ML17272A545

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/79-11 on 790529-31.No Noncompliance Noted
ML17272A545
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/14/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A546 List:
References
NUDOCS 7907270287
Download: ML17272A545 (2)


See also: IR 05000397/1979011

Text

~p,g REGS(

(4

P

4

)rg

P

9

+>>*<<+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94595

June

14,

1979

Docket No. 50-397

Ilashington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Nr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of MNP-2 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Hessrs.

P. Johnson

and

J.

Garison of this office on May 29-31,

1979 of activities authorized

by

NRC Construction Permit No.

CPPR-93,

and to the discussion of our findings

held by the inspectors with tlessrs.

J. Hartin,

D. Howard. J.

Holder and

other members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

tlithin these'reas,

the inspection consisted of

selective examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope

of- this inspection.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room. If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

790vsvo& '37

Washington Public Power Supply System

-2-

June

14,

1979

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/79-11

T

J.

L. Crews, Chief

Reactor Operations

an@-

Nuclear Support

Branch

cc wlo enclosure:

K. T. Perkins, Assistant Director,

Generation,

WPPSS

J.

D. Martin, Manager,

WNP-2 Startup

and Operations