ML17272A650

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/79-13 on 790717-20.No Noncompliance Noted
ML17272A650
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/24/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A651 List:
References
NUDOCS 7910030665
Download: ML17272A650 (3)


See also: IR 05000397/1979013

Text

/p +w*w+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94595

August 24,

1979

Docket No. 50-397

Washi igton Publ ic Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of Washington Nuclear Project

No.

2

(WNP-2)

This refers to the inspection

conducted

by Messrs.

D. P. Haist and

L. E. Vorderbrueggen of this office on July 17-20,

1979 of activities

authorized

by

NRC Construction Permit No.

CPPR-93,

and to the discussion

of our findings with Mr. A. D. Kohler and other

members of your staff at

the conclusion of the inspection.

Areas

examined during this inspection are =described in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit a written application

to this office, within 20 days of the date of this letter, requesting

- that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

,that any proprietary information identified is contained in an enclosure

Washington Public Power Supply System

-2-

August 24,

1979

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period,

the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we wil'l be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/79-13

yes~

G. S.

S encer,

Chief

~ Reactor Construction

and

Engineering Support

Branch

cc w/o enclosure:

M. E. Witherspoon,

Division Manager

equality Assurance,

HPPSS

A. D. Kohler, Manager

WNP-2 Project

/

0