ML17272A352

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/79-02 on 790130-0201. No Noncompliance Noted
ML17272A352
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/16/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A353 List:
References
NUDOCS 7903300348
Download: ML17272A352 (4)


See also: IR 05000397/1979002

Text

+'P,II II60>

Wp.0

gl

A.

I

nO

IP

O~

0p*y4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202, WALNUTCREEK PLAZA

1990 N. CALIFORNIABOULEVARD

WALNUT CREEK, CALIFORNIA 94596

FEB 16 ]979

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, Washington

99352

Attention:

Mr. N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection of WNP-2 (Preoperational

Test

Phase)

This refers to the inspection

conducted

by Messrs.

P. Johnson

and

J. Cavlson of this office on January

30 - February 1, 1979, of

activities authorized

by

NRC Construction

Permit No. CPPR-93,

and

to the discussion of our findings held by the inspectors with Messrs.

J. Martin; D. Howard, J. Holder, and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described

in the enclosed

inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

weve identified within

the scope of this inspection.

In accordance with Section .2.790 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement

of the reasons

why it is claimed that

the information is pvopvietary.

The application should

be prepared

so

T9O39OOSyg

r

f

(

Washington Public Power Supply System

-2-

FEB 16

'1979

that any proprietary information identified is'ontained

in an enclosure

- to the application, since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

No. 50-397/79-02

I/7

c8

/.ao'.

L. Crews, Chief

Reactor Operations

d

Nuclear Support. Branch

cc w/o enclosure:

K. T. Perkins, Assistant Director

Generation,

WPPSS

J.

D. Martin, Nanager

WNP-2 Startup

and Operation

(

E

0'