Forwards IE Insp Rept 50-397/78-11 on 781114-17.No Noncompliance Noted
ML17272A306
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/09/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17272A307 List:
References
NUDOCS 7902260030
Download: ML17272A306 (4)


See also: IR 05000397/1978011

Text

6'I60IJ

Wp0

J

o~

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

SUITE 202, WALNUTCREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEKy CALIFORNIA 94596

January

9,

1979

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland, llashington

99352

Attention:

ter.

N. 0. Strand

Managing Director

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project

No. 2(lNP-2)

This refers to the inspection

conducted

by Messrs.

T. tl. Bishop,

L.

E. Vorderbrueggen,

and

G. Hernandez of this office on November 14-17,

1978 of activities authorized

by

NRC Construction

Permit No.

CPPR-93,

and to the discussion of our findings held by Hr. Bishop with tlr. Renberger

and other members of'our staff at the conclusion of the inspection.

Areas examined during this inspection are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the

NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

790 88600c

I

h

e

t

l

P

llashington Public Power Supply System

-2-

January

9,

1979

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document

Room.

Should you have any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincer ely,

G. S. Spencer,

Chief

Reactor Construction

and

Engineering

Support

Branch

Enclosure:

IE Inspection

Report

No. 50-397/78-11

cc w/o enclosure:

H.

E. llitherspoon, Division Manager

guality Assurance,

llPPSS

A. D. Kohler, Manager

WNP-2 Project

I

l

0

0