Forwards IE Insp Rept 50-397/79-07 on 790402-04.No Noncompliance Noted
ML17272A517
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/09/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A518 List:
References
NUDOCS 7907110626
Download: ML17272A517 (4)


See also: IR 05000397/1979007

Text

V

<P,n II600

(4

.Q(+g',

";

+a**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

$ 990 N. CALIFORNIA BOULEVARO

WALNUT CREEK, CALIFORNIA 94596

1'

E>g

Docket No. 50-397

I

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Investigation at Washington

Nuclear Project

No.

2

(WNP-2)

This refers to the investigation conducted

by Messrs.

T. W. Bishop,

J.

H. Eckhardt'nd

0.

C. Shackleton of this office on April 2-4, 1979,

of construction activities at

WNP Unit 2 which are authorized

by

NRC

Facility License

No.

CPPR-93.

The investigation concerned

four specific

allegations of improper work by one of your site contractors.

None of

the allegations

were substantiated.

Areas

examined during the investigation are described

in the enclosed

investigation report.

Within these

areas,

the investigation consisted

of selective

examination of procedures

and representative

records, inter-

views with personnel,

and observations

by the'.inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope of this investigation.

In accordance

with Section

2. 790 of the

NRC's "Rules of Practice, "

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you be-

lieve to be proprietary, it is necessary

that you submit

a written

application to this office, within 30 days of the date of this letter,

requesting

that such information be withheld from public disclosure.

~90>XZoi~p

8'

~

I

'

Washington Public Power Supply System

MAY

g 58

The application must include

a full statement of the reasons

why it

is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary information identified is con-

tained in an enclosure

to the application,

since the application with-

out the enclosure will also

be placed in the Public Document

Room.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document

Room.

Should you have

any questions

concerning this investigation,

we will be

glad to discuss

them with you.

Sincerely,

9

G. S.

Sp

cer, Chief

Reactor Construction

and

Engineering

Support

Branch

Enclosure:

IE Inspection

Report

No. 50-397/79-07

cc w/o enclosure:

H. E. Witherspoon, Division Manager

guality Assurance,

WPPSS

A. D. Kohler, Manager

WNP-2 Project

i~L

I

'I