pe REC(yC
0C,
WP.0
.++*<<>>
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
SUITE 202, WALNUTCREEK PLAZA
I990 N. CALIFORNIA BOULEVARD
WALNUT CREEK, CALIFORNIA 94596
APR 26 SB
Docket No. 50-397
Washington Public Power Supply System
P.O.
Box 968
Richland, Washington
99352'ttention:
Mr. N. 0. Strand
Managing Director
Gentlemen;
Subject:
NRC Inspection at Washington Nuclear Project
No,
2 (WNP-2)
This refers to the inspection
conducted
by Messrs. '.
H, Bishop and
J.
K, Eckhardt of this office on April 2-5, 1979, of activities author-
ized by NRC Construction
Permit No.
CPPR-93,
and to the discussion of
our findings held by Mr. Bishop with Mr. A, D. Kohler and other
members
of your staff at the conclusion of the inspection.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations,
a copy of this letter
and the enclosed
inspection report will be placed in the NRC's Public
Document
Room. If this report contains
any information that you
believe to be proprietary, it is necessary
that you submit a written
application to this office, within 30 days of the date of this letter,
requesting that such information be withheld from public disclosure.
The application must include
a full statement
of the reasons
why it
is claimed that the information is proprietary.
The appl.ication
should
be prepared
so that any proprietary information identified is
contained in an enclosure to the application, since the application
with the enclosure will also
be placed in the Public Document
Room.
If we do not hear from you in this reg'ard within the specified period,
the report will be placed in the Public Document
Room.
'
9P7050 3ZB
t
(tI
t
i'
Hashington Public Power Supply System
.- 2-
APR 26 8%
Should you have
any questions
concerning this inspection,
we will
be glad to discuss
them with you.
Sincerely,
Enclosures:
4 bM
G.
S: Spencer,
Chief
Reactor Construction
and
Engineering
Support Branch
IE Inspection
Report
No. 50-397/79-06
cc w/o enclosure:
M.
E. >litherspoon, Division Manager
equality Assurance,
llPPSS
A.
D. Kohler,= Manager
llNP-'2 Project
0
li
I
I
,j
I,
~
'