UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEI< PLAZA
WALNUTCREEI<, CALIFORNIA94596
Hay 25,
1979
Docket No. 50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Nr.
N. 0. Strand
Managing Director
Gentlemen:
Subject:
NRC Inspection at Washington
Nuclear Project
No.
2 (WIIP-2)
This refers to the inspection
conducted
by Messrs.
T.
W. Bishop and
P.
P. Narbut of this office on April 23-26,
1979 of activities authorized
by NRC Construction Permit No.
CPPR-93,
and to the discussion of our
findings held by t1r, Bishop with Hr. D. L. Renberger
and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspectors.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you believe
to be proprietary, it is necessary
that you submit
a written application
to this office, within 20 days of the date. of this letter, requesting
that such information be withheld from public disclosure.
The applica-
tion must include a full statement of the reasons
why it is claimed that
the information is proprietary.
The application should
be prepared
so
that any proprietary information identified is contained in an enclosure
0
5
itt ~
'~gybe
k
lq
PQblic Power Supply System
'I
-2-
flay 25,
1979
to the application,
since the application without the enclosure will
also
be placed in the Public Document
Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
G. S. Spencer,
Chief
Reactor Construction
and
Engineering
Support Branch
Enclosure:
IE Inspection
Report
No. 50-397/79-08
cc w/o enclosure:
H.
E. Witherspoon, Division Hanager
guality Assurance,
IJPPSS
A.
D. Kohler,
Hanager
.
l<NP-2 Project