Forwards IE Insp Rept 50-397/79-08 on 790423-26.No Noncompliance Noted
ML17272A537
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/25/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A539 List:
References
NUDOCS 7907260554
Download: ML17272A537 (3)


See also: IR 05000397/1979008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEI< PLAZA

WALNUTCREEI<, CALIFORNIA94596

Hay 25,

1979

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Nr.

N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection at Washington

Nuclear Project

No.

2 (WIIP-2)

This refers to the inspection

conducted

by Messrs.

T.

W. Bishop and

P.

P. Narbut of this office on April 23-26,

1979 of activities authorized

by NRC Construction Permit No.

CPPR-93,

and to the discussion of our

findings held by t1r, Bishop with Hr. D. L. Renberger

and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date. of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

0

5

itt ~

'~gybe

k

lq

Washington

PQblic Power Supply System

'I

-2-

flay 25,

1979

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

G. S. Spencer,

Chief

Reactor Construction

and

Engineering

Support Branch

Enclosure:

IE Inspection

Report

No. 50-397/79-08

cc w/o enclosure:

H.

E. Witherspoon, Division Hanager

guality Assurance,

IJPPSS

A.

D. Kohler,

Hanager

.

l<NP-2 Project