-20a
~
~
I
AMENDMENT NOe 8'ebruary 1980 TABLE 1. 7-1(Continued)
Page 39 of 42 Drawing No.
(BGR Dw +Nod)
Title Revision No+
Revision Submittal Date E 518 480V Switchgear-Sheet 1
3 Original E 518 480V Switchgear-Sheet 2
Original E 518 480V Switchgear-Sheet 3
Original E 518 480V Switchgear-Sheet 4
Original E 518 480V Switchgear-Sheet 5
Original E 518 480V Switchgear-Sheet 6
Original E 519 Motor Valve 6 Misc.
Control - Sheet 1
Original E 519 Motor Valve a Misc.
Control - Sheet 1A Original E 519 Motor Valve 6 Misc.
Control - Sheet 1B Original E 519 Motor Valve 6 Misc.
Control - Sheet 2
Original E 519 Motor Valve 6 Misc.
Control - Sheet 3
Original E 519 Motor Valve a Misc.
Control - Sheet 4
Original E 519 Motor Valve 8 Misc.
Control - Sheet 5
Original E 519 Motor Valve a Misc.
Control Sheet 6
~
7 Original 1 ~ 7-21
g
~
)
I )
AMEN T NOe 8
February 1980 TABLE 1 ~ 7-1(Continued)
Page 40 of 42 Drawing No.
(BGR Dw iNo.)
Title Revision No+
Revision Submittal
,Date E 519 Motor Valve 6 Misc.
Control - Sheet 7
12 Original E 519 Motor Valve 6 Misc.
Control Sheet 8
Original E 519 Motor Valve 6 Misc.
Control Sheet 9
Original E 519 Motor Valve 6 Misc.
Control - Sheet 10 Original E 519 Motor Valve 6 Misc.
Control - Sheet 11 Original E 519 Motor Valve 6 Misc Control - Sheet 12 Original E 519 Motor Valve 6 Misc.
Control - Sheet 13 Original E 519 Motor Valve 6 Misc.
Control Sheet 14 10 Original
- 1. 7-21a
ap ar AM NT NO ~ 8 February 1980 TABLE 1 ~ 7-1(Continued)
Page 41 of 42 Drawing No.
(BGR Dw eNoe)
Title Revision Noe Revision Submittal Date E 519 Motor Valve 6 Misc.
Control - Sheet 15 11 Original E 519 Motor Valve 6 Misc.
Control - Sheet 16 Original E 519 Motor Valve a Misc.
Control - Sheet 17 Original E 519 Motor Valve 6 Misc.
Control - Sheet 18 Original E 519 Motor Valve 6 Misc.
Control Sheet 19 10 Original E 519 Motor Valve 6 Misc.
Control Sheet 20 Original E 519 Motor Valve 6 Misc.
Control - Sheet 21 Original E 519 Motor Valve' Misc.
Control - Sheet 22 Original E 519 Motor Valve 6 Misc.
Control Sheet 23 Original E 519 Motor Valve 6 Misc.
Control - Sheet 24 Original E 519 Motor Valve 6 Misc.
Control - Sheet 25 Original E 519 Motor Valve 6 Misc.
Control - Sheet 26 Original E 519 Motor Valve 6 Misc.
Control - Sheet 27 Original E 519 Motor Valve 6 Misc.
Control - Sheet 28 Original 1 ~ 7 22
to 4
e
AMEN.
NO+ 8 February 1980 TABLE 1 ~ 7>>1(Continued)
Page 42 of 42 Drawing No.
(BGR Dw.No.)
Title Revision No+
Revision Submittal Date E 519 Motor Valve a Misc.
Control Sheet 29 Original E 519 Motor Valve 6 Misc.
Control - Sheet 30 Original E 519 Motor Valve 6 Misc.
Control - Sheet 31 Original E 519 Motor Valve 6 Misc.
Control >> Sheet 32 9
Original E 519 Motor Valve 6 Misc.
Control - Sheet 33 Original E 523, Switch Develognent.
Original 1.7-22a
0.
~
'