ML17272A650
| ML17272A650 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/24/1979 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17272A651 | List: |
| References | |
| NUDOCS 7910030665 | |
| Download: ML17272A650 (3) | |
See also: IR 05000397/1979013
Text
/p +w*w+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94595
August 24,
1979
Docket No. 50-397
Washi igton Publ ic Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. N. 0. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection of Washington Nuclear Project
No.
2
(WNP-2)
This refers to the inspection
conducted
by Messrs.
D. P. Haist and
L. E. Vorderbrueggen of this office on July 17-20,
1979 of activities
authorized
by
NRC Construction Permit No.
CPPR-93,
and to the discussion
of our findings with Mr. A. D. Kohler and other
members of your staff at
the conclusion of the inspection.
Areas
examined during this inspection are =described in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspectors.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter
and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit a written application
to this office, within 20 days of the date of this letter, requesting
- that such information be withheld from public disclosure.
The applica-
tion must include
a full statement of the reasons
why it is claimed that
the information is proprietary.
The application should
be prepared
so
,that any proprietary information identified is contained in an enclosure
Washington Public Power Supply System
-2-
August 24,
1979
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room. If we do not hear from you
in this regard within the specified period,
the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we wil'l be
glad to discuss
them with you.
Sincerely,
Enclosure:
IE Inspection
Report
No. 50-397/79-13
yes~
G. S.
S encer,
Chief
~ Reactor Construction
and
Engineering Support
Branch
cc w/o enclosure:
M. E. Witherspoon,
Division Manager
equality Assurance,
HPPSS
A. D. Kohler, Manager
WNP-2 Project
/
0